This file is an Interior Logistics Plan for Whitehall Middle School, a project within the Whitehall District Schools in Michigan. The document consists of detailed architectural floor plans for the first floor of the school, including Unit B, and provides comprehensive layouts for various spaces such as the cafeteria, kitchen, gymnasium, classrooms, science labs, media center, offices, and support facilities. The plan is dated September 30, 2026, with project number 25146, and includes multiple units (Units A through E) with room-by-room designations and square footage measurements. The plans are presented at scales of 1/8" = 1'-0" and 1/4" = 1'-0", with a sheet size of 30" x 42".

The document contains detailed keyed notes and specifications for construction work, including custom millwork, countertop installation with solid surface materials and supporting brackets every 36 inches on center, new horizontal unit ventilators, wall louvers, patching and repair of existing walls and floors following mechanical, plumbing, and electrical removal, and door refinishing options. The plan indicates areas with asbestos-containing materials requiring coordination with an abatement contractor. Notably, several areas are marked as "NOT IN SCOPE," and the document references temporary construction wall installation as part of BID CATEGORY 06A, which includes temporary floor protection. Additional coordination requirements with mechanical, electrical, and plumbing trades are specified throughout, with field verification and architect notification required for routing challenges and construction coordination.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18X48

X

18X60 18X48

18X60 18X4818X48

X

18X48

X

X

X

24X42

X

24X48 24X48

24X48 24X48

X

18X3618X36

18X4818X48

18X48

X

36X72 36X72

24x48

CAFETERIA

B104

KITCHEN

B110

BAND

33CHOIR

GYM

AUXILLARY GYM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

SMALL GROUP

CLASSROOM

CLASSROOM

BOILER ROOM

TOILETTOILET

CLASSROOM

OFFICE

MDF TOILET TOILET

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

SCIENCE LAB

CLASSROOM

MEDIA CENTER

CLASSROOM

CLASSROOM

01 LARGE GROUP

LEARNING

CENTER

CLASSROOM

OFFICE

CLASSROOM

TOILETSTOILETS

CLASSROOM

CLASSROOM

CLASSROOM

SCIENCE LAB

ART ROOM

TEACHERS

LOUNGE

TRAINING

IT

RECEPTION

PRINCIPALOFFICE

OFFICE

OFFICE VESTIBULE

COMMONS

MEN'S LOCKER

WOMEN'S

LOCKER

LOCKER ROOMS

MENS

B101

WOMENS

B102

UNIT B

UNIT C

U N

IT A

U N

IT B

U N

IT

D

U N

IT

C

U N

IT

E

U N

IT

D

U N

IT

E

U N

IT

A

ELEC.

B117

A101

GRAPHICS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

SERVING

B105

STORAGE

B116

WALK-IN COOLER

B115

FREEZER

B114

DOCK

B113

STOR.

B108

A LA CARTE

B107

MECH.

B103

CORR

B100

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN

SCOPE

NOT IN SCOPE

7 7 7 7 7

7 7

7 7 7

7 7

7 7

7 7

NEW PAD IN MEZZANINE, SEE MEP

NEW PAD IN MEZZANINE, SEE MEP

TYP

CLASSROOM

METAL PIPE ENCLOSURE FROM CEILING TO

UNIT, BY MECH. CONTRACTOR. PROVIDE

HEAVY GAUGE METAL TO AVOID OIL-

CANNING. INSTALL FOR AN AESTHETICALLY

CLEAN AND ORGANIZED FINISH PRODUCT.

FIELD VERIFY ROUTE, NOTIFY ARCHITECT

OF ROUTING CHALLENGES AS REQUIRED.

A101

A101

MECHANICAL UNIT BELOW, SEE MEP

BENT METAL CHASE ENCLOSURE, SIZE

MTL GAUGE TO AVOID OIL CANNING

2-1/2" CFMF

MEP PIPING FOR NEW UNIT, MOUNT

TIGHT TOGETHER AS CODE ALLOWS

/2

EXIST. WALL, FIELD VERIFY

CONSTRUCTION

COORD. W/ MEP

1' - 7" +/-

F .V

. C E

IL

IN

G H

E

IG

H T

EXIST. CEILING

EXIST. WINDOW

NEW MECH. UNIT

EXPOSED PIPING ABOVE CEILING

A101

EXIST. WALL BASE

NEW PIPE CHASE,

SEE DETAIL

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

W D

S M id d le S ch o o l

W h it eh al l D is tr ic t

S ch o o ls

S E li za b e th S t, W h it e h a ll

, M I

PROJECT NO. 25 146

A101

OVERALL FIRST FLOOR

PLAN

9.30.2026

NR

TH 3/64" = 1'-0"

OVERALL FIRST FLOOR PLAN

FLOOR PLAN KEYED NOTES

1 CUSTOM MILLWORK, SEE INTERIOR FINISH PLANS FOR

DETAIL

2 BUILT-IN SHELVING TO REMAIN, NO SCOPE

3 COUNTERTOP, NEW SOLID SURFACE AND SUPPORTING

BRACKETS EVERY 36" O.C. AT AREAS WHERE

COUNTERTOP IS OPEN UNDERNEATH. CONTRACTOR

WILL BE RESPONSIBLE FOR PROVIDING BRACKETS

APPROPRIATELY SIZED BASED ON DEPTH OF COUNTER.

4 NEW HORIZONTAL UNIT VENTILATOR. COORDINATE

WITH MECHANICAL DRAWINGS.

5 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

6 PATCH AND REPAIR EXISTING WALL WHERE PLUMB,

MECH, AND ELEC. HAS BEEN REMOVED. PREP FOR NEW

FINISH, COORDINATE W/ FINISH PLANS

7 PATCH AND REPAIR EXISTING FLOOR WHERE DEMO

OCCURED. PREP FOR NEW FINISH, COORDINATE W/

FINISH PLANS

8 ALT REFINISH EXISTING DOOR/ FRAME TO REMAIN,

DOOR TO BE STAINED WS01, FRAME TO BE PAINTED P04.

SEE FINISH PLANS AND SCHEDULE

9 ALT: REMOVE AND PROVIDE NEW ALUMINUM DOOR

AND FRAME SYSTEM TO MATCH BUILDING STANDARD

RED. PROVIDE NEW HARDWARE.

10 REPAIR EXISTING CRACK IN FLOORING, FIELD VERIFY

LOCATIONS - SEE STRUCT.

NO

TE

1/4" = 1'-0"1 TYPICAL CLASSROOM

UNIT A

UNIT B

UNIT C

UNIT D

UNIT E

KEY PLAN

N.T.S.

1 1/2" = 1'-0"3 TYP. PIPE CHASE DETAIL

1/4" = 1'-0"2 TYP. PIPE CHASE ELEVATION

SYM DATE ISSUED FOR

TomBrennan Polygon

TomBrennan Polygon

TomBrennan Line

TomBrennan Architect

PROPOSED LOCATION OF TEMPORARY CONSTRUCTION WALL WITH DOOR

TomBrennan Text Box AREA OF ASBESTOS CONTAINING MATERIALS AT EXISTING CEILING ABOVE NEWER ACOUSTIC CEILING. MEP TRADES TO COORDINATE WITH ASBESTOS ABATEMENT CONTRACTOR FOR LOCATIONS OF HANGERS, PENETRATIONS, ETC.

TomBrennan Text Box AREA OF ASBESTOS CONTAINING MATERIALS AT EXISTING ROOFING. MEP TRADES TO COORDINATE WITH ASBESTOS ABATEMENT CONTRACTOR FOR LOCATIONS OF HANGERS, PENETRATIONS, ETC.

18X48

X

18X60 18X48

18X60 18X4818X48

X

18X48

X

X

X

24X42

X

24X48 24X48

24X48 24X48

X

18X3618X36

18X4818X48

18X48

X

36X72 36X72

24x48

A301

A301

A301

A301

VESTIBULE

288 SF

BAND

STORAGE

CHOIR

CORRIDOR

SERVING

B105

WALK-IN COOLER

B115

OFFICE

B111

ELEC.

B117

STORAGE

B116

A LA CARTE

B107

KITCHEN

B110

CAFETERIA

B104

CORR

B100

MENS

B101

WOMENS

B102

CORRIDOR

UNIT B

UNIT C

U N

IT A

U N

IT B

A

A301

A301

M8

M8

M8

M8

M4

M4

M8

RECEIVING

B112

FREEZER

B114

25' - 0"

S6A

A601 5

B

B

B104D

B104C

B105B

M8

1"

W

E X

IS

T

. B R

IC

K

C O

U R

S

IN

G

C O

O R

D

16' - 4" 21' - 1 5/8"

INFILL EXISTING OPENING W/

MATCHING MATERIAL FLUSH

TO ADJACENT WALL.

A122

A121

DISH WASHING

B106

STOR.

B108

S3G

COMMONS

VESTIBULE

B104AB104B

B105A

B105D

B105E

B109

B108

B106B

B105F

S6A S6A

S6A

S6A

S6A

TYP ALL

SIDES

DN

A121 3

A121 2

A122

A122

A1224

CASEMENT WINDOW

PANEL, SEE FRAME

ELEVATIONS

B112

NEW HM CASED

OPENING

S3G

A601

A601

A601

MECH.

B103

A D

A

CR

ADA

(MULLION

MOUNTED)

ADA

(MULLION

MOUNTED)

TLT

B109

EXIST. STAIR

TO REMAIN

A601

A601

NOT IN

SCOPE

A421

A421

A411

A421

B117 7 A411

B111

8 8

6 6 6 6 6 6 6

6 6 6 6 6 6

B100-ALT

B116A-ALT

B116B-ALT

B112A-ALT

B112C-ALTB112B-ALT

B103-ALT

A421

TYP

B117D

I101

1 1 1

A421

14 TYP

SOUTH

COLS.

A421

NEW SITE CONCRETE, SEE SITE PLANS

NEW GRADE INFILL, SEE SITE PLANS

10 NEW PAD, SEE MEP

A301

MECH.

B103

GEOFOAM INFILL,

SEE STRUCT.

M8

TYP.

93' - 4"

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

W D

S M id d le S ch o o l

W h it eh al l D is tr ic t

S ch o o ls

S E li za b e th S t, W h it e h a ll

, M I

PROJECT NO. 25 146

A101B

FIRST FLOOR PLAN -

UNIT B

9.30.2026

NR

TH 1/8" = 1'-0"

FIRST FLOOR PLAN - UNIT B

UNIT B

KEY PLAN

N.T.S.

FLOOR PLAN KEYED NOTES

1 CUSTOM MILLWORK, SEE INTERIOR FINISH PLANS FOR

DETAIL

2 BUILT-IN SHELVING TO REMAIN, NO SCOPE

3 COUNTERTOP, NEW SOLID SURFACE AND SUPPORTING

BRACKETS EVERY 36" O.C. AT AREAS WHERE

COUNTERTOP IS OPEN UNDERNEATH. CONTRACTOR

WILL BE RESPONSIBLE FOR PROVIDING BRACKETS

APPROPRIATELY SIZED BASED ON DEPTH OF COUNTER.

4 NEW HORIZONTAL UNIT VENTILATOR. COORDINATE

WITH MECHANICAL DRAWINGS.

5 NEW WALL LOUVER IN EXISTING OPENING.

COORDINATE WITH MECHANICAL DRAWINGS.

6 PATCH AND REPAIR EXISTING WALL WHERE PLUMB,

MECH, AND ELEC. HAS BEEN REMOVED. PREP FOR NEW

FINISH, COORDINATE W/ FINISH PLANS

7 PATCH AND REPAIR EXISTING FLOOR WHERE DEMO

OCCURED. PREP FOR NEW FINISH, COORDINATE W/

FINISH PLANS

8 ALT REFINISH EXISTING DOOR/ FRAME TO REMAIN,

DOOR TO BE STAINED WS01, FRAME TO BE PAINTED P04.

SEE FINISH PLANS AND SCHEDULE

9 ALT: REMOVE AND PROVIDE NEW ALUMINUM DOOR

AND FRAME SYSTEM TO MATCH BUILDING STANDARD

RED. PROVIDE NEW HARDWARE.

10 REPAIR EXISTING CRACK IN FLOORING, FIELD VERIFY

LOCATIONS - SEE STRUCT.

NO

TE

NR

TH 1/8" = 1'-0"

MECH. FLOOR PLAN

SYM DATE ISSUED FOR

TomBrennan Architect

PROPOSED LOCATION OF TEMPORARY CONSTRUCTION WALL WITH DOOR

TomBrennan Line

TomBrennan Polygon

TomBrennan Architect

BID CATEGORY 06A - INCLUDE TEMPORARY FLOOR PROTECTION