00 10 00__Price Breakout Schedule 07.09.2026 FINAL.docx
DOCX document 39 KB Posted
- Solicitation number
- W912QR26RA008
About this file
This is a Price Breakout Schedule template for evaluating proposals on an IDIQ Design/Build, Design-Bid/Build Multiple Award Task Order Contract (MATOC) for construction services. The document serves as an evaluation tool only and will be removed upon contract award. Offerors must complete pricing for a sample project involving HVAC system design and construction at Caesar Creek Lake Visitor Center Interpretive Center, with two primary line items: (1) Design of the existing HVAC system, and (2) Construction including demolition of the existing system and installation of new equipment consisting of three ground-mounted packaged units, multi-zone split VVT systems with gas furnaces, single-zone VVT packaged units, electrical work for new VVT terminals with electric reheat, and a new fan on the existing roof curb. Offerors must demonstrate use of fully burdened binding rates from the Base MATOC and provide supporting documentation including binding contract rates and estimated hours for Project Manager, Superintendent, CQC Manager, and Site Safety Health Officer positions.
The underlying MATOC (Solicitation W912QR26RA008), issued by the Department of the Army Corps of Engineers Louisville District, is a HUBZone set-aside contract with a total combined not-to-exceed capacity of $95,000,000 for construction services supporting Operations and Maintenance for civil and military projects within the Great Lakes and Ohio River Division mission boundaries. Only firms registered in the SBA HUBZone program are eligible to submit offers. The contract is structured as Phase I (initial awards) and Phase II (competitive task orders for selected awardees), with Phase II requirements outlined in Amendment 0005 posted July 9, 2026. NAICS Code 236220 applies with a $45,000,000 size determination threshold.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 10 00
PRICE BREAKOUT SCHEDULE
07/26
OFFEROR'S NAME: ___________________________________________
CONTRACT LINE ITEM SCHEDULE
Line Item No. Description Unit Price Amount
BASE PROPOSAL
| 0001. | Design: All work, materials, and labor required | ||
| to design the existing HVAC System at Caesar | |||
| Creek Lake Visitor Center Interpretive Center. | |||
| Job 1 | $ |
| 0002. | Construction: All work, materials, | ||
| and labor required to demolish the existing HVAC | |||
| System at Caesar Creek Lake Visitor Center | |||
| Interpretive Center. The Contractor will install a new | |||
| HVAC system. The Contractor will provide three new | |||
| ground mounted packaged units (PU), install a multi-zone | |||
| (3 zones) split VVT system with gas furnace for the office, | |||
| install a single zone VVT packaged unit in the auditorium, | |||
| install a single zone VVT packaged unit for the east end | |||
| display areas (three gallery rooms), install a single zone | |||
| VVT split system with gas furnace for the central reception, | |||
| restrooms, and west end multipurpose room, install a new | |||
| fan on the existing roof curb to provide required air flow | |||
| for the existing restrooms and janitor closet, and install new | |||
| electrical panel in the auditorium closet to support the two | |||
| new PUs on this side of the building. Electrical work for new | |||
| VVT terminals with electric reheat, office PU, and mechanical | |||
| split system will be required. | |||
| Job 1 | $ |
Total Base Proposal $_________________
TOTAL PROPOSAL $
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. The sample project Price Breakout Schedule will be removed at the time of contract award, as this is only for evaluation purposes.
NOTE NO. 2. The sample project is representative of the type of work that will be ordered under this MATOC.
NOTE NO. 3. Offerors must insert a price on all blank numbered items of the Schedule.
Show that you have used the fully burdened binding rates from the Base MATOC in establishing the price for this Sample Project. Provide the binding contract rates and hours below, if applicable, included in Job prices.
| Discipline |
| Binding Rate |
| Unit |
| Estimated Units |
Total
Project Manager hours
Superintendent hours
CQC Manager hours
Site Safety Health Officer hours
SECTION 00 10 00
CERTIFIED FINAL