This is a Price Breakout Schedule (Section 00 10 00) for a federal construction contract, certified final as of April 2022 under Amendment 0006.

The solicitation requires offerors to provide pricing for HVAC system work at Caesar Creek Lake Visitor Center Interpretive Center. The contract contains two line items under the Base Proposal: (1) Line Item 0001 covers design services including all work, materials, and labor required to design the existing HVAC system, priced as one job; and (2) Line Item 0002 covers construction services including demolition of the existing HVAC system and installation of a new system comprising three ground-mounted packaged units, a multi-zone (3 zones) split VVT system with gas furnace for the office, single zone VVT packaged units for the orientation and east end display areas (three gallery rooms), a single zone VVT split system with gas furnace for central reception/restrooms/multipurpose room, a new fan on the existing roof curb for restrooms and janitor closet, a new electrical panel in the projection room, and associated electrical work for VVT terminals with electric reheat, office packaged unit, and mechanical split system, also priced as one job. Offerors must insert prices on all numbered line items; failure to do so may result in rejection. The offeror's Base Bid will be evaluated for best value to the Government. All proposal modifications must be submitted on copies of the latest CLIN schedule as published in the solicitation or amendments, with offerors stating revised prices for each item rather than indicating additions or deductions.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26RA0080009 SF 30.pdf PDF
SECTION 01 02 10.00 06 and 01 11 05 Revised 08.31.2026.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080008 SF 30.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.docx DOCX document
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080007 SF 30.pdf PDF
Phase II SECTION 00 22 18 Revised.pdf PDF
W912QR26RA008-Amendment 0006.pdf PDF
SAMPLE PROJECT CLAUSES Revised.pdf PDF
Veterans Employment_.pdf PDF
00 10 00__Price Breakout Schedule 07.09.2026 FINAL.docx DOCX document
Solicitation Amendment W912QR26RA0080005 SF 30.pdf PDF
DFARS 252.204-7025_.pdf PDF
PIEE Directions.pdf PDF
Solicitation Amendment W912QR26RA0080004 SF 30.pdf PDF
UAI 5152.236-9011_.pdf PDF
128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026.pdf PDF
SAMPLE PROJECT CLAUSES.pdf PDF
General Decision Number.pdf PDF
ProjNet Instructions.pdf PDF
Binding Rates 07.09.2026.docx DOCX document
Phase II SECTION 00 22 18_07.08.2026.pdf PDF
Solicitation Amendment W912QR26RA0080003 SF 30 (1).pdf PDF
W912QR26RA008-Amendment 0002.pdf PDF
W912QR26RA008-Amendment 0001.pdf PDF
W912QR26RA008 Specs 0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 10 00

CERTIFIED FINAL

Amendment 0006*************************************************************** 00 10 00

PRICE BREAKOUT SCHEDULE

04/2022

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Price Amount

BASE PROPOSAL

0001. Design: All work, materials, and labor required to design the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center.

Job 1 $

0002. Construction: All work, materials, and labor required to demolish the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center. The Contractor will install a new HVAC system. The Contractor will provide three new ground mounted packaged units (PU), install a multi-zone (3 zones) split VVT system with gas furnace for the office, install a single zone VVT packaged unit in the orientation, install a single zone VVT packaged unit for the east end display areas (three gallery rooms), install a single zone VVT split system with gas furnace for the central reception, restrooms, and west end multipurpose room, install a new fan on the existing roof curb to provide required air flow for the existing restrooms and janitor closet, and install new electrical panel in the projection room to support the two new PUs on this side of the building. Electrical work for new VVT terminals with electric reheat, office PU, and mechanical split system will be required.

Job 1 $

Total Base Proposal $_________________

TOTAL PROPOSAL $

SECTION 00 10 00

CERTIFIED FINAL

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid will be evaluated for best value to the Government.

--END OF CLIN SCHEDULE—

*********************************************************************************Amendment 0006

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

File details come from the government source that posted it. Updated .