About this file

This is a Price Breakout Schedule template for a Design-Bid-Build (DBB) and Design-Build (D/B) Multiple Award Task Order Contract (MATOC) under solicitation W912QR26RA008, issued by the Department of the Army Corps of Engineers Louisville District. The schedule provides line items for both base proposal and optional work, with a specific example project focused on HVAC system design and construction at Caesar Creek Lake Visitor Center Interpretive Center in Cincinnati, Ohio.

The base proposal includes two line items: design services for the existing HVAC system and comprehensive construction services involving demolition of the existing HVAC system and installation of new equipment including three ground-mounted packaged rooftop units (RTUs) with propane heating, VAV systems, ductwork, carbon monoxide detectors, and associated electrical work. Optional line items (0003 and 0004) are available for additional construction and design work. The schedule is structured to accommodate offeror pricing at the job level, requires EEIC codes for Air Force projects, and includes notes that all pricing must be provided for all numbered items or the offer may be deemed unacceptable. The evaluation will follow a best-value trade-off process with a target ceiling of $1,000,000.00; however, the government cannot guarantee funds exceeding this ceiling. All modifications must be submitted on copies of the latest CLIN schedule, and option durations must be coordinated with program management and cannot extend beyond the established overall contract duration. This template is applicable to the larger MATOC, which carries a $95,000,000 combined not-to-exceed capacity and is set aside for HUBZone small businesses under NAICS code 236220.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26RA0080009 SF 30.pdf PDF
SECTION 01 02 10.00 06 and 01 11 05 Revised 08.31.2026.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080008 SF 30.pdf PDF
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080007 SF 30.pdf PDF
Phase II SECTION 00 22 18 Revised.pdf PDF
W912QR26RA008-Amendment 0006.pdf PDF
SAMPLE PROJECT CLAUSES Revised.pdf PDF
00 10 00__Price Breakout Schedule.pdf PDF
Veterans Employment_.pdf PDF
00 10 00__Price Breakout Schedule 07.09.2026 FINAL.docx DOCX document
Solicitation Amendment W912QR26RA0080005 SF 30.pdf PDF
DFARS 252.204-7025_.pdf PDF
PIEE Directions.pdf PDF
Solicitation Amendment W912QR26RA0080004 SF 30.pdf PDF
UAI 5152.236-9011_.pdf PDF
128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026.pdf PDF
SAMPLE PROJECT CLAUSES.pdf PDF
General Decision Number.pdf PDF
ProjNet Instructions.pdf PDF
Binding Rates 07.09.2026.docx DOCX document
Phase II SECTION 00 22 18_07.08.2026.pdf PDF
Solicitation Amendment W912QR26RA0080003 SF 30 (1).pdf PDF
W912QR26RA008-Amendment 0002.pdf PDF
W912QR26RA008-Amendment 0001.pdf PDF
W912QR26RA008 Specs 0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST FORK FLIP BUCKET ROCK REMOVAL [SOLICITATION NUMBER]

AND SLOPE STABILIZATION [DATE]

CINCINNATTI, OH

**SAFETY PAYS**

Amendment 0008*************************************************************** 00 10 00

PRICE BREAKOUT SCHEDULE

04/202213

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Price Amount

BASE PROPOSAL

0001.ConstructionDesign: All work, materials,
and labor required to design the existing HVAC
System at Caesar Creek Lake Visitor Center
Interpretive Center.
[ insert description]Job 1$
0002.Construction: All work, materials,
and labor required to demolish the existing HVAC
System at Caesar Creek Lake Visitor Center
Interpretive Center. The Contractor will install a new
HVAC system. Provide three new ground mounted
packaged rooftop units (RTUs) with propane heating.
(All units are anticipated to be less than 2000 cfm.)

One of the three RTUs will be a multi-zone (3 zones) VAV system for the offices. One of the three RTUs will be a single zone VAV packaged unit in the orientation.

One of the three RTUs will be a single zone VAV \ packaged unit for the east end display areas (three gallery rooms). Install a single zone VAV split system with propane heating for the central reception, restrooms, and west end multipurpose room. Install a new fan on the existing roof curb to provide required air flow for the existing restrooms and janitor closet. New ductwork will be hung from existing wood roof members. The contractor is responsible for verifying existing truss locations and panel point spacing. All ductwork exposed to public view shall be double wall round or flat oval.

The contractor will TAB/DALT all newly install HVAC systems. Install Carbon monoxide detectors and any necessary subpanel(s) for the required NFPA 72 notification through existing notification appliances.

Install new electrical panel in the projection room to support the two new RTUs on this side of the building.

Electrical work for new VAV terminals with electric reheat, office RTU, and mechanical split system will be required.

Job 1 $

[INCLUDE EEIC CODE FOR AF]

0002.Design: All work and labor required
to design [insert description]Job$
[INCLUDE EEIC CODE FOR AF]

Total Base Proposal $_________________

OPTIONS

0003.Construction: All work, materials,
and labor required to [insert description]Job$
[INCLUDE EEIC CODE FOR AF]
0004.Design: All work and labor required
to design [insert description]Job$
[INCLUDE EEIC CODE FOR AF]

Total Options $

TOTAL PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items [including options] of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid [and all Options] will be evaluated [for best value to the Government. The basis for award is the trade-off process. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes [by adding the total price for all options to] the total price for the basic requirement. [Evaluation of options will not obligate the Government to exercise the option(s).]][on price only.]

NOTE NO. 4. [Not used for D-B-B] The target ceiling for task order award is [$1,000,000.00]. The government cannot guarantee that funds exceeding this target ceiling can be made available for award. Offerors are under no obligation to approach this ceiling.

--END OF CLIN SCHEDULE—

*********************************************************************************Amendment 0008 Note to PE/A – Coordinate with PM, Construction PE, and contract specialist on duration (how long the option is good for) of options and include the duration as a note to the Price Breakout Schedule. Also, the duration can’t extend the established overall contract duration and has to be exercised prior to the expiration of the duration or the option becomes new scope.

AF only - EEIC Codes are obtained from the PM and/or BCE PM.

SECTION 00 10 00

CERTIFIED FINAL