B08-RFP_Atch4_BidSchedule_CLIN0001_20250904.xlsx
XLSX spreadsheet 98 KB Posted
- Attached to
- Battery Energy Storage Systems (BESS)
- Solicitation number
- W912PF25QA092
About this file
This is a Bid Schedule Excel template for a Battery Energy Storage System (BESS) Installation project solicitation (Contract No. W912PF25QA092) issued by the Department of the Army Materiel Command Army Contracting Command. The template is designed for contractors to provide detailed cost breakdowns across multiple worksheets, including a summary tab, prime contractor breakdown, subcontractor breakdown, and profit analysis.
The pricing submission form requires granular cost details organized by construction categories such as foundations, superstructure, electrical utilities, and site preparations. The document emphasizes precise unit of measure descriptions and provides guidance on subcontractor competition, with the government reserving the right to request three quotes for subcontracted work. The profit analysis section includes a structured approach for calculating profit rates based on factors like degree of risk, job difficulty, project size, performance period, contractor investment, government assistance, and subcontracting levels. The project is for Battery Energy Storage System units to be installed in Longare, Italy, with an estimated construction magnitude between $500,000 and $1,000,000.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction Pricing Submission Form
| Template |
| Form Revised 05 December 2024 |
| I: Color Key | |
| The forms contain color-coded cells. | |
| Green indicates cells that should be filled in by the preparer. | |
| Yellow indicates cells containing formulas that should not be altered. |
| II: Form Content |
| This form contains four (4) worksheets. Use the bottom tabs to navigate among the worksheets. |
| Tab 1: Summary Tab. Headers, Subcontractor, Overhead, Profit, and FY Conversion Rate |
| Tab 2: Prime Breakdown. Costs of work performed by the Prime contractor |
| Tab 3: Subcontractor Breakdown. Costs of work performed by the subcontractor(s)* |
| Tab 4: Profit Analysis. Example only, required only if requested |
| III: Pricing Justification (as applicable. e.g., modifications, sole source awards) |
| 1. Subcontractor Competition |
| The Government reserves the right to request three (3) quotes for each work subcontracted. |
| Quotes will need to be made available immediately upon request. |
| 2. Local Cost Books (examples) |
| Regione del Veneto (https://www.regione.veneto.it/) |
| Camera di Commercio Vicenza (https://www.vi.camcom.it/) |
| IV: Unit of Measure (UOM) |
| It is highly recommended that unit of issues such as "Lot" and "Lump Sum (LS)" NOT be used. Preparer should break down each material with an exact description (the small tools and consumables rate will account for any materials that typically would be burdensome to delineate .e.g. caulk, nails, tape, etc). |
1. Summary Summary
| Project Name: | Battery Energy Storage System (BESS) Installation, Longare | Proposal Rev # |
| Contract/Task Order/RFP No. | W912PF25QA092 | Date: |
| Proposed Change No. (Mod) | N/A | |
| Contractor: | ||
| Description: | CLIN 0001 Battery Energy Storage System (BESS) and Installation (MI-00001-3J) |
| 1 | PRIME CONTRACTOR'S WORK (from attached cost breakdown form) | |||
| a. | Direct Labor | € - 0 | ||
| b. | Direct Material | € - 0 | ||
| c. | Direct Equipment | € - 0 | ||
| d. | Field Oversight Labor | € - 0 | ||
| Prime Total | € - 0 |
| 2 | SUBCONTRACTORS (from attached cost breakdown form) | |||
| a. | Direct Labor | € - 0 | ||
| b. | Direct Material | € - 0 | ||
| c. | Direct Equipment | € - 0 | ||
| Subcontractor Total | € - 0 |
| SUMMARY | |||||
| 3 | SUBTOTAL PRIME & SUBCONTRACTOR | Subtotal 1 & 2 | € - 0 | ||
| 4 | DESIGN (i.e. DB) | % of line 3 | € - 0 | ||
| 5 | SUBTOTAL | Subtotal 1 - 4 | € - 0 | ||
| 6 | OVERHEAD | % of line 5 | € - 0 | ||
| 7 | SUBTOTAL (without profit) | Subtotal 1 - 6 | € - 0 | ||
| 8 | PROFIT | % of line 7 | € - 0 | ||
| 9 | TOTAL COST | Subtotal 1 - 8 | € - 0 | ||
| FY EXCHANGE RATE | 0.9249 | ||||
| GRAND TOTAL USD | $ - 0 |
| SUBCONTRACTOR(S) | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 |
SIGNATURE
| Prepared By: | |
| Name: | |
| Position/Title: | |
| Organization: | |
| Telephone No.: | |
| Signature: |
&"Arial,Regular"&8Revised June 23, 2017 &"Arial,Regular"&8Page 1 of 4 &"Arial,Regular"&8CPD Form 01 26 00-c
&"Arial,Regular"&8Revised 06/23/2017 &"Arial,Regular"&8Page 1 of 4 &"Arial,Regular"&8CPD Form 01 26 00-c
&"Arial,Regular"&8Page 1 of 5
2. Prime Breakdown Prime Cost Breakdown
| Project Name: | Battery Energy Storage System (BESS) Installation, Longare | Proposal Rev # | 0 |
| Contract/Task Order/TOPR No. | W912PF25QA092 | Date: | 31-Dec-99 |
| Proposed Change No. (Mod) | N/A | ||
| Prime Contractor: | 0 |
| Summary of Prime Contractor's Direct Costs | ||||||
| (without field overhead) | Labor | Material | Equipment | Total | ||
| Subtotal Direct Costs (w/o OH) | € - 0 | € - 0 | € - 0 | € - 0 |
| Field Overhead Labor | UOM | Qty | Unit € | % Project Related | Total |
| Project Manager | Days | € - 0 | |||
| Quality Control Manager (QCM) | Days | € - 0 | |||
| Site Safety & Health Officer (SSHO) | Days | € - 0 | |||
| Site Superintendent | Days | € - 0 | |||
| Subtotal Field Overhead Labor Costs | € - 0 |
| # | Description | UOM | Qty | Labor | Material | Equipment | ||||
| Unit € | Total | Unit € | Total | Unit € | Total | Total Cost | ||||
| A10 | FOUNDATIONS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total A10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| A20 | BASEMENT CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total A20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B10 | SUPERSTRUCTURE | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B20 | EXTERIOR ENCLOSURE | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B30 | ROOFING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C10 | INTERIOR CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C20 | STAIRS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C30 | INTERIOR FINISHES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D10 | CONVEYING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D20 | PLUMBING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D30 | HVAC | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D40 | FIRE PROTECTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D40 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D50 | ELECTRICAL | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D50 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| E10 | EQUIPMENT | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total E10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| E20 | FURNISHINGS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total E20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| F10 | SPECIAL CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total F10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| F20 | SELECT BUILDING DEMOLITION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total F20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G10 | SITE PREPARATIONS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G20 | SITE IMPROVEMENTS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G40 | SITE ELECTRICAL UTILITIES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G40 Costs | € - 0 | € - 0 | € - 0 | € - 0 |
&"Arial,Regular"&8Page 2 of 5
3. Subcontractor Breakdown Subcontractor Cost Breakdown
| Project Name: | Battery Energy Storage System (BESS) Installation, Longare | Proposal Rev # | 0 |
| Contract/TOPR No. | W912PF25QA092 | Date: | 31-Dec-99 |
| Proposed Change No. (Mod) | N/A | ||
| Prime Contractor: | 0 |
| Summary of Subcontractor Costs | Labor | Material | Equipment | Total |
| Subcontractor Costs | € - 0 | € - 0 | € - 0 | € - 0 |
| # | Description | UOM | Qty | Labor | Material | Equipment | ||||
| Unit € | Total | Unit € | Total | Unit € | Total | Total Cost | ||||
| A10 | FOUNDATIONS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total A10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| A20 | BASEMENT CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total A20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B10 | SUPERSTRUCTURE | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B20 | EXTERIOR ENCLOSURE | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| B30 | ROOFING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total B30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C10 | INTERIOR CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C20 | STAIRS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| C30 | INTERIOR FINISHES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total C30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D10 | CONVEYING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D20 | PLUMBING | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D30 | HVAC | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D40 | FIRE PROTECTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D40 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| D50 | ELECTRICAL | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total D50 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| E10 | EQUIPMENT | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total E10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| E20 | FURNISHINGS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total E20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| F10 | SPECIAL CONSTRUCTION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total F10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| F20 | SELECT BUILDING DEMOLITION | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total F20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G10 | SITE PREPARATIONS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G10 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G20 | SITE IMPROVEMENTS | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G20 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G30 Costs | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| G40 | SITE ELECTRICAL UTILITIES | |||||||||
| 1 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 2 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 3 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 4 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 5 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 6 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 7 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 8 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 9 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| 10 | € - 0 | € - 0 | € - 0 | € - 0 | ||||||
| Total G40 Costs | € - 0 | € - 0 | € - 0 | € - 0 |
&"Arial,Regular"&8Page 2 of 5
4. Profit Analysis Profit
| Profit Objective for Construction Contractors | |||||
| Alternate Structured Approach | |||||
| Factor | Rate | Weight | Value | ||
| a | Degree of risk | 20 | 0 | ||
| b | Relative difficulty of work | 15 | 0 | ||
| c | Size of job | 15 | 0 | ||
| d | Period of performance | 15 | 0 | ||
| e | Contractor's investment | 5 | 0 | ||
| f | Assistance by Government | 5 | 0 | ||
| g | Subcontracting | 25 | 0 | ||
| Total | 100 | 0.00 | % | ||
| Based on the circumstances of the procurement action, each of the above factors shall be weighted from 0.03 to 0.12, as indicated below. “Value” shall be obtained by multiplying the rate by the weight. The value column, when totaled, indicates the fair and reasonable profit percentage under the circumstances of the particular procurement. | |||||
| a | Degree of risk. Where the work involves no risk or the degree of risk is very small, the weighting should be 0.03; as the degree of risk increases, the weighting should be increased up to a maximum of 0.12. Lump sum items shall generally have a higher weight than unit price items. Consider the nature of subcontractors, amount and type of labor included in costs and whether the negotiation is before or after performance of the work. Modifications, settled before the fact, have a much greater risk than those settled after the fact. A weight of 0.03 is appropriate for after the fact equitable adjustments and/or settlements. |
b Relative difficulty of work. If the work is difficult and complex, the weight should be 0.12 and should be proportionately reduced to 0.03 on the simplest of jobs. This factor is tied, to some extent, to the degree of risk. Other things to consider are the nature of the work, by whom it is to be done (i.e., subcontractors, consultants), etc.
c Size of job. Work estimated up to $100,000 shall be weighted at 0.12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from 0.12 to 0.05. Work from $5,000,000 to $10,000,000 shall be weighted at 0.04. Work in excess of $10,000,000 shall be weighted at 0.03. It should be noted that control of fixed expenses generally improves with increased job magnitude.
d Period of performance. Work not to exceed 1 month is to be weighted at 0.03. Durations between 1 and 24 months are to be proportionately weighted between 0.03 and 0.12. Work in excess of 24 months is to be weighted at 0.12.
e Contractor’s investment. To be weighted from 0.03 to 0.12 on the basis of below average, average and above average. Consider the amount of subcontracting, Government-furnished property or data, such as surveys, method of making progress payments, and any mobilization payment items.
f Assistance by government. To be weighted from 0.12 to 0.03 on the basis of average to above average. Consider use of Government-owned property, equipment and facilities, expediting assistance, etc.
g Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80 percent or more of the work is to be subcontracted, use 0.03. The weighting should be increased proportionately to 0.12 where all the work is performed by the contractor’s own forces.
File details come from the government source that posted it. Updated .