J and A for Brand Name-Sole Source - AMU - Johnson Controls.pdf
PDF 234 KB Posted
- Attached to
- Aircraft Maintenance Unit (AMU) Federal contract opportunity
- Solicitation number
- W50S6N-23-B-0001
About this file
This document contains a justification and approval for sole source items within a construction project for the Aircraft Maintenance Unit facility at Dannelly Field Air National Guard Base in Montgomery, Alabama. The project requires installation of a new Johnson Controls heating, ventilating, and air conditioning system with direct digital controls, which is the only system compatible with existing controls at the base. Additional sole source items include fire alarm, security, and access systems from Monaco, Stanley Best Access Systems, and Advantor respectively, all due to compatibility with existing installed systems. The construction contract will be awarded on a firm fixed price basis for $10 million or more through a full and open competitive solicitation. The North American Industry Classification for the work is 236210, with a small business size standard of $45 million. The performance period is 450 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval for Other Than Full and Open Competition
Sole Source Items within a Construction Project AFARS 5153.303-5
Contracting Activity: USPFO Alabama
Description of Action
Type of Action: Contract Type: Funding Type:
Description of Supplies/Service
Name and describe the required supplies/services
Authority Cited:
Reason for Authority Cited:
Estimated Value of Sole Source Components:
Efforts to Obtain Competition:
Actions to Increase Competition:
Market Research:
Interested Sources:
Other Facts:
Technical Certification:
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
Requirements Certification:
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
Contracting Officer Certification:
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date:
Approval:
Based on the foregoing justification, I hereby approve the procurement of on an other than full and open competition basis pursuant to the authority of:
subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
| Dropdown1: [New Contract] |
| Dropdown2: [Firm Fixed Price] |
| Dropdown3: [MILCON] |
| Text5: FAKZ169003 - F-35 Construct AMU Maintenance Facility |
- Johnson Controls: The project will consist of installation of new heating, ventilating, and air conditioning systems throughout the facility. This will include new Direct Digital Controls.
Text6: United States Code 3304(a)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency requirements.
| Text7: The 187th exclusively utilizes Johnson Controls for HVAC system's Direct Digital Controls. This is the only manufacturer that is utilized to allow for standardization and guaranteed interoperability. To build a structure that did not utilize this system would compromise the ability to control,monitor, and reduce energy consumption to the maximum extent possible. Utilizing other manufacturers would necessitate the purchase of additional centralized monitoring systems for the the AMU Maintenance Facility and Civil Engineering B1801. | |
| Text8: A pre-solicitation notice was placed in beta.sam.gov in order to give contractors an early notification of this project. | |
| Text9: N/A | |
| Text10: The Johnson Controls system is proprietary, no other solutions will be compatible with the centralized monitoring equipment/system that is currently in place at the 187th Fighter Wing. | |
| Text11: N/A | |
| Text12: The Johnson Controls system is the only product that is compatible with the occupied facilities at the 187th. | |
| 2021-12-01T08:58:07-0600 | |
| SANDERS.ADAM.WAYNE.1110351549 |
| Text13: 01-Dec-2021 | |
| name 1: Maj Adam Sanders | |
| Position 1: 187 FW Base Civil Engineer | |
| 2021-12-01T08:58:35-0600 | |
| SANDERS.ADAM.WAYNE.1110351549 |
| 2023-04-19T19:23:25-0500 | |
| KAST.WILLIAM.CRAIG.1110182933 |
| Text19: Johnson Controls System. |
| Text20: United States Code 3304(a)(1) FAR 6.302-1(a)(2)(ii)(B), Only one responsible source and no |
other supplies or services will satisfy agency
| Text14: 19-Apr-2023 | |
| name 2: William "Craig" Kast | |
| Position 2: Contracting Officer | |
| Text15: 19-Apr-2023 | |
| name 3: William "Craig" Kast | |
| Position 3: Contracting Officer | |
| 2023-04-19T19:23:40-0500 | |
| KAST.WILLIAM.CRAIG.1110182933 |
| Text5000: |
| Dropdown999: [] |
File details come from the government source that posted it. Updated .