WDS Middle School Logistics Plan.pdf

PDF 1 MB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 2
Issued by
Michigan

About this file

This is a Site Logistics Plan for the Whitehall Middle School construction project, part of the WDS Bond Proposal Phase 1 in Michigan. The plan documents the phased construction schedule and site management strategy for the middle school renovation project. Construction is scheduled in two phases: Phase 1 from April 2, 2027 to June 4, 2027 (concluding before the last day of school), and Phase 2 from June 7, 2027 to August 11, 2027 (during summer break). The document specifies that the construction entrance and exit points, rear entrance and exit, temporary construction fencing, dumpster locations, portable toilet placement, and emergency egress routes have been designated. Emergency egress access is restricted to summer break periods only. Clark Construction has established its field office at the White Lake Community Center, located at 541 E. Slocum Street in Whitehall, Michigan 49461. The plan identifies designated areas for contractor parking, the boiler room location, and construction delivery routes to minimize disruption to school operations.

The logistics plan establishes clear site management parameters to facilitate construction activities while maintaining school functionality during the academic year. The phased approach allows the contractor to complete initial work before students and staff vacate the building for summer, then complete remaining construction during the summer break when the facility is unoccupied. The detailed mapping of site access points, equipment staging areas, and traffic patterns demonstrates coordination between Clark Construction and the Whitehall District Schools to ensure safety and operational continuity throughout the construction period.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TomBrennan Polygon

TomBrennan Polygon

TomBrennan PolyLine

TomBrennan PolyLine

TomBrennan Rectangle

TomBrennan Rectangle

TomBrennan Ellipse

TomBrennan Text Box

LEGEND

CONSTRUCTION AREA (4/2/2027 TO 6/4/2027)

CONSTRUCTION AREA (6/7/2027 TO 8/11/2027)

TEMPORARY CONSTRUCTION FENCING

DUMPSTERS

PORTABLE TOILETS

CONSTRUCTION DELIVERY ROUTE

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Callout

EMERGENCY EGRESS ONLY

DURING SUMMER BREAK

TomBrennan Callout

GATE

TomBrennan Callout

GATE

TomBrennan Callout

GATE

TomBrennan Text Box Whitehall Middle School Site Logistics Plan

TomBrennan Text Box

CLARK CONSTRUCTION FIELD OFFICE

White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461

TomBrennan Callout

CONSTRUCTION ENTRANCE/EXIT

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Text Box

KEY DATES

Construction Start Date: 4/2/2027 Last Day of School: 6/4/2027 Construction End Date: 8/11/2027

TomBrennan Callout

CONSTRUCTION REAR ENTRANCE/EXIT

TomBrennan Rectangle

TomBrennan Text Box

BOILER ROOM

TomBrennan Rectangle

TomBrennan PolyLine

TomBrennan Polygon

TomBrennan Text Box

CONTRACTOR

PARKING

File details come from the government source that posted it. Updated .