B08-RFP_Atch4_BidSchedule_20250804.xlsx

XLSX spreadsheet 80 KB Posted

Attached to
Battery Energy Storage Systems (BESS)
Solicitation number
W912PF25QA092
Issued by

About this file

This document is a Bid Schedule (Excel spreadsheet) for a Battery Energy Storage Systems (BESS) installation project located in Longare, Italy. The bid schedule is structured with multiple Contract Line Items (CLINs) for four separate BESS installations, including a primary Basic Contract (CLIN 0001) and a UXO (Unexploded Ordnance) Remediation contract (CLIN 0002) for each installation site. The document breaks down costs into granular categories including civil work, mechanical work, electrical work, design efforts, commissioning, and on-site personnel costs.

The bid schedule is associated with a Department of the Army Materiel Command Army Contracting Command solicitation (W912PF25QA092) for purchasing and installing Battery Energy Storage Systems. The pricing template is detailed in Euros and uses a 1:1 exchange rate with US dollars for Fiscal Year 2025. While the actual cost values are set to zero in this template, the document provides a comprehensive framework for pricing various components of the BESS installation, including site preparation, demolition, electrical work, equipment installation, and specialized tasks like UXO remediation and micro grid controller development.

View the file

Other files

File Type Posted
Solicitation Amendment W912PF25QA0920005 SF 30.pdf PDF
Solicitation Amendment - W912PF25QA0920005.pdf PDF
B08-RFP_Atch1.8_SOW_REC - BESS at Longare Proponent Signed_20250725.pdf PDF
Solicitation Amendment - W912PF25QA0920004.pdf PDF
A02-SOW_R1_20250911.pdf PDF
B08-RFP__Atch3_QA LOG_MASTER_20250912.pdf PDF
B08-RFP_Atch4_BidSchedule_CLIN0004_20250904.xlsx XLSX spreadsheet
B08-RFP_Atch4_BidSchedule_CLIN0003_20250904.xlsx XLSX spreadsheet
B08-RFP_Atch4_BidSchedule_CLIN0002_20250904.xlsx XLSX spreadsheet
SS_44_PLC.pdf PDF
Solicitation Amendment W912PF25QA0920004 SF 30.pdf PDF
B08-RFP_Atch4_BidSchedule_CLIN0001_20250904.xlsx XLSX spreadsheet
SS_44_RTU_MULTIFILARE.pdf PDF
T601-Smart Grid_As Built.pdf PDF
Solicitation Amendment 3 - W912PF25QA0920003.pdf PDF
Solicitation Amendment 3 -W912PF25QA0920003 SF 30.pdf PDF
Amendment 2 - W912PF25QA0920002.pdf PDF
Amendment 2 - W912PF25QA0920002 SF 30.pdf PDF
MC N019-24 LO LANDSCAPE.pdf PDF
Design BESS at ESS_43.pdf PDF
Amendment1 W912PF25QA0920001 SF 30.pdf PDF
Design BESS at ESS_34.pdf PDF
MIOTTO BASE GENERATORS_PV.pdf PDF
MC N019-24 LO PAESAGGISTICA.pdf PDF
Design BESS at ESS_42.pdf PDF
Design BESS at ESS_38.pdf PDF
Amendment1 W912PF25QA0920001_Summary.pdf PDF
B08-RFP_Atch3_QA LOG_20250804.xlsx XLSX spreadsheet
B08-RFP_Atch1_SOW_20250725.pdf PDF
Solicitation - W912PF25QA092.pdf PDF
B08-RFP_Atch5_Anti-Mafia Certification_20250804.pdf PDF
B08-RFP_Atch2_SOW_GENERAL_20230127.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro

BID

PREPARED BY: REVIEWED BY:

Date: Date:

Signature: Signature:

INDIVIDUAL GRAND TOTAL

CLIN 0001 Basic Contract MI-00001-3J Install BESS's Longare€ - 0$ - 0
CLIN 0001 GENERAL GRAND TOTAL€ - 0
CLIN 0001 Basic Contract MI-00002-3J Install BESS's Longare€ - 0$ - 0$ - 0

CLIN 0001 Basic Contract MI-00003-3J Install BESS's Longare € - 0 $ - 0

CLIN 0001 Basic Contract MI-00004-3J Install BESS's Longare € - 0 $ - 0

CLIN 0002 UXO Remediaton MI-00001-3J Install BESS's Longare € - 0 $ - 0

CLIN 0002 UXO Remediaton MI-00002-3J Install BESS's Longare€ - 0$ - 0
CLIN 0002 GENERAL GRAND TOTAL€ - 0
CLIN 0002 UXO Remediaton MI-00003-3J Install BESS's Longare€ - 0$ - 0$ - 0

CLIN 0002 UXO Remediaton MI-00004-3J Install BESS's Longare € - 0 $ - 0

CLIN 0001 Basic Contract Install BESS's Longare General Grand Total
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
1Total civil work - Totale lavoro civile€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3Total electrical work - Totale lavoro elettrico€ 0.00€ - 0€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4Design efforts%0.0%0.0%€ 0.00€ 0.00€ 0.00
5Effort for Commissioning ReportLS€ 0.00€ 0.00
6Design efforts for ConstraintsLS€ 0.00€ 0.00
7On Site Personnel Costs€ 0.00€ - 0
TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
Overhead€ - 0
$ - 0
Profit€ - 0
$ - 0
GRAND TOTAL€ - 0
$ - 0

FY25 RATE $1.0000 = € 1.0000

CLIN 0001 Basic Contract MI-00001-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
8Total civil work - Totale lavoro civile€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
10Total electrical work - Totale lavoro elettrico€ 0.00€ - 0€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
11Design efforts%0.0%0.0%€ 0.00€ 0.00€ 0.00
12Effort for Commissioning ReportLS€ 0.00€ 0.00
13Design efforts for ConstraintsLS€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
FY25 RATE$1.0000=€ 1.0000
ItemLaborDuration (*)Daily CostProject Related Cost
Calendar Days€%
On Site Personnel Costs
14Project Manager0.00€ 0.000%€ 0.00
15Quality Control Manager0.00€ 0.000%€ 0.00
16Site Safety Health Officer0.00€ 0.000%€ 0.00
17Site Superintendent0.00€ 0.000%€ 0.00
TOTAL WORK€ 0.00
$0.00
Overhead€ - 0
$ - 0
Profit€ - 0
$ - 0
GRAND TOTAL€ - 0
$ - 0
CLIN 0002 UXO Remediaton MI-00001-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
18Total UXO remediation00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
19Design efforts%0%0%€ 0.00€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00
RATE$1.0000=€ 1.0000
Overhead€ 0.00€ 0.00€ 0.00
Profit€ 0.00€ 0.00€ 0.00
GRAND TOTAL€ 0.00
$0.00
8CIVIL WORK-LAVORI CIVILI
General Conditions
Preparation site (M)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
A10Foundations
F20Selective Building Demolition (A)LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

Concrete foundations (A) EA 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

B2010Exterior Closure - Exterior Walls
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
REI concrete retaining walls (F)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Fences (B)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Conduits (G)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total civil work - Totale lavoro civile0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

9 MECHANICAL WORK-LAVORI MECCANICI

D20Plumbing
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total mechanical work - Totale lavoro meccanico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

10 ELECTRICAL WORK-LAVORI ELETTRICI

D40 Fire Protections Systems

D4010Fire Alarm & Detection Systems
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Installation (Q)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D50Electrical0.00€ 0.00€ 0.00
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5020Lighting & Branch Wiring0.00€ 0.00€ 0.00
Power connections (H)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Data Connection Cables (I)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5030Communication & Security0.00€ 0.00€ 0.00
D503006Micro Grid Controller Development Software (D)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D503006DDC Energy Metering (P)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
E1090Other Equipment0.00€ 0.00€ 0.00
EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Supply and Installation of Battery Energy Storage Systems (K)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D501004 PANELBOARDSInstallation new BESS Circuit Breakers (C)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of switches to MGC (E)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSModification to LV El. Panel substations (J)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSRent Generators (R)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of El. Panels to MGC (L)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020BESS Lighting (O)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020Service Outlets (N)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total electrical work - Totale lavoro elettrico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
18CLIN 0002 UXO Remediaton MI-00001-3J Install BESS's Longare
Civil work - Uxo remediation
Demolition
Additional cost to the controlled excavation for UXO remediation.Item includes also all package for 5^ Reparto Infrastrutture approval and all final documentation to be submitted as per SOW.LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Additional costs to the controlled excavation for removal and disposal (or transport in other site) of normal non contaminated soil originated by UXO excavation which could not be reused on site.In case of contaminated founding, the disposal and removal shall be priced based on type of contamination and it shall be considered as modification to the contractmc0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
CLIN 0001 Basic Contract MI-00002-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
20Total civil work - Totale lavoro civile€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
21Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
22Total electrical work - Totale lavoro elettrico€ 0.00€ - 0€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
23Design efforts%0.0%0.0%€ 0.00€ 0.00€ 0.00
24Effort for Commissioning ReportLS€ 0.00€ 0.00
25Design efforts for ConstraintsLS€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
FY25 RATE$1.0000=€ 1.0000
ItemLaborDuration (*)Daily CostProject Related Cost
Calendar Days€%
On Site Personnel Costs
26Project Manager0.00€ 0.000%€ 0.00
27Quality Control Manager0.00€ 0.000%€ 0.00
28Site Safety Health Officer0.00€ 0.000%€ 0.00
29Site Superintendent0.00€ 0.000%€ 0.00
TOTAL WORK€ 0.00
$0.00
Overhead€ - 0
$ - 0
Profit€ - 0
$ - 0
GRAND TOTAL€ - 0
$0.00
CLIN 0002 UXO Remediaton MI-00002-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
30Total UXO remediation00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
31Design efforts%0%0%€ 0.00€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00
RATE$1.0000=€ 1.0000
Overhead€ 0.00€ 0.00€ 0.00
Profit€ 0.00€ 0.00€ 0.00
GRAND TOTAL€ 0.00
$0.00
20CIVIL WORK-LAVORI CIVILI
General Conditions
Preparation site (M)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
A10Foundations0.00
F20Selective Building Demolition (A)LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00
Concrete foundations (A)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00
B2010Exterior Closure - Exterior Walls0.00
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
REI concrete retaining walls (F)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00
Fences (B)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Conduits (G)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total civil work - Totale lavoro civile0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

21 MECHANICAL WORK-LAVORI MECCANICI

D20Plumbing
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total mechanical work - Totale lavoro meccanico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

22 ELECTRICAL WORK-LAVORI ELETTRICI

D40 Fire Protections Systems

D4010Fire Alarm & Detection Systems
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Installation (Q)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00
D50Electrical0.00€ 0.00
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00
D5020Lighting & Branch Wiring0.00€ 0.00
Power connections (H)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Data Connection Cables (I)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00
D5030Communication & Security0.00€ 0.00
D503006Micro Grid Controller Development Software (D)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D503006DDC Energy Metering (P)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00
E1090Other Equipment0.00€ 0.00
EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Supply and Installation of Battery Energy Storage Systems (K)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00
D501004 PANELBOARDSInstallation new BESS Circuit Breakers (C)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of switches to MGC (E)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSModification to LV El. Panel substations (J)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSRent Generators (R)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of El. Panels to MGC (L)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020BESS Lighting (O)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020Service Outlets (N)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total electrical work - Totale lavoro elettrico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

30 CLIN 0002 UXO Remediaton MI-00002-3J Install BESS's Longare

Civil work - Uxo remediation
Demolition
Additional cost to the controlled excavation for UXO remediation.Item includes also all package for 5^ Reparto Infrastrutture approval and all final documentation to be submitted as per SOW.LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Additional costs to the controlled excavation for removal and disposal (or transport in other site) of normal non contaminated soil originated by UXO excavation which could not be reused on site.In case of contaminated founding, the disposal and removal shall be priced based on type of contamination and it shall be considered as modification to the contractmc0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
CLIN 0001 Basic Contract MI-00003-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
32Total civil work - Totale lavoro civile€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
33Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
34Total electrical work - Totale lavoro elettrico€ 0.00€ - 0€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
35Design efforts%0.0%0.0%€ 0.00€ 0.00
36Effort for Commissioning ReportLS€ 0.00€ 0.00
37Design efforts for ConstraintsLS€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
FY25 RATE$1.0000=€ 1.0000
ItemLaborDuration (*)Daily CostProject Related Cost
Calendar Days€%
On Site Personnel Costs
38Project Manager0.00€ 0.000%€ 0.00
39Quality Control Manager0.00€ 0.000%€ 0.00
40Site Safety Health Officer0.00€ 0.000%€ 0.00
41Site Superintendent0.00€ 0.000%€ 0.00
TOTAL WORK€ 0.00
$0.00
Overhead€ - 0
$ - 0
Profit€ - 0
$ - 0
GRAND TOTAL€ - 0
$0.00
CLIN 0002 UXO Remediaton MI-00003-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
42Total UXO remediation00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
43Design efforts%0%0%€ 0.00€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00
RATE$1.0000=€ 1.0000
Overhead€ 0.00€ 0.00€ 0.00
Profit€ 0.00€ 0.00€ 0.00
GRAND TOTAL€ 0.00
$0.00
32CIVIL WORK-LAVORI CIVILI
General Conditions
Preparation site (M)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
A10Foundations0.00€ 0.00€ 0.00
F20Selective Building Demolition (A)LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
Concrete foundations (A)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
B2010Exterior Closure - Exterior Walls0.00€ 0.00€ 0.00
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
REI concrete retaining walls (F)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
Fences (B)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Conduits (G)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total civil work - Totale lavoro civile0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

33 MECHANICAL WORK-LAVORI MECCANICI

D20Plumbing
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total mechanical work - Totale lavoro meccanico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

34 ELECTRICAL WORK-LAVORI ELETTRICI

D40 Fire Protections Systems

D4010Fire Alarm & Detection Systems
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Installation (Q)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D50Electrical0.00€ 0.00€ 0.00
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5020Lighting & Branch Wiring0.00€ 0.00€ 0.00
Power connections (H)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Data Connection Cables (I)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5030Communication & Security0.00€ 0.00€ 0.00
D503006Micro Grid Controller Development Software (D)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D503006DDC Energy Metering (P)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
E1090Other Equipment0.00€ 0.00€ 0.00
EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Supply and Installation of Battery Energy Storage Systems (K)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D501004 PANELBOARDSInstallation new BESS Circuit Breakers (C)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of switches to MGC (E)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSModification to LV El. Panel substations (J)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSRent Generators (R)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of El. Panels to MGC (L)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020BESS Lighting (O)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020Service Outlets (N)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total electrical work - Totale lavoro elettrico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

42 CLIN 0002 UXO Remediaton MI-00003-3J Install BESS's Longare

Civil work - Uxo remediation
Demolition
Additional cost to the controlled excavation for UXO remediation.Item includes also all package for 5^ Reparto Infrastrutture approval and all final documentation to be submitted as per SOW.LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Additional costs to the controlled excavation for removal and disposal (or transport in other site) of normal non contaminated soil originated by UXO excavation which could not be reused on site.In case of contaminated founding, the disposal and removal shall be priced based on type of contamination and it shall be considered as modification to the contractmc0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
CLIN 0001 Basic Contract MI-00004-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
44Total civil work - Totale lavoro civile€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
45Total mechanical work - Totale lavoro meccanico€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
46Total electrical work - Totale lavoro elettrico€ 0.00€ - 0€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
47Design efforts%0.0%0.0%€ 0.00€ 0.00
48Effort for Commissioning ReportLS€ 0.00€ 0.00
49Design efforts for ConstraintsLS€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00
$0.00$0.00
FY25 RATE$1.0000=€ 1.0000
ItemLaborDuration (*)Daily CostProject Related Cost
Calendar Days€%
On Site Personnel Costs
50Project Manager0.00€ 0.000%€ 0.00
51Quality Control Manager0.00€ 0.000%€ 0.00
52Site Safety Health Officer0.00€ 0.000%€ 0.00
53Site Superintendent0.00€ 0.000%€ 0.00
TOTAL WORK€ 0.00
$0.00
Overhead€ - 0
$ - 0
Profit€ - 0
$ - 0
GRAND TOTAL€ - 0
$0.00
CLIN 0002 UXO Remediaton MI-00004-3J Install BESS's Longare
Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
54Total UXO remediation00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
55Design efforts%0%0%€ 0.00€ 0.00€ 0.00
TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00
RATE$1.0000=€ 1.0000
Overhead€ 0.00€ 0.00€ 0.00
Profit€ 0.00€ 0.00€ 0.00
GRAND TOTAL€ 0.00
$0.00
44CIVIL WORK-LAVORI CIVILI
General Conditions
Preparation site (M)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
A10Foundations0.00€ 0.00€ 0.00
F20Selective Building Demolition (A)LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
Concrete foundations (A)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
B2010Exterior Closure - Exterior Walls0.00€ 0.00€ 0.00
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
REI concrete retaining walls (F)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
Fences (B)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Conduits (G)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total civil work - Totale lavoro civile0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

45 MECHANICAL WORK-LAVORI MECCANICI

D20Plumbing
DemolitionLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total mechanical work - Totale lavoro meccanico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

46 ELECTRICAL WORK-LAVORI ELETTRICI

D40 Fire Protections Systems

D4010Fire Alarm & Detection Systems
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Installation (Q)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D50Electrical0.00€ 0.00€ 0.00
DemolitionEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationEA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5020Lighting & Branch Wiring0.00€ 0.00€ 0.00
Power connections (H)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Data Connection Cables (I)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D5030Communication & Security0.00€ 0.00€ 0.00
D503006Micro Grid Controller Development Software (D)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D503006DDC Energy Metering (P)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
E1090Other Equipment0.00€ 0.00€ 0.00
EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Supply and Installation of Battery Energy Storage Systems (K)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
0.00€ 0.00€ 0.00
D501004 PANELBOARDSInstallation new BESS Circuit Breakers (C)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of switches to MGC (E)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSModification to LV El. Panel substations (J)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSRent Generators (R)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D501004 PANELBOARDSAdjustment of El. Panels to MGC (L)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020BESS Lighting (O)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
D5020Service Outlets (N)EA0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total electrical work - Totale lavoro elettrico0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

54 CLIN 0002 UXO Remediaton MI-00004-3J Install BESS's Longare

Civil work - Uxo remediation
Demolition
Additional cost to the controlled excavation for UXO remediation.Item includes also all package for 5^ Reparto Infrastrutture approval and all final documentation to be submitted as per SOW.LS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Additional costs to the controlled excavation for removal and disposal (or transport in other site) of normal non contaminated soil originated by UXO excavation which could not be reused on site.In case of contaminated founding, the disposal and removal shall be priced based on type of contamination and it shall be considered as modification to the contractmc0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
InstallationLS0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
Total0.000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00

Page &P of &N