WDS Middle School Logistics Plan.pdf
PDF 1 MB Posted
- Solicitation number
- RFP WDS 270000000188 2
- Issued by
- Michigan
About this file
This is a Site Logistics Plan for the Whitehall Middle School construction project, part of the WDS Bond Proposal Phase 1 in Michigan. The plan documents the phased construction schedule and site management strategy for the middle school renovation project. Construction is scheduled in two phases: Phase 1 from April 2, 2027 to June 4, 2027 (concluding before the last day of school), and Phase 2 from June 7, 2027 to August 11, 2027 (during summer break). The document specifies that the construction entrance and exit points, rear entrance and exit, temporary construction fencing, dumpster locations, portable toilet placement, and emergency egress routes have been designated. Emergency egress access is restricted to summer break periods only. Clark Construction has established its field office at the White Lake Community Center, located at 541 E. Slocum Street in Whitehall, Michigan 49461. The plan identifies designated areas for contractor parking, the boiler room location, and construction delivery routes to minimize disruption to school operations.
The logistics plan establishes clear site management parameters to facilitate construction activities while maintaining school functionality during the academic year. The phased approach allows the contractor to complete initial work before students and staff vacate the building for summer, then complete remaining construction during the summer break when the facility is unoccupied. The detailed mapping of site access points, equipment staging areas, and traffic patterns demonstrates coordination between Clark Construction and the Whitehall District Schools to ensure safety and operational continuity throughout the construction period.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TomBrennan Polygon
TomBrennan Polygon
TomBrennan PolyLine
TomBrennan PolyLine
TomBrennan Rectangle
TomBrennan Rectangle
TomBrennan Ellipse
TomBrennan Text Box
LEGEND
CONSTRUCTION AREA (4/2/2027 TO 6/4/2027)
CONSTRUCTION AREA (6/7/2027 TO 8/11/2027)
TEMPORARY CONSTRUCTION FENCING
DUMPSTERS
PORTABLE TOILETS
CONSTRUCTION DELIVERY ROUTE
TomBrennan Rectangle
TomBrennan Switch
TomBrennan Rectangle
TomBrennan Switch
TomBrennan Callout
EMERGENCY EGRESS ONLY
DURING SUMMER BREAK
TomBrennan Callout
GATE
TomBrennan Callout
GATE
TomBrennan Callout
GATE
TomBrennan Text Box Whitehall Middle School Site Logistics Plan
TomBrennan Text Box
CLARK CONSTRUCTION FIELD OFFICE
White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461
TomBrennan Callout
CONSTRUCTION ENTRANCE/EXIT
TomBrennan Ellipse
TomBrennan Ellipse
TomBrennan Ellipse
TomBrennan Text Box
KEY DATES
Construction Start Date: 4/2/2027 Last Day of School: 6/4/2027 Construction End Date: 8/11/2027
TomBrennan Callout
CONSTRUCTION REAR ENTRANCE/EXIT
TomBrennan Rectangle
TomBrennan Text Box
BOILER ROOM
TomBrennan Rectangle
TomBrennan PolyLine
TomBrennan Polygon
TomBrennan Text Box
CONTRACTOR
PARKING