This is a Bid Schedule Excel template for a Battery Energy Storage System (BESS) Installation project under solicitation W912PF25QA092. The document is structured with four worksheets covering summary, prime contractor breakdown, subcontractor breakdown, and profit analysis. The project involves installing BESS units in Longare, Italy, with a contract value estimated between $500,000 and $1,000,000.

The pricing template provides detailed cost breakdown categories including foundations, construction, superstructure, electrical systems, site preparations, and utilities. Key requirements include breaking down unit costs with specific descriptions, avoiding generic "Lot" or "Lump Sum" measurements, and maintaining detailed documentation for potential subcontractor quote requests. The document includes a profit analysis methodology that weights factors such as project risk, work difficulty, job size, performance period, contractor investment, government assistance, and subcontracting levels to determine a fair profit percentage. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command, with the most recent amendment (Amendment 0004) changing the proposal due date to 22 September 2025 at 1100.

View the file

Other files

File Type Posted
Solicitation Amendment W912PF25QA0920005 SF 30.pdf PDF
Solicitation Amendment - W912PF25QA0920005.pdf PDF
B08-RFP_Atch1.8_SOW_REC - BESS at Longare Proponent Signed_20250725.pdf PDF
SS_44_PLC.pdf PDF
B08-RFP__Atch3_QA LOG_MASTER_20250912.pdf PDF
B08-RFP_Atch4_BidSchedule_CLIN0004_20250904.xlsx XLSX spreadsheet
B08-RFP_Atch4_BidSchedule_CLIN0003_20250904.xlsx XLSX spreadsheet
Solicitation Amendment W912PF25QA0920004 SF 30.pdf PDF
T601-Smart Grid_As Built.pdf PDF
Solicitation Amendment - W912PF25QA0920004.pdf PDF
B08-RFP_Atch4_BidSchedule_CLIN0001_20250904.xlsx XLSX spreadsheet
SS_44_RTU_MULTIFILARE.pdf PDF
A02-SOW_R1_20250911.pdf PDF
Solicitation Amendment 3 - W912PF25QA0920003.pdf PDF
Solicitation Amendment 3 -W912PF25QA0920003 SF 30.pdf PDF
Amendment 2 - W912PF25QA0920002.pdf PDF
Amendment 2 - W912PF25QA0920002 SF 30.pdf PDF
MIOTTO BASE GENERATORS_PV.pdf PDF
Design BESS at ESS_43.pdf PDF
MC N019-24 LO PAESAGGISTICA.pdf PDF
Amendment1 W912PF25QA0920001_Summary.pdf PDF
Design BESS at ESS_38.pdf PDF
Amendment1 W912PF25QA0920001 SF 30.pdf PDF
MC N019-24 LO LANDSCAPE.pdf PDF
Design BESS at ESS_42.pdf PDF
Design BESS at ESS_34.pdf PDF
B08-RFP_Atch4_BidSchedule_20250804.xlsx XLSX spreadsheet
B08-RFP_Atch1_SOW_20250725.pdf PDF
B08-RFP_Atch3_QA LOG_20250804.xlsx XLSX spreadsheet
B08-RFP_Atch5_Anti-Mafia Certification_20250804.pdf PDF
B08-RFP_Atch2_SOW_GENERAL_20230127.pdf PDF
Solicitation - W912PF25QA092.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Introduction Pricing Submission Form

Template
Form Revised 05 December 2024
I: Color Key
The forms contain color-coded cells.
Green indicates cells that should be filled in by the preparer.
Yellow indicates cells containing formulas that should not be altered.
II: Form Content
This form contains four (4) worksheets. Use the bottom tabs to navigate among the worksheets.
Tab 1: Summary Tab. Headers, Subcontractor, Overhead, Profit, and FY Conversion Rate
Tab 2: Prime Breakdown. Costs of work performed by the Prime contractor
Tab 3: Subcontractor Breakdown. Costs of work performed by the subcontractor(s)*
Tab 4: Profit Analysis. Example only, required only if requested
III: Pricing Justification (as applicable. e.g., modifications, sole source awards)
1. Subcontractor Competition
The Government reserves the right to request three (3) quotes for each work subcontracted.
Quotes will need to be made available immediately upon request.
2. Local Cost Books (examples)
Regione del Veneto (https://www.regione.veneto.it/)
Camera di Commercio Vicenza (https://www.vi.camcom.it/)
IV: Unit of Measure (UOM)
It is highly recommended that unit of issues such as "Lot" and "Lump Sum (LS)" NOT be used. Preparer should break down each material with an exact description (the small tools and consumables rate will account for any materials that typically would be burdensome to delineate .e.g. caulk, nails, tape, etc).

1. Summary Summary

Project Name:Battery Energy Storage System (BESS) Installation, LongareProposal Rev #
Contract/Task Order/RFP No.W912PF25QA092Date:
Proposed Change No. (Mod)N/A
Contractor:
Description:CLIN 0002 Battery Energy Storage System (BESS) and Installation (MI-00002-3J)
1PRIME CONTRACTOR'S WORK (from attached cost breakdown form)
a.Direct Labor€ - 0
b.Direct Material€ - 0
c.Direct Equipment€ - 0
d.Field Oversight Labor€ - 0
Prime Total€ - 0
2SUBCONTRACTORS (from attached cost breakdown form)
a.Direct Labor€ - 0
b.Direct Material€ - 0
c.Direct Equipment€ - 0
Subcontractor Total€ - 0
SUMMARY
3SUBTOTAL PRIME & SUBCONTRACTORSubtotal 1 & 2€ - 0
4DESIGN (i.e. DB)% of line 3€ - 0
5SUBTOTALSubtotal 1 - 4€ - 0
6OVERHEAD% of line 5€ - 0
7SUBTOTAL (without profit)Subtotal 1 - 6€ - 0
8PROFIT% of line 7€ - 0
9TOTAL COSTSubtotal 1 - 8€ - 0
FY EXCHANGE RATE0.9249
GRAND TOTAL USD$ - 0
SUBCONTRACTOR(S)
1
2
3
4
5
6
7

SIGNATURE

Prepared By:
Name:
Position/Title:
Organization:
Telephone No.:
Signature:

&"Arial,Regular"&8Revised June 23, 2017 &"Arial,Regular"&8Page 1 of 4 &"Arial,Regular"&8CPD Form 01 26 00-c

&"Arial,Regular"&8Revised 06/23/2017 &"Arial,Regular"&8Page 1 of 4 &"Arial,Regular"&8CPD Form 01 26 00-c

&"Arial,Regular"&8Page 1 of 5

2. Prime Breakdown Prime Cost Breakdown

Project Name:Battery Energy Storage System (BESS) Installation, LongareProposal Rev #0
Contract/Task Order/TOPR No.W912PF25QA092Date:31-Dec-99
Proposed Change No. (Mod)N/A
Prime Contractor:0
Summary of Prime Contractor's Direct Costs
(without field overhead)LaborMaterialEquipmentTotal
Subtotal Direct Costs (w/o OH)€ - 0€ - 0€ - 0€ - 0
Field Overhead LaborUOMQtyUnit €% Project RelatedTotal
Project ManagerDays€ - 0
Quality Control Manager (QCM)Days€ - 0
Site Safety & Health Officer (SSHO)Days€ - 0
Site SuperintendentDays€ - 0
Subtotal Field Overhead Labor Costs€ - 0
#DescriptionUOMQtyLaborMaterialEquipment
Unit €TotalUnit €TotalUnit €TotalTotal Cost
A10FOUNDATIONS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total A10 Costs€ - 0€ - 0€ - 0€ - 0
A20BASEMENT CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total A20 Costs€ - 0€ - 0€ - 0€ - 0
B10SUPERSTRUCTURE
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B10 Costs€ - 0€ - 0€ - 0€ - 0
B20EXTERIOR ENCLOSURE
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B20 Costs€ - 0€ - 0€ - 0€ - 0
B30ROOFING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B30 Costs€ - 0€ - 0€ - 0€ - 0
C10INTERIOR CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C10 Costs€ - 0€ - 0€ - 0€ - 0
C20STAIRS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C20 Costs€ - 0€ - 0€ - 0€ - 0
C30INTERIOR FINISHES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C30 Costs€ - 0€ - 0€ - 0€ - 0
D10CONVEYING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D10 Costs€ - 0€ - 0€ - 0€ - 0
D20PLUMBING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D20 Costs€ - 0€ - 0€ - 0€ - 0
D30HVAC
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D30 Costs€ - 0€ - 0€ - 0€ - 0
D40FIRE PROTECTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D40 Costs€ - 0€ - 0€ - 0€ - 0
D50ELECTRICAL
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D50 Costs€ - 0€ - 0€ - 0€ - 0
E10EQUIPMENT
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total E10 Costs€ - 0€ - 0€ - 0€ - 0
E20FURNISHINGS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total E20 Costs€ - 0€ - 0€ - 0€ - 0
F10SPECIAL CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total F10 Costs€ - 0€ - 0€ - 0€ - 0
F20SELECT BUILDING DEMOLITION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total F20 Costs€ - 0€ - 0€ - 0€ - 0
G10SITE PREPARATIONS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G10 Costs€ - 0€ - 0€ - 0€ - 0
G20SITE IMPROVEMENTS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G20 Costs€ - 0€ - 0€ - 0€ - 0
G30SITE CIVIL/MECHANICAL UTILITIES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G30 Costs€ - 0€ - 0€ - 0€ - 0
G40SITE ELECTRICAL UTILITIES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G40 Costs€ - 0€ - 0€ - 0€ - 0

&"Arial,Regular"&8Page 2 of 5

3. Subcontractor Breakdown Subcontractor Cost Breakdown

Project Name:Battery Energy Storage System (BESS) Installation, LongareProposal Rev #0
Contract/TOPR No.W912PF25QA092Date:31-Dec-99
Proposed Change No. (Mod)N/A
Prime Contractor:0
Summary of Subcontractor CostsLaborMaterialEquipmentTotal
Subcontractor Costs€ - 0€ - 0€ - 0€ - 0
#DescriptionUOMQtyLaborMaterialEquipment
Unit €TotalUnit €TotalUnit €TotalTotal Cost
A10FOUNDATIONS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total A10 Costs€ - 0€ - 0€ - 0€ - 0
A20BASEMENT CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total A20 Costs€ - 0€ - 0€ - 0€ - 0
B10SUPERSTRUCTURE
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B10 Costs€ - 0€ - 0€ - 0€ - 0
B20EXTERIOR ENCLOSURE
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B20 Costs€ - 0€ - 0€ - 0€ - 0
B30ROOFING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total B30 Costs€ - 0€ - 0€ - 0€ - 0
C10INTERIOR CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C10 Costs€ - 0€ - 0€ - 0€ - 0
C20STAIRS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C20 Costs€ - 0€ - 0€ - 0€ - 0
C30INTERIOR FINISHES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total C30 Costs€ - 0€ - 0€ - 0€ - 0
D10CONVEYING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D10 Costs€ - 0€ - 0€ - 0€ - 0
D20PLUMBING
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D20 Costs€ - 0€ - 0€ - 0€ - 0
D30HVAC
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D30 Costs€ - 0€ - 0€ - 0€ - 0
D40FIRE PROTECTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D40 Costs€ - 0€ - 0€ - 0€ - 0
D50ELECTRICAL
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total D50 Costs€ - 0€ - 0€ - 0€ - 0
E10EQUIPMENT
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total E10 Costs€ - 0€ - 0€ - 0€ - 0
E20FURNISHINGS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total E20 Costs€ - 0€ - 0€ - 0€ - 0
F10SPECIAL CONSTRUCTION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total F10 Costs€ - 0€ - 0€ - 0€ - 0
F20SELECT BUILDING DEMOLITION
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total F20 Costs€ - 0€ - 0€ - 0€ - 0
G10SITE PREPARATIONS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G10 Costs€ - 0€ - 0€ - 0€ - 0
G20SITE IMPROVEMENTS
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G20 Costs€ - 0€ - 0€ - 0€ - 0
G30SITE CIVIL/MECHANICAL UTILITIES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G30 Costs€ - 0€ - 0€ - 0€ - 0
G40SITE ELECTRICAL UTILITIES
1€ - 0€ - 0€ - 0€ - 0
2€ - 0€ - 0€ - 0€ - 0
3€ - 0€ - 0€ - 0€ - 0
4€ - 0€ - 0€ - 0€ - 0
5€ - 0€ - 0€ - 0€ - 0
6€ - 0€ - 0€ - 0€ - 0
7€ - 0€ - 0€ - 0€ - 0
8€ - 0€ - 0€ - 0€ - 0
9€ - 0€ - 0€ - 0€ - 0
10€ - 0€ - 0€ - 0€ - 0
Total G40 Costs€ - 0€ - 0€ - 0€ - 0

&"Arial,Regular"&8Page 2 of 5

4. Profit Analysis Profit

Profit Objective for Construction Contractors
Alternate Structured Approach
FactorRateWeightValue
aDegree of risk200
bRelative difficulty of work150
cSize of job150
dPeriod of performance150
eContractor's investment50
fAssistance by Government50
gSubcontracting250
Total1000.00%
Based on the circumstances of the procurement action, each of the above factors shall be weighted from 0.03 to 0.12, as indicated below. “Value” shall be obtained by multiplying the rate by the weight. The value column, when totaled, indicates the fair and reasonable profit percentage under the circumstances of the particular procurement.
aDegree of risk. Where the work involves no risk or the degree of risk is very small, the weighting should be 0.03; as the degree of risk increases, the weighting should be increased up to a maximum of 0.12. Lump sum items shall generally have a higher weight than unit price items. Consider the nature of subcontractors, amount and type of labor included in costs and whether the negotiation is before or after performance of the work. Modifications, settled before the fact, have a much greater risk than those settled after the fact. A weight of 0.03 is appropriate for after the fact equitable adjustments and/or settlements.

b Relative difficulty of work. If the work is difficult and complex, the weight should be 0.12 and should be proportionately reduced to 0.03 on the simplest of jobs. This factor is tied, to some extent, to the degree of risk. Other things to consider are the nature of the work, by whom it is to be done (i.e., subcontractors, consultants), etc.

c Size of job. Work estimated up to $100,000 shall be weighted at 0.12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from 0.12 to 0.05. Work from $5,000,000 to $10,000,000 shall be weighted at 0.04. Work in excess of $10,000,000 shall be weighted at 0.03. It should be noted that control of fixed expenses generally improves with increased job magnitude.

d Period of performance. Work not to exceed 1 month is to be weighted at 0.03. Durations between 1 and 24 months are to be proportionately weighted between 0.03 and 0.12. Work in excess of 24 months is to be weighted at 0.12.

e Contractor’s investment. To be weighted from 0.03 to 0.12 on the basis of below average, average and above average. Consider the amount of subcontracting, Government-furnished property or data, such as surveys, method of making progress payments, and any mobilization payment items.

f Assistance by government. To be weighted from 0.12 to 0.03 on the basis of average to above average. Consider use of Government-owned property, equipment and facilities, expediting assistance, etc.

g Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80 percent or more of the work is to be subcontracted, use 0.03. The weighting should be increased proportionately to 0.12 where all the work is performed by the contractor’s own forces.

File details come from the government source that posted it. Updated .