RFI Responses 002 .pdf

PDF 110 KB Posted

Attached to
Aircraft Maintenance Unit (AMU) Federal contract opportunity
Solicitation number
W50S6N-23-B-0001
Issued by
Department of the Army Alabama Army National Guard

About this file

This document contains responses to an Request for Information related to a federal construction contract opportunity. The responses provide clarification that solid core PVC piping and two-bolt riser clamps will be acceptable substitutions under the specifications. Demountable partition walls are to terminate at bulkheads constructed of gypsum wallboard and metal studs at varying elevations, and the full height walls indicated in plans will combine demountable and gypsum construction.

The related federal contract opportunity is a solicitation for construction services to build an 18,000 square foot Aircraft Maintenance Unit facility at Dannelly Field Air National Guard Base in Montgomery, Alabama. The single award firm fixed-price design-bid-build contract has a 450 calendar day period of performance and 100% small business set-aside with a NAICS code of 236210 and size standard of $45,000,000. The project scope includes site work, foundations, and mechanical, electrical and utility relocation for a new two-story building.

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Maintenance Unit (AMU), newest first.
File Type Posted
OF 1419 Abstract.pdf PDF
Amendment 0005.pdf PDF
W50S6N-23-B-0001 0005.pdf PDF
W50S6N-23-B-0001 0004.pdf PDF
Amendment 0004.pdf PDF
FAKZ169003 Addendum No. 3 SIGNED.pdf PDF
Amendment 0003.pdf PDF
RFI Responses 001 SIGNED.pdf PDF
PreBid sign in sheeet.pdf PDF
Pre Bid Slides_ AMU1.pptx PPTX presentation
FAKZ169003 AMU TYPE B3 VOLUME II SPECS_SIGNED.pdf PDF
Amendment 0002.pdf PDF
FAKZ169003 Addendum No. 2 SIGNED.pdf PDF
W50S6N-23-B-0001 0002.pdf PDF
FAKZ169003 TYPE B3 DRAWINGS VOLUME 1 SIGNED.pdf PDF
J and A for Brand Name-Sole Source - AMU - Best Locks.pdf PDF
FAKZ169003 Addendum No. 1 SIGNED.pdf PDF
J and A for Brand Name-Sole Source - AMU - Moduline Series Paver System.pdf PDF
FAKZ169003 TYPE B3 DRAWINGS VOLUME 2 SIGNED.pdf PDF
EAL.pdf PDF
J and A for Brand Name-Sole Source - AMU - Monaco.pdf PDF
J and A for Brand Name-Sole Source - AMU - Moduline Series Paver System (1).pdf PDF
J and A for Brand Name-Sole Source - AMU - Johnson Controls.pdf PDF
J and A for Brand Name-Sole Source - AMU - Advantar.pdf PDF
Amendment 0001.pdf PDF
W50S6N-23-B-0001.pdf PDF
FAKZ169003 AMU TYPE B3 VOLUME II SPECS.pdf PDF
FAKZ169003 AMU TYPE B3 VOLUME 1 SPECS.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 06 July 2023

To: CMSgt. William Hall

Subject: RESPONSES TO RFI #002

Project: AIRCRAFT MAINTENANCE UNIT FACILITY

Job #: ANG# FAKZ169003 / SSL# 18153

From: Jake Johnson

1) Question: Spec 220000, 1.19, D refers to stenciled pipe markers. Are wrap-around style pipe markers

Response: Yes.

2) Question: Spec 220000, 2.2A.1 calls for service weight cast iron to be used underground. Is it acceptable to use Sch 40 PVC below the slab? This will not only be more cost-effective for the owner, but we are concerned about delivery and lead times for service weight cast iron. It is not stocked in the Montgomery area and any extra or unforeseen fittings would have to be ordered by UPS.

Response: Solid Core PVC with appropriate solvent cement joints will be acceptable. Cellular core PVC will not be allowed.

3) Question: Spec 220000, 2.2, C.1 calls for sump pump discharge to be Sch 40 PVC.

Is it acceptable to use Sch 40 PVC for the sanitary and vent piping above slab as well?

Response: Solid Core PVC with appropriate solvent cement joints will be acceptable. Cellular core PVC will not be allowed.

4) Question: Spec 220000, 2.10, A calls for pipe sleeves to be installed. Is it acceptable to core drill penetrations instead? These can be done after walls are laid out, which allows for greater accuracy.

Response: Yes.

5) Question: Spec 220000, 2.12, E.2 calls for four-bolt riser clamps. These are considered special order and are extremely hard to obtain. Can standard two-bolt riser clamps be used instead?

Response: Two-bolt acceptable.

6) Question: I see where there is spec for Aluminum Blast Resistant Doors. I do not see any specification for Hollow Metal Blast Resistant Doors. The only place I see

AIRCRAFT MAINTENANCE UNIT FACILITY FAKZ169003

RESPONSES TO RFI NO. 001 Page 2 of 2

Seay Seay & Litchfield, P.C. 20 June 2023 mention of Blast Resistant Doors is in the Hollow Metal Specification 081113 page 5, section2.01 paragraph D.1 and 2.03 paragraph A, mentions “ASTM F 2247 as noted in section B-3.2.1 of UFC at all exterior doors”. This reference appears to be about line of sight to doors. Paragraph 2.03 A mentions ASTM F 2247 where applicable.

Are all exterior doors to be quoted as Blast Resistant or just the entry doors? If there are hollow metal blast resistant doors require, we need to know the Standoff distance in feet, the Explosive Weight in feet, the peak pressure in psi, the impulse (psi-msec), rebound percentage, and the post blast performance required.

Response: Exterior glazed entrances are to be blast resistant, exterior hollow metal doors are not required to be blast resistant.

7) Question: Bid Option #5 – Demountable Partitions. How are the demountable partitions supposed to terminate at the head condition? Do they frame into the ceiling grid (slot grid is not specified) or do we need to provide a sheetrock bulkhead from the roof deck down to the grid line. I do not believe it is practical / possible to try and extend the demountable partitions all the way to the roof deck as is noted on sheet

A2.7.

Response: Demountable partitions are to terminate at gypsum and metal stud bulkheads / walls at varying elevations. Refer to A3.7 for partition heights, and

A8.1 / A8.2 for ceiling elevations and details. In the event that the bid option is awarded, the full height walls indicated on A2.7 will be a combination of demountable partitions and gypsum wallboard and metal stud construction.

End of Response to RFI #002