05 - Middle School Existing Tunnel Location.pdf

PDF 1 MB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 2
Issued by
Michigan

About this file

This document is a First Floor Demolition Plan for Unit B of a middle school renovation project in Whitehall District Schools, Michigan, part of the WDS Bond Proposal Phase 1. The plan provides detailed demolition instructions and specifications for the selective removal of building components within the existing structure, including mechanical equipment, wall systems, windows, doors, flooring, plumbing fixtures, and electrical equipment. Key demolition tasks include the complete removal of an existing underground utility tunnel (approximately 4 feet wide and 2 feet deep, constructed with concrete over metal decking), preparation of concrete floors for new utility connections, removal and reinstallation of kitchen equipment designated for reuse, and salvage of unistrut components and panel molding for reintegration into new construction. The plan emphasizes contractor responsibility for inspecting existing conditions, verifying dimensions, coordinating with structural, mechanical, plumbing, and electrical trades, protecting existing finishes to remain, and patching all construction-related damage to match existing conditions.

The demolition scope requires contractors to salvage and preserve specific materials including carpet tile (not to be sent to landfill, coordinated with manufacturer reclamation), unistrut, and wood panel molding, while managing proper disposal and staging of removed materials. Contractor responsibilities include obtaining necessary permits, conducting saw-cutting operations per utility plans, protecting all racking and finishes scheduled to remain, and coordinating extensively with the owner, architect, and mechanical, electrical, and plumbing teams to ensure seamless integration with new work. The project sheet is dated September 30, 2026, and references the project address as 401 SE Elizabeth Street, Whitehall, Michigan 49461 (Project No. 25-146).

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE

EXISTING BUILDING PRIOR TO RELATED DEMOLITION

WORK. UNLESS NOTED OTHERWISE, REMOVAL OF ANY

WALL, FLOOR OR CEILING INCLUDES ALL GENERAL

MECHANICAL AND ELECTRICAL ITEMS WHICH ARE A PART

OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE

CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE

FOR THE SAME. ADVISE ARCHITECT OF ANY AND ALL

DISCREPANCIES.

3. PATCH FLOORS, WALLS AND CEILINGS DAMAGED DURING

CONSTRUCTION AND DEMOLITION AS REQUIRED. FINISH

TO MATCH EXISTING.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. PROTECT ALL EXISTING FINISHES TO REMAIN

THROUGHOUT PROJECT.

6. REFER TO DEMOLITION ELEVATIONS, SECTIONS AND

DETAILS FOR ADDITIONAL INFORMATION.

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL DEMOLITION NOTES.

8. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS FOR ADDITIONAL INFORMATION ON

SAW CUTTING AREAS

9. SALVAGE ALL UNISTRUT AND PROTECT FOR RE-USE IN

NEW CONSTRUCTION, IF REQUIRED.

10. AT LOCATIONS OF REMOVED WALLS, ALL ASSOCIATED

ITEMS ATTACHED TO THE WALL ARE TO BE REMOVED.

SUCH AS: DOORS, WINDOWS, FRAMES, MARKERBOARDS,

TACKBOARDS, TACK STRIPS, ETC.

GENERAL DEMOLITION NOTESNO

TE

1 1

4 4 4 4 4 4 4

1 1

CAFETERIACORR

UNIT B

UNIT C

U N

IT A

U N

IT B

W

E X

IS

T

. B R

IC

K

C O

U R

S

IN

G

C O

O R

D

1'

7' - 0"

3' - 0"

2' - 0"

/2

W A

L L

T O

R E

M A

IN

1/

E

X

IS

T

/2

W A

L L

T O

R E

M A

IN

1/

E

X

IS

T

KITCHEN

PASSAGE

STORAGE

EMPLOYEE

LOCKERS

TLT

CORRIDOR

STORAGE

STORAGE

COOLER

STORAGESTORAGE

DN

EXIST. STAIR

TO REMAIN

REFER TO EXTERIOR ELEVATIONS AND DETAILS FOR SELECTIVE DEMO ABOVE WINDOWS

JAN.

OFFICE

NOT IN

SCOPE

REMOVE EXISTING SILL AT WINDOWS TO BE REMOVED

REMOVE EXISTING FLOOR

SLAB COORDINATE W/

NEW WORK

DEMO EXISTING HOOD

SHOWN AS LIGHT

VERTICAL LINE HATCH

PROTECT ALL RACKING TO REMAIN

DEMO EXIST.

LIMESTONE SILL

GRIND CONCRETE FLOOR AROUND

EXPOSED CRACK TO PROVIDE LEVEL

SURFACE FOR NEW FLOORING.

PHOTO OF EXIST. EXTERIOR

WINDOWS

DEMO WINDOW SYSTEMS PER NEW WORK

DEMO E.I.F.S. (APPROX 2'-0") ABOVE WINDOWS

FOR NEW WINDOW AND ENTRY SYSTEMS.

CONDUCT A STRAIGHT DEMO/CUT ACROSS

EXISTING WALL FINISH. PROTECT EXISTING TO

REMAIN ABOVE NEW OPENINGS

DEMO LOUVERS AND INFILL WITH SALVAGED

BRICK

DEMO CAST STONE SILL AND

BRICK WALL BELOW WINDOW

SYSTEMS FOR NEW ENTRY

SYSTEMS

REMOVE EXISTING BRICK

MASONRY TO ACCOMMODATE

NEW WINDOW OPENING.

SHEET NUMBER

SHEET NAME

REVISIONS

ISSUE DATE

©2026

SHEET SIZE

30 x 42

W D

S M id d le S ch o o l

W h it eh al l D is tr ic t

S ch o o ls

S E li za b e th S t, W h it e h a ll

, M I

PROJECT NO. 25 146

D101B

FIRST FLOOR

DEMOLITION PLAN -

UNIT B

9.30.2026

DEMOLITION KEYED NOTES

1 REMOVE EXISTING MECHANICAL EQUIPMENT.

CORDINATE WITH MECHANICAL DRAWINGS. PREP FOR

NEW WORK.

2 REMOVE EXISTING WALL LOUVER. COORDINATE WITH

MECHANICAL DRAWINGS. PREP FOR NEW WORK

3 REMOVE EXISTING WALL AND ANY ITEMS ATTACHED TO

WALL. COORDINATE WITH MECHANICAL, ELECTRICAL,

AND PLUMBING DRAWINGS. ANY DEVICE REMOVAL

SHALL BE COORDINATED WITH OWNER.

4 REMOVE EXISTING STOREFRONT, WINDOW

TREATMENTS, AND ANY ATTACHMENTS.

5 REMOVE EXISTING DOOR AND FRAME.

6 REMOVE EXISTING ELECTRICAL EQUIPMENT.

CORDINATE WITH ELECTRICAL DRAWINGS. PREP FOR

NEW WORK.

7 REMOVE EXISTING FLOORING AND WALL BASE.

8 REMOVE PORTION OF EXISTING WALL. COORDINATE

WITH NEW WORK.

9 REMOVE EXISTING CURB. COORDINATE WITH NEW

WORK.

10 REMOVE EXISTING COUNTERTOPS AND PANEL

MOLDING. SALVAGE MOLDING FOR REUSE. CASEWORK

TO REMAIN. PREP FOR NEW SOLID SURFACE

COUNTERTOP MATERIAL.

11 REMOVE EXISTING WOOD FASCIA AS REQUIRED FOR

NEW METAL FASCIA AND NEW WOOD SUBSTRATE

INSTALL

12 REMOVE EXISTING PLUMBING FIXTURES. COORDINATE

WITH NEW WORK.

13 REMOVE EXISTING SIDEWALK PER LANDSCAPE PLANS

14 REMOVE EXISTING OVERHEAD COILING DOOR &

COUNTER

15 SAW CUT EXISTING CONCRETE FLOOR AS REQUIRED

FOR NEW UTILITY CONNECTIONS. COORDINATE WITH

NEW WORK

16 DEMO TUNNEL IN ITS ENTIRETY IN PREP FOR NEW SLAB

AND FLOOR FINISH

17 CONTRACTOR TO REMOVE, STORE, AND REINSTALL ALL

KITCHEN EQUIP SET TO BE REUSED. COORDINATE W/

OWNER AND NEW WORK

18 REMOVE EXISTING CARPET TILE AND WALL BASE.

CARPET TILE TO BE SAVED FOR RECLAIMATION AND

NOT SENT TO LANDFILL. CARPET TO BE STORED IN

STAGING AREA FOR PICK UP. CONTRCTOR IS

RESPONSIBLE FOR DEMO AND STAGING PER

MANUFACTURER GUIDELINES. COORDINATE WITH

CARPET TILE MANUFACTURER'S RECLAMATION

DEPARTMENT TO SCHEDULE PICKUP LOGISTICS

19 REMOVE EXISTING WOOD SOFFIT AND SUPPORT

FRAMING IN PREP FOR NEW

20 REFER TO ELECTRICAL FOR SCOPE AT ELECTRICAL

BOXES

NO

TE

NR

TH 1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

UNIT B

KEY PLAN

N.T.S.

SYM DATE ISSUED FOR

TomBrennan Polygon

TomBrennan Architect APPROXIMATE KNOWN LOCATION OF EXISTING PIPE UTILITY TUNNEL. SIZE OF TUNNEL VARIES, BUT IS ABOUT 4'-0" WIDE AND 2'-0" DEEP IN MOST AREAS. CONSTRUCTION OF TUNNEL LID IS CONCRETE OVER METAL DECKING

TomBrennan Text Box

FOR REFERENCE ONLY