About this file

This is a Price Breakout Schedule (Section 00 10 00) for a federal construction contract related to HVAC system work at Caesar Creek Lake Visitor Center Interpretive Center, dated April 2022 and issued under Amendment 0008.

The contract contains two line items under the Base Proposal. Line Item 0001 requires design of the existing HVAC system at the facility on a lump sum (Job) basis. Line Item 0002 requires construction services including demolition of the existing HVAC system and installation of a new system comprising three ground-mounted packaged rooftop units (RTUs) with propane heating (all under 2000 cfm), a multi-zone VAV system for offices, single-zone VAV units for orientation and gallery display areas, a split system for central reception and multipurpose room, and installation of a new roof fan for existing restrooms and janitor closet. Additional requirements include new ductwork hung from existing roof members, TAB/DALT commissioning of all new HVAC systems, carbon monoxide detection with NFPA 72 notification integration, electrical panel installation in the projection room, and electrical work for VAV terminals with electric reheat. Both line items are priced on a lump sum (Job) basis. The schedule requires offerors to insert prices for all numbered items and notes that the Base Bid will be evaluated on best value to the Government. Offerors must submit all proposal modifications on copies of the latest CLIN schedule with revised prices stated for each item.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR26RA0080009 SF 30.pdf PDF
SECTION 01 02 10.00 06 and 01 11 05 Revised 08.31.2026.pdf PDF
Solicitation Amendment W912QR26RA0080008 SF 30.pdf PDF
00 10 00__Price Breakout Schedule_08.26.2026.docx DOCX document
Caesar Creek HVAC Replacement DB VOL 2 Package__Revised_08.26.2026.pdf PDF
Solicitation Amendment W912QR26RA0080007 SF 30.pdf PDF
Phase II SECTION 00 22 18 Revised.pdf PDF
W912QR26RA008-Amendment 0006.pdf PDF
SAMPLE PROJECT CLAUSES Revised.pdf PDF
00 10 00__Price Breakout Schedule.pdf PDF
Veterans Employment_.pdf PDF
00 10 00__Price Breakout Schedule 07.09.2026 FINAL.docx DOCX document
Solicitation Amendment W912QR26RA0080005 SF 30.pdf PDF
DFARS 252.204-7025_.pdf PDF
PIEE Directions.pdf PDF
Solicitation Amendment W912QR26RA0080004 SF 30.pdf PDF
UAI 5152.236-9011_.pdf PDF
128609- Caesar Creek HVAC Replacement DB VOL 2 Package__1_JULY_ 2026.pdf PDF
SAMPLE PROJECT CLAUSES.pdf PDF
General Decision Number.pdf PDF
ProjNet Instructions.pdf PDF
Binding Rates 07.09.2026.docx DOCX document
Phase II SECTION 00 22 18_07.08.2026.pdf PDF
Solicitation Amendment W912QR26RA0080003 SF 30 (1).pdf PDF
W912QR26RA008-Amendment 0002.pdf PDF
W912QR26RA008-Amendment 0001.pdf PDF
W912QR26RA008 Specs 0000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 10 00

CERTIFIED FINAL

Amendment 0008*************************************************************** 00 10 00

PRICE BREAKOUT SCHEDULE

04/2022

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Price Amount

BASE PROPOSAL

0001. Design: All work, materials, and labor required to design the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center.

Job 1 $

0002. Construction: All work, materials, and labor required to demolish the existing HVAC System at Caesar Creek Lake Visitor Center Interpretive Center. The Contractor will install a new HVAC system. Provide three new ground mounted packaged rooftop units (RTUs) with propane heating.

(All units are anticipated to be less than 2000 cfm.)

One of the three RTUs will be a multi-zone (3 zones) VAV system for the offices. One of the three RTUs will be a single zone VAV packaged unit in the orientation.

One of the three RTUs will be a single zone VAV \ packaged unit for the east end display areas (three gallery rooms). Install a single zone VAV split system with propane heating for the central reception, restrooms, and west end multipurpose room. Install a new fan on the existing roof curb to provide required air flow for the existing restrooms and janitor closet. New ductwork will be hung from existing wood roof members. The contractor is responsible for verifying existing truss locations and panel point spacing. All ductwork exposed to public view shall be double wall round or flat oval.

The contractor will TAB/DALT all newly install HVAC systems. Install Carbon monoxide detectors and any necessary subpanel(s) for the required NFPA 72 notification through existing notification appliances.

Install new electrical panel in the projection room to support the two new RTUs on this side of the building.

Electrical work for new VAV terminals with electric reheat, office RTU, and mechanical split system will be required.

Job 1 $

SECTION 00 10 00

CERTIFIED FINAL

Total Base Proposal $_________________

TOTAL PROPOSAL $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid will be evaluated for best value to the Government.

--END OF CLIN SCHEDULE—

*********************************************************************************Amendment 0008

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE