Amendment 0002.pdf

PDF 134 KB Posted

Attached to
Aircraft Maintenance Unit (AMU) Federal contract opportunity
Solicitation number
W50S6N-23-B-0001
Issued by
Department of the Army Alabama Army National Guard

About this file

This document provides details on an amendment to a federal solicitation for construction services. The amendment incorporates addendum number two, which changes product part numbers under several contract line items and adds one line item for an alternate foundation design. If awarded, this line item would replace the original engineered fill pad and shallow foundations with drilled concrete piers, grade beams, and structural floor slabs. The amendment also provides inspection and acceptance schedules for the new line item. The related opportunity notice is for construction of an 18,000 square foot aircraft maintenance unit at an Air National Guard facility in Montgomery, Alabama, with a 450-day period of performance. Services include sitework, building foundations, and relocation of existing utilities. The project value is over $10 million and is set aside 100% for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Maintenance Unit (AMU), newest first.
File Type Posted
OF 1419 Abstract.pdf PDF
RFI Responses 002 .pdf PDF
Amendment 0005.pdf PDF
W50S6N-23-B-0001 0005.pdf PDF
W50S6N-23-B-0001 0004.pdf PDF
Amendment 0004.pdf PDF
FAKZ169003 Addendum No. 3 SIGNED.pdf PDF
Amendment 0003.pdf PDF
RFI Responses 001 SIGNED.pdf PDF
PreBid sign in sheeet.pdf PDF
Pre Bid Slides_ AMU1.pptx PPTX presentation
FAKZ169003 AMU TYPE B3 VOLUME II SPECS_SIGNED.pdf PDF
FAKZ169003 Addendum No. 2 SIGNED.pdf PDF
W50S6N-23-B-0001 0002.pdf PDF
FAKZ169003 TYPE B3 DRAWINGS VOLUME 1 SIGNED.pdf PDF
J and A for Brand Name-Sole Source - AMU - Best Locks.pdf PDF
EAL.pdf PDF
J and A for Brand Name-Sole Source - AMU - Monaco.pdf PDF
J and A for Brand Name-Sole Source - AMU - Moduline Series Paver System (1).pdf PDF
J and A for Brand Name-Sole Source - AMU - Johnson Controls.pdf PDF
J and A for Brand Name-Sole Source - AMU - Advantar.pdf PDF
FAKZ169003 Addendum No. 1 SIGNED.pdf PDF
J and A for Brand Name-Sole Source - AMU - Moduline Series Paver System.pdf PDF
FAKZ169003 TYPE B3 DRAWINGS VOLUME 2 SIGNED.pdf PDF
Amendment 0001.pdf PDF
W50S6N-23-B-0001.pdf PDF
FAKZ169003 AMU TYPE B3 VOLUME II SPECS.pdf PDF
FAKZ169003 AMU TYPE B3 VOLUME 1 SPECS.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 w ill incorporate Addendum No. 2 dated 25 May 2023.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-May-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6N23B0001

X 9B. DATED (SEE ITEM 11)

23-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2023

CODE

USPFO AL 187 MISSION SUPPORT CONTRACTING

5187 SELMA HIGHWAY

MONTGOMERY AL 36108-4824

W50S6N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S6N23B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0004

The manufacturer part number has changed from Bid Option 2 to Bid Option 3.

CLIN 0005

The manufacturer part number has changed from Bid Option 2 to Bid Option 4.

CLIN 0006

The manufacturer part number has changed from Bid Option 2 to Bid Option 5.

CLIN 0007 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Job OPTION Bid Option No. 6: Alternate Foundation

FFP

Bid Option No.6 (Additive): Alternate Foundation Design (Added by Addendum)

1. This Bid Option shall include all plant, labor, and material for the following:

a. Installation of alternate foundation system consisting of drilled concrete piers, grade beams, and structural floor slabs as indicated on the addendum drawings in lieu of an engineered fill pad with shallow footings and ground supported floor slabs indicated in the original project drawings.

b. Additionally, this Bid Option includes the following changes to the civil scope of work as outlined in the addendum drawings:

i. Modify extents and depths of building undercut.

ii. Revised compaction requirements and grading profiles for below slab subgrades as indicated on the addendum drawings.

iii. Revised building undercut back fill materials.

iv. Revised placement of foundation drainage systems as indicated on the addendum drawings.

c. If this Bid Option is not awarded, the Contractor shall install the engineered fill pad, foundation drainage system, shallow foundations, and ground supported floor slabs indicated on the original project drawings as part of the base bid.

d. if this Bid Option is awarded, the Contractor shall install the revised perimeter foundation drain system, drilled concrete piers, grade beams, and structural floor slabs indicated on the addendum drawings in lieu of the engineered fill pad, foundation drainage system, shallow foundations, and ground supported floor slabs indicated on the original project drawings.

e. It is the Government's intent to conduct geotechnical investigations prior to award of the Contract for Construction which will confirm the required foundation systems based upon recently completed contaminated soil remediation activities.

Pending the results of the geotechnical investigation, the Contract for Construction will include the award of either the Base Bid (engineered fill pad with shallow foundations and ground supported floor slabs) or the Base Bid plus this Bid Option (net increase in cost to provide drilled piers, grade beams, and structural floor slabs in lieu of the engineered fill pad, shallow foundations, and ground supported floor slabs).

FOB: Destination MFR PART NR: Bid Option 6

PSC CD: Y1AZ

NET AMT

DELIVERIES AND PERFORMANCE

The following Delivery Schedule for CLIN 0007 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

450 dys. ANP 1 F6L31D--187TH CIVIL ENGINEERING

(SRM)

WILLIAM SANFORD, MAJ

5187 SELMA HIGHWAY

MONTGOMERY AL 36108-4824

334-394-7953 FOB: Destination

F6L31D

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0007:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)