00 10 00__Price Breakout Schedule.pdf
PDF 128 KB Posted
- Solicitation number
- W912QR26RA008
About this file
This is a Price Breakout Schedule (Section 00 10 00) for a federal construction contract, certified final as of April 2022 under Amendment 0006.
The solicitation requires offerors to provide pricing for HVAC system work at Caesar Creek Lake Visitor Center Interpretive Center. The contract contains two line items under the Base Proposal: (1) Line Item 0001 covers design services including all work, materials, and labor required to design the existing HVAC system, priced as one job; and (2) Line Item 0002 covers construction services including demolition of the existing HVAC system and installation of a new system comprising three ground-mounted packaged units, a multi-zone (3 zones) split VVT system with gas furnace for the office, single zone VVT packaged units for the orientation and east end display areas (three gallery rooms), a single zone VVT split system with gas furnace for central reception/restrooms/multipurpose room, a new fan on the existing roof curb for restrooms and janitor closet, a new electrical panel in the projection room, and associated electrical work for VVT terminals with electric reheat, office packaged unit, and mechanical split system, also priced as one job. Offerors must insert prices on all numbered line items; failure to do so may result in rejection. The offeror's Base Bid will be evaluated for best value to the Government. All proposal modifications must be submitted on copies of the latest CLIN schedule as published in the solicitation or amendments, with offerors stating revised prices for each item rather than indicating additions or deductions.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 10 00
CERTIFIED FINAL
Amendment 0006*************************************************************** 00 10 00
PRICE BREAKOUT SCHEDULE
04/2022
OFFEROR'S NAME: ___________________________________________
CONTRACT LINE ITEM SCHEDULE
Line Item No. Description Unit Price Amount
BASE PROPOSAL
0001. Design: All work, materials, and labor required to design the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center.
Job 1 $
0002. Construction: All work, materials, and labor required to demolish the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center. The Contractor will install a new HVAC system. The Contractor will provide three new ground mounted packaged units (PU), install a multi-zone (3 zones) split VVT system with gas furnace for the office, install a single zone VVT packaged unit in the orientation, install a single zone VVT packaged unit for the east end display areas (three gallery rooms), install a single zone VVT split system with gas furnace for the central reception, restrooms, and west end multipurpose room, install a new fan on the existing roof curb to provide required air flow for the existing restrooms and janitor closet, and install new electrical panel in the projection room to support the two new PUs on this side of the building. Electrical work for new VVT terminals with electric reheat, office PU, and mechanical split system will be required.
Job 1 $
Total Base Proposal $_________________
TOTAL PROPOSAL $
SECTION 00 10 00
CERTIFIED FINAL
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base Bid will be evaluated for best value to the Government.
--END OF CLIN SCHEDULE—