About this file

This is a Price Breakout Schedule template for evaluating proposals on an IDIQ Design/Build, Design-Bid/Build Multiple Award Task Order Contract (MATOC) for construction services. The document serves as an evaluation tool only and will be removed upon contract award. Offerors must complete pricing for a sample project involving HVAC system design and construction at Caesar Creek Lake Visitor Center Interpretive Center, with two primary line items: (1) Design of the existing HVAC system, and (2) Construction including demolition of the existing system and installation of new equipment consisting of three ground-mounted packaged units, multi-zone split VVT systems with gas furnaces, single-zone VVT packaged units, electrical work for new VVT terminals with electric reheat, and a new fan on the existing roof curb. Offerors must demonstrate use of fully burdened binding rates from the Base MATOC and provide supporting documentation including binding contract rates and estimated hours for Project Manager, Superintendent, CQC Manager, and Site Safety Health Officer positions.

The underlying MATOC (Solicitation W912QR26RA008), issued by the Department of the Army Corps of Engineers Louisville District, is a HUBZone set-aside contract with a total combined not-to-exceed capacity of $95,000,000 for construction services supporting Operations and Maintenance for civil and military projects within the Great Lakes and Ohio River Division mission boundaries. Only firms registered in the SBA HUBZone program are eligible to submit offers. The contract is structured as Phase I (initial awards) and Phase II (competitive task orders for selected awardees), with Phase II requirements outlined in Amendment 0005 posted July 9, 2026. NAICS Code 236220 applies with a $45,000,000 size determination threshold.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26RA0080009 SF 30.pdf PDF
SECTION 01 02 10.00 06 and 01 11 05 Revised 08.31.2026.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080008 SF 30.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.docx DOCX document
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080007 SF 30.pdf PDF
Phase II SECTION 00 22 18 Revised.pdf PDF
W912QR26RA008-Amendment 0006.pdf PDF
SAMPLE PROJECT CLAUSES Revised.pdf PDF
00 10 00__Price Breakout Schedule.pdf PDF
Veterans Employment_.pdf PDF
Solicitation Amendment W912QR26RA0080005 SF 30.pdf PDF
DFARS 252.204-7025_.pdf PDF
PIEE Directions.pdf PDF
Solicitation Amendment W912QR26RA0080004 SF 30.pdf PDF
UAI 5152.236-9011_.pdf PDF
128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026.pdf PDF
SAMPLE PROJECT CLAUSES.pdf PDF
General Decision Number.pdf PDF
ProjNet Instructions.pdf PDF
Binding Rates 07.09.2026.docx DOCX document
Phase II SECTION 00 22 18_07.08.2026.pdf PDF
Solicitation Amendment W912QR26RA0080003 SF 30 (1).pdf PDF
W912QR26RA008-Amendment 0002.pdf PDF
W912QR26RA008-Amendment 0001.pdf PDF
W912QR26RA008 Specs 0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 10 00

PRICE BREAKOUT SCHEDULE

07/26

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Price Amount

BASE PROPOSAL

0001.Design: All work, materials, and labor required
to design the existing HVAC System at Caesar
Creek Lake Visitor Center Interpretive Center.
Job 1$
0002.Construction: All work, materials,
and labor required to demolish the existing HVAC
System at Caesar Creek Lake Visitor Center
Interpretive Center. The Contractor will install a new
HVAC system. The Contractor will provide three new
ground mounted packaged units (PU), install a multi-zone
(3 zones) split VVT system with gas furnace for the office,
install a single zone VVT packaged unit in the auditorium,
install a single zone VVT packaged unit for the east end
display areas (three gallery rooms), install a single zone
VVT split system with gas furnace for the central reception,
restrooms, and west end multipurpose room, install a new
fan on the existing roof curb to provide required air flow
for the existing restrooms and janitor closet, and install new
electrical panel in the auditorium closet to support the two
new PUs on this side of the building. Electrical work for new
VVT terminals with electric reheat, office PU, and mechanical
split system will be required.
Job 1$

Total Base Proposal $_________________

TOTAL PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. The sample project Price Breakout Schedule will be removed at the time of contract award, as this is only for evaluation purposes.

NOTE NO. 2. The sample project is representative of the type of work that will be ordered under this MATOC.

NOTE NO. 3. Offerors must insert a price on all blank numbered items of the Schedule.

Show that you have used the fully burdened binding rates from the Base MATOC in establishing the price for this Sample Project. Provide the binding contract rates and hours below, if applicable, included in Job prices.

Discipline
Binding Rate
Unit
Estimated Units

Total

Project Manager hours

Superintendent hours

CQC Manager hours

Site Safety Health Officer hours

SECTION 00 10 00

CERTIFIED FINAL

File details come from the government source that posted it. Updated .