Y25-729_AccessDiagram-R02-F.pdf
PDF 1 MB Posted
- Solicitation number
- Y25-729
- Issued by
- Orange County, Orlando City, Florida
About this file
The document is a Site Access and Potential Staging Area Diagram for the Orange County Convention Center (OCCC) North South Meeting Room Renovation project in Orlando, Florida. The diagram provides a detailed site layout showing existing exhibit halls, parking areas, loading docks, and freight elevators, with a total of approximately 4,600 parking spaces (3,600 paved and 850 grass). The project involves renovation of meeting rooms, with potential future expansion noted as Phase 5A. The site is located between Universal Boulevard and International Drive, with multiple freight elevators of varying capacities (8,000 to 18,000 lbs) and two loading dock areas marked for heavy equipment and lighting equipment use.
The diagram highlights key site infrastructure, including parking distribution (C.E.P. area with 150 spaces, grass parking areas), elevation markers, and potential staging zones. The project is part of a broader solicitation by Orange County, Florida, with an estimated project cost of $45,700,067.00. Electronic bid submissions are required through the OpenGov e-Procurement Platform, with bids due by 4:00 pm EST on Thursday, January 16, 2025. Potential bidders are required to create a free account on the platform and can submit questions about the solicitation until December 31, 2024, at 4:00 pm EST through the platform's question and answer module.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 15
15 15
15 15
151515
151515
15 15 15
16 16 16 16
161616 16
16 16
20 20
16 16 16
1616 16
1616 16 16 16
1616 161616
1515 151515151515 151515
16 16
Paved Parking
App. 3600 spaces
Grass Parking
Total
Grass Parking
C.E.P.
850 spaces
150 spaces
BUS 40'
TOB AREA = 6.9
TOB = 96.7
NCL = 92.5
TOB AREA = 8.2
TOB = 96.6
NCL = 89.5
95.7
87.5
83.5
89.5
85.089.0
96.7
91.0
96.7
96.7
96.7
UNIVERSAL BOULEVARD
INTERNATIONAL DRIVE
161616
E.A.C.
BUS 40'
STAIR PLATFORM
100'-0"
MID LANDING
N10N09N08N07N06N05N04N03N02N01 N18N17N16N15N14N13N12N11 N25N24N23N22N21N20N19 N34N33N32N31N30N29N28N27N26 N40N39N38N37N36N35
S09S08S07S06S05S04S03S02S01 S17S16S15S14S13S12S11S10 S24S23S22S21S20S19S18 S33S32S31S30S29S28S27S26S25 S38S37S36S35S34 S49S48S47S46S45S44S43S42S41S40S39
SK
SK
SK
SK
100'-0"
97'-0"
96'-0"
97'-0" 97'-0"
FREIGHT
ELEVATOR
NF3-E
12,000 lbs
FREIGHT
ELEVATOR
SF1-E
18,000 lbs
FUTURE
PHASE 5A
EXPANSION
SITE
NORTH LOADING DOCK
SOUTH LOADING DOCK
SITE ACCESS AND POTENTIAL STAGING AREA DIAGRAM
N.T.S
CIP0965-27 OCCC NS MEETING ROOM RENOVATION
EXISTING EXHIBIT HALL
EXISTING PARKING
EXISTING PARKING
NORTH
FREIGHT
ELEVATOR
NS3-E
8,000 lbs
FREIGHT
ELEVATOR
SS2-E
8,000 lbs
FREIGHT
ELEVATOR
LEGEND:
HEAVY EQUIPMET
USE
LIGHTING EQUIPMET
USE
File details come from the government source that posted it. Updated .