This is Standard Form 30 (SF 30), Amendment 0008 to a federal contract solicitation, issued by the U.S. Army Corps of Engineers (W072 ENDIST LOUISVILLE, KY CONTRACTING DIVISION) on August 27, 2026. The amendment modifies solicitation W912QR26RA008, originally dated October 6, 2025, for the Caesar Creek HVAC Replacement project (HUBZONE MATOC). The contracting officer is Joel Huberman at the Louisville District office.
The amendment revises and replaces four specification sections in their entirety: Section 00 10 00 (Price Breakout Schedule), Section 01 02 10.00 06 (Project Description and Design Requirements), Section 01 11 05 (Statement of Work HVAC & Plumbing), and Section 01 11 06 (Statement of Work for Electrical and Communications Systems). The Phase II submission deadline has been established as Friday, September 11, 2026, at 2:00 PM EDT. The amendment updates the attachments list by replacing the original Price Breakout Schedule and Caesar Creek HVAC Replacement DB VOL 2 Package documents (dated July 1, 2026) with revised versions dated August 26, 2026. Offerors must acknowledge receipt of this amendment prior to the revised solicitation deadline through completion of form items 8 and 15, acknowledgment on each offer copy, or separate written communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in offer rejection.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following SPECIFICATION Block 14 (Description of Amendment/Modification):
SECTIONS have been revised and replaced in their entirety:
00 10 00 PRICE BREAKOUT SCHEDULE
01 02 10.00 06 PROJECT DESCRIPTION AND DESIGN REQUIREMENTS
01 11 05 STATEMENT OF WORK HVAC & PLUMBING
01 11 06 STATEMENT OF WORK FOR ELECTRICAL AND COMMUNICATIONS SYSTEMS
Phase II due date Friday, 11 September 2026 at 2:00 PM EDT.
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0003 00 10 00__Price Breakout Schedule_08.
26.2026
Statement of Work 27 Aug
Attach ment
No
0006 Caesar Creek
HVAC
Replacement DB VOL 2 Pack age__Revised_ 08.26.2026
Statement of Work 27 Aug
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0003 00 10 00__Price Breakout Schedule_08.
26.2026
Statement of Work 27 Aug
Attach ment
No
W912QR26RA0080008
0006 Caesar Creek
HVAC
Replacement DB VOL 2 Pack age__Revised_ 08.26.2026
Statement of Work 27 Aug
Attach ment
No
The following contract documents were added:
00 10 00__Price Breakout Schedule_08.26.2026 Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026
The following contract documents were deleted:
00 10 00__Price Breakout Schedule 128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
00 10 00__Price Breakout Schedule_08.26.2026 none
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026 none
W912QR26RA0080008
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0008 |
| EffDate: 27 AUG 2026 |
| ReqNo: |
| ProjNo: HUBZONE MATOC |
| IssCode: W912QR |
| AdmCode: |
| IssuedBy: W072 ENDIST LOUISVILLE |
KO CONTRACTING DIVISION, 220 W MAIN STREET 3RD FLOOR
LOUISVILLE, KY 40202-2230
UNITED STATES
JOEL HUBERMAN, EMAIL: JOEL.HUBERMAN@USACE.ARMY.MIL TELEPHONE: (502) 315-7409
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912QR26RA008 |
| SolDate: 06 OCT 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: JOHN BUTTS |
| ContDate: |
| CODate: 27 AUG 2026 |
File details come from the government source that posted it. Updated .