About this file

This is Amendment 0005 to PHASE II Solicitation No. W912QR26RA008 for an IDIQ Design/Build Multiple Award Task Order Contract (MATOC) issued by the U.S. Army Corps of Engineers, Louisville District (W072 ENDIST LOUISVILLE). The solicitation seeks construction services for Operations and Maintenance (O&M) for civil and military projects within the Great Lakes and Ohio River Division Mission Boundaries.

The amendment extends the proposal due date from 28 May 2025 at 4:00 PM ET to Monday, 10 August 2026 at 2:00 PM Eastern Daylight Time (EDT) and changes the response submission location from 600 Dr Martin Luther King Jr Place to 220 W Main Street 3rd Floor, Louisville, Kentucky 40202-2230. The amendment also modifies the response due time from 11:00 AM to 2:00 PM and changes the time zone from E1 (UTC +5) to Eastern Daylight Time (UTC -4). Key updates include replacement of all plan sheets, specifications sections, and general conditions; incorporation of a Price Breakout Schedule and updated Wage Decision (WD) Number OH20260001, Revision 3; and complete replacement of procedures for submittal and evaluation of Phase II offers. The amendment revises FAR 52.211-10 regarding commencement, prosecution, and completion of work and adds multiple new contract documents while deleting previous versions. All other terms and conditions remain unchanged.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26RA0080009 SF 30.pdf PDF
SECTION 01 02 10.00 06 and 01 11 05 Revised 08.31.2026.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080008 SF 30.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.docx DOCX document
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080007 SF 30.pdf PDF
Phase II SECTION 00 22 18 Revised.pdf PDF
W912QR26RA008-Amendment 0006.pdf PDF
SAMPLE PROJECT CLAUSES Revised.pdf PDF
00 10 00__Price Breakout Schedule.pdf PDF
Veterans Employment_.pdf PDF
00 10 00__Price Breakout Schedule 07.09.2026 FINAL.docx DOCX document
DFARS 252.204-7025_.pdf PDF
PIEE Directions.pdf PDF
Solicitation Amendment W912QR26RA0080004 SF 30.pdf PDF
UAI 5152.236-9011_.pdf PDF
128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026.pdf PDF
SAMPLE PROJECT CLAUSES.pdf PDF
General Decision Number.pdf PDF
ProjNet Instructions.pdf PDF
Binding Rates 07.09.2026.docx DOCX document
Phase II SECTION 00 22 18_07.08.2026.pdf PDF
Solicitation Amendment W912QR26RA0080003 SF 30 (1).pdf PDF
W912QR26RA008-Amendment 0002.pdf PDF
W912QR26RA008-Amendment 0001.pdf PDF
W912QR26RA008 Specs 0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

PHASE II Solicitation No. Block 14 (Description of Amendment/Modification):

W912QR26RA006 for IDIQ Design/Build Multiple Award Task Order Contract (MATOC) to provide Construction Services for Operations and Maintenance (O&M) for Civil and Military Projects within the Great Lakes and Ohio River Division Mission Boundaries is hereby amended as follows:

A. The Price Breakout Schedule (PBS) has been added and incorporated into Section 00 10 00 -

SOLICITATION.

B. Section 00 21 00 - INSTRUCTIONS has been updated for the following:

C. Section 00 22 18 - PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE II has been replaced in its entirety.

D. Section 00 72 00 - GENERAL CONDITIONS have been updated as follows:

(1) FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) has been revised.

E. Section 00 73 00 - SUPPLEMENTARY CONDITIONS has been revised as follows:

(1) Wage Decision (WD) Number OH20260001, Revision Number 3 was published on 06/25/2026 and is hereby incorporated in its entirety.

F. All PLANS SHEETS have been replaced in their entirety.

G. All SPECIFICATIONS SECTIONS have been replaced in their entirety.

H. The proposal due date has been extended from 28 May 2025 at 4:00 PM ET to Monday 10 August 2026 at 2:00 PM Eastern Daylight Time (EDT) for offerors invited to participate in Phase II.

I. All other terms and conditions remain unchanged

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Time

11:00 AM 02:00 PM

Response Due E1 Time Zone (UTC +5) Eastern Daylight Time (UTC -4)

W912QR26RA0080005

Time Zone Response Due Date

23 Dec 2025 10 Aug 2026

Party to receive Solicitation

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600

DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 220

W MAIN STREET 3RD FLOOR

LOUISVILLE, KY 40202-2230

UNITED STATES

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 SPECIAL INST

RUCTIONS

Statement of Work 06 Oct 2025 Attach ment

No

0002 ProjNet Instructions_

Statement of Work 03 Oct 2025 Attach ment

No

0003 PIEE

Directions_

Statement of Work 03 Oct 2025 Attach ment

No

0004 REPS AND

CERTS

Statement of Work 16 Jul 2025 Attach ment

No

0005 UAI 5152.236-

Statement of Work 16 Jul 2025 Attach ment

No

0006 Section 00 22 16_Revised 12.15.2025_

Statement of Work 15 Dec

Attach ment

No

0007 Veterans Employment

Statement of Work 19 Aug

Attach ment

No

0008 DFARS

252.204-7025

DFARS 252.204-7025 24 Nov

Attach ment

No

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0001 ProjNet Instructions

Statement of Work 08 Jul 2026 Attach ment

No

0002 PIEE Directions Statement of Work 08 Jul 2026 Attach ment

No

0003 00 10 00__Price Breakout Schedule 07.09.2026

FINAL

Statement of Work 09 Jul 2026 Attach ment

No

0004 Binding Rates 07.09.2026

Statement of Work 09 Jul 2026 Attach ment

No

0005 Phase II

SECTION 00

22 18_07.

08.2026

Statement of Work 08 Jul 2026 Attach ment

No

0006 128609- Caesar Creek

HVAC

Replacement DB VOL 2 Pack age__1_JULY_

Statement of Work 08 Jul 2026 Attach ment

No

0007 SAMPLE

PROJECT

CLAUSES

Statement of Work 01 Jul 2026 Attach ment

No

0008 Veterans Employment_

Statement of Work 08 Jul 2026 Attach ment

No

0009 DFARS

252.204-7025_

DFARS 252.204-7025 08 Jul 2026 Attach ment

No

0010 UAI 5152.236-

9011_

Statement of Work 08 Jul 2026 Attach ment

No

0011 General Decision Number

Wage Determination 01 Jul 2026 Attach ment

No

The following contract documents were added:

00 10 00__Price Breakout Schedule 07.09.2026 FINAL 128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026 Binding Rates 07.09.2026

DFARS 252.204-7025_

General Decision Number PIEE Directions Phase II SECTION 00 22 18_07.08.2026 ProjNet Instructions

SAMPLE PROJECT CLAUSES

UAI 5152.236-9011_

Veterans Employment_

The following contract documents were deleted:

DFARS 252.204-7025

PIEE Directions_ ProjNet Instructions_

REPS AND CERTS

SPECIAL INSTRUCTIONS

Section 00 22 16_Revised 12.15.2025_

UAI 5152.236-9011

Veterans Employment

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FRO

M

TO

ProjNet Instructions non e

PIEE Directions non e

00 10 00__Price Breakout Schedule 07.09.2026 FINAL non e

Binding Rates 07.09.2026 non e

Phase II SECTION 00 22 18_07.08.2026 non e

128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ non e

Veterans Employment_ non e

DFARS 252.204-7025_ non e

UAI 5152.236-9011_ non e

General Decision Number non e

Miscellaneous text in this section has been deleted:

The attachments listed in this section are incorporated by reference and made part of this contract with the same force and effect as if included in full text.

IDCode: J
Page: 1
Pages: 6
AmendNo: 0005
EffDate: 09 JUL 2026
ReqNo:
ProjNo: HUBZONE MATOC
IssCode: W912QR
AdmCode:
IssuedBy: W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 220 W MAIN STREET 3RD FLOOR

LOUISVILLE, KY 40202-2230

UNITED STATES

JOEL HUBERMAN, EMAIL: JOEL.HUBERMAN@USACE.ARMY.MIL TELEPHONE: (502) 315-7409

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912QR26RA008
SolDate: 06 OCT 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: JOHN BUTTS
ContDate:
CODate: 09 JUL 2026