Shoreline Elementary Site Logistics Plan Summary
This file is a site logistics plan for construction at Shoreline Elementary School in Michigan as part of the WDS Bond Proposal Phase 1 project involving Ealy Middle School and Shoreline Elementary. The plan designates construction areas, traffic management procedures, parking arrangements, and site access protocols for the project. Construction is scheduled to commence on June 7, 2027, and conclude on July 23, 2027. The plan establishes a construction area entrance and exit separate from public and school traffic, which will utilize the Market Street entrance. Clark Construction has designated its field office at the White Lake Community Center located at 541 E. Slocum Street, Whitehall, Michigan 49461.
The logistics plan includes provisions for traffic cones and barriers as needed, portable toilets at the construction site, designated contractor parking areas, and separate parking for WDS staff and visitors. The construction area will not be fully fenced, with traffic cones used to manage site boundaries and control access. This plan ensures minimal disruption to school operations and public traffic patterns during the construction period.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TomBrennan Polygon
TomBrennan Text Box
CONSTRUCTION AREA
(NO TEMPORARY FENCING)
TomBrennan PolyLine
TomBrennan Callout
TRAFFIC CONES (AS NEEDED)
TomBrennan PolyLine
TomBrennan Switch
TomBrennan Text Box Shoreline Elementary Site Logistics Plan
TomBrennan Text Box
LEGEND
CONSTRUCTION AREA (NOT FENCED)
TRAFFIC CONES/BARRIERS
PORTABLE TOILETS
TomBrennan Rectangle
TomBrennan Switch
TomBrennan Text Box
CONSTRUCTION AREA ENTRANCE/EXIT ONLY
PUBLIC AND SCHOOL TRAFFIC TO USE MARKET STREET ENTRANCE
TomBrennan Text Box
CLARK CONSTRUCTION FIELD OFFICE
White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461
TomBrennan Polygon
TomBrennan Text Box
CONTRACTOR
PARKING
TomBrennan Ellipse
TomBrennan Ellipse
TomBrennan Ellipse
TomBrennan Text Box
KEY DATES
Construction Start Date: 6/7/2027 Construction End Date: 7/23/2027
TomBrennan Polygon
TomBrennan Text Box
WDS STAFF AND VISITOR PARKING