This document is a Standard Form 30 (SF-30) Amendment to Solicitation for the Pajaro FRM Project Reach 6, issued by the U.S. Army Corps of Engineers San Francisco District. Amendment 0003 extends the bid due date from August 8, 2025, to August 20, 2025, with bid opening at 2:00 PM PST. Key changes include posting responses to Requests for Information (RFIs), revising specifications and plans, removing references to specific clauses, and deleting the DFARS clause on Wide Area WorkFlow Payment Instructions.

The solicitation covers a flood risk management project in Santa Cruz County, California, involving 2.6 miles of levees with approximately 111,600 cubic yards of fill and 1,500 linear feet of floodwalls along the Corralitos Creek. The project is located in the lower Pajaro River watershed, with levees featuring crest elevations from 2 to 8 feet, a 20-foot minimum crest width, and 3H:1V side slopes. The estimated cost range is between $25-$100 million, and the procurement will be conducted under NAICS Code 237990 with a size standard of $45 million.

View the file

Other files

File Type Posted
Bid Abstract SF 1419 Pajaro Reach 6.pdf PDF
Solicitation Amendment W912P725BA012 0006.pdf PDF
Solicitation Amendment 5 W912P725BA0120005 SF 30.pdf PDF
Amendment 5 -C-13.pdf PDF
Amendment 5- Revised Specification Section 31 63 29.pdf PDF
RFI Set 3 8.15.2025.pdf PDF
RFIs Set 2 W912P725BA012.pdf PDF
31 41 16.pdf PDF
Amendment4 C Sheets 2 of 2.pdf PDF
Amendment 4 C Sheets 1 of 2.pdf PDF
01 50 00 (Revision 2 Entire Spec Section).pdf PDF
TREE SURVEY DATA.pdf PDF
Solicitation Amendment 0004 W912P725BA012 SF 30 FINAL.pdf PDF
01 50 00 (Revision 1 Page Removal of Field Office).pdf PDF
RFIs Posted 7.31.2025.pdf PDF
01 20 00.pdf PDF
32 31 13.54.pdf PDF
Pajaro Reach6-Amendment3.pdf PDF
Amendment 2_No Work Zone.pdf PDF
Solicitation Amendment W912P725BA0120002 SF 30 7.22.2025.pdf PDF
2023_A3Geo_Phase 2 Geotechnical Investigation.pdf PDF
2022_A3Geo_Phase 1 Geotechnical Investigation.pdf PDF
Pajaro Existing Geotech Data DRAFT 033122.pdf PDF
Pajaro Reach 6 - CONTRACTOR SITE WALK ATTENDANCE.pdf PDF
Pajaro Reach 6 Conflict Items 7.16.2025.pdf PDF
Amendment 1_ W912P725BA0120001 SF 30.pdf PDF
Pajaro FRM Reach 6_Specifications.pdf PDF
W912P7BA012 Pajaro IFB FINAL 7.3.2025.pdf PDF
Pajaro FRM-Reach 6-100percent-AppendixH-Improvement Plans (Signed).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION 00 10 00

PRICING SCHEDULE

PAJARO FRM PROJECT REACH 6

Contract Line Item No.

(CLIN)

Description of Supplies and Services *Estimated

Quantity Unit

United Price

Amount

Remove and Relocate Remaining Pipes, and Install Internal Drainage Structures and Culvert Penetrations

1 Job $ $ nces, Construct Reach 6 Levees, including Inspection Trenches, Embankment, Side Channels, Chain Link Meshes, Fe RSP and Vegetation Erosion Protections

1 Job $ $

Construct Reach 6 Floodwalls, Foundations, Concrete and Sheet Piles

1 Job $ $

Total Price (Items 0001 through 0003) $

Notes:

1. To be considered responsive, prices must be submitted on all individual items within Pricing Schedule.

Failure to do so may be cause for rejection of bids.

Contract Line 2.

Item Nos. (CLIN) 0001 - 0003 0002 shall be considered as a Lump Sum.

3. BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award Sealed Bidding Constructions.

4. The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

End of Document

Price

Job $

JobJob $$

Job

Total Price (Items 0001 through 000Total Price (Items 0001 through 00033))

To be considered responsive, prices must be submitted on all individual items within Pricing Schedule.To be considered responsive, prices must be submitted on all individual items within Pricing Schedule.

BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214

The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work inThe Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out l3ct9lc9 Cross-Out

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is listed in the Block 14 (Description of Amendment/Modification):

summary of changes below.

*The bid due date will be extended to August 20, 2025 at 1:00 PM PST. The bid opening will be August 20, 2025 at 2:00 PM PST.

*Posting the responses to RFIs.

*Posting the revised specifications and plans.

*The reference to 52.219-9 Alt 1 in 52.252-3 and 52.252-4 has been removed.

*The DFARS clause 252.232-7006 Wide Area WorkFlow Payment Instructions has been removed.

*The bid schedule has been revised.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Section 00 21 00 - Instructions

The following clauses were modified:

52.252-3Alterations in Solicitation.Apr 1984 hereby reads as follows:

Alterations in Solicitation (Apr 1984)

Portions of this solicitation are altered as follows:

52.219-28 - Postaward Small Business Program Rerepresentation. (Alternate I)

52.219-1- Small Business Program Representations. (Alternate I)

52.204-7 -System for Award Management. (Alternate I)

252.204-7007 - Alternate A, Annual Representations and Certifications.

(End of clause)

W912P725BA0120003

• The bid due date has been changed from August 8, 2025 at 1:00 p.m. to August 20, 2025 at 1:00 p.m. PST

• The bid opening date has been changed from August 8, 2025 at 2:00 p.m. PST to August 20, 2025 at 2:00 p.m. PST

Section 00 72 00 - General Conditions

The following clauses were modified:

52.252-4Alterations in Contract.Apr 1984 hereby reads as follows:

Alterations in Contract (Apr 1984)

Portions of this contract are altered as follows:

52.219-28 - Postaward Small Business Program Rerepresentation. (Alternate I) 52.219-1- Small Business Program Representations. (Alternate I) 52.204-7 -System for Award Management. (Alternate I) 252.204-7007 - Alternate A, Annual Representations and Certifications

(End of clause)

Section 00 73 00 - Supplementary Conditions

The following clauses were deleted:

DFARS Clauses Incorporated by Full Text 252.232-7006Wide Area WorkFlow Payment Instructions. (Jan 2023)

W912P725BA0120003

IDCode: J
Page: 1
Pages: 4
AmendNo: 0003
EffDate: 31 JULY 2025
ReqNo:
ProjNo: NA
IssCode: W912P7
AdmCode:
IssuedBy: W075 ENDIST SAN FRAN

KO CONTRACTING DIVISION, 450 GOLDEN GATE AVENUE

SAN FRANCISCO, CA 94102-3406

UNITED STATES

LOGAN CHAMPLIN, EMAIL: LOGAN.CHAMPLIN@USACE.ARMY.MIL TELEPHONE: 415-503-6891

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912P725BA012
SolDate: 03 JUL 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is listed in the summary of changes below.
ContNameTitle:
CoNameTitle:
ContDate:
CODate: