Solicitation Amendment W912P725BA0120002 SF 30 7.22.2025.pdf

PDF 4 MB Posted

Attached to
Pajaro River Reach 6
Solicitation number
W912P725BA012
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Pajaro River Reach 6 flood risk management project. Amendment 0002 adds geotechnical reports, Schedules C and D for construction contractor experience data, and a plan sheet indicating a temporary no work zone. The amendment is associated with a U.S. Army Corps of Engineers solicitation (W912P725BA012) for constructing 2.6 miles of levees and floodwalls along Corralitos Creek in Watsonville, California, involving approximately 111,600 compacted cubic yards of fill and 1,500 linear feet of 6-9 foot high floodwalls. The project is estimated to cost between $25-$100 million, with bids due on August 8, 2025, at 12:00 PM PDT, and a performance period from September 1, 2025, to February 28, 2026.

View the file

Other files

File Type Posted
Bid Abstract SF 1419 Pajaro Reach 6.pdf PDF
Solicitation Amendment W912P725BA012 0006.pdf PDF
RFI Set 3 8.15.2025.pdf PDF
Solicitation Amendment 5 W912P725BA0120005 SF 30.pdf PDF
Amendment 5 -C-13.pdf PDF
Amendment 5- Revised Specification Section 31 63 29.pdf PDF
RFIs Set 2 W912P725BA012.pdf PDF
Amendment4 C Sheets 2 of 2.pdf PDF
TREE SURVEY DATA.pdf PDF
01 50 00 (Revision 1 Page Removal of Field Office).pdf PDF
Solicitation Amendment 0004 W912P725BA012 SF 30 FINAL.pdf PDF
01 50 00 (Revision 2 Entire Spec Section).pdf PDF
Amendment 4 C Sheets 1 of 2.pdf PDF
31 41 16.pdf PDF
01 20 00.pdf PDF
32 31 13.54.pdf PDF
RFIs Posted 7.31.2025.pdf PDF
Solicitation Amendment W912P725BA0120003 SF 30.pdf PDF
Pajaro Reach6-Amendment3.pdf PDF
Amendment 2_No Work Zone.pdf PDF
2022_A3Geo_Phase 1 Geotechnical Investigation.pdf PDF
Pajaro Existing Geotech Data DRAFT 033122.pdf PDF
2023_A3Geo_Phase 2 Geotechnical Investigation.pdf PDF
Pajaro Reach 6 - CONTRACTOR SITE WALK ATTENDANCE.pdf PDF
Pajaro Reach 6 Conflict Items 7.16.2025.pdf PDF
Amendment 1_ W912P725BA0120001 SF 30.pdf PDF
Pajaro FRM-Reach 6-100percent-AppendixH-Improvement Plans (Signed).pdf PDF
Pajaro FRM Reach 6_Specifications.pdf PDF
W912P7BA012 Pajaro IFB FINAL 7.3.2025.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

PreAward Survey Attachment 2

SCHEDULE C

CONSTRUCTION CONTRACTOR EXPERIENCE DATA

CONSTRUCTION AND/OR TECHNICAL EOUIPMENT: (List total equipment and Facilities owned for performing the work and present status as to whether or not it is committed to existing contracts.)

YEARS OF

PRESENT

QUANTITY DESCRIPTION CONDITION SERVICE STATUS

PreAward Survey Attachment 2

SCHEDULE D

CONSTRUCTION CONTRACTOR EXPERIENCE DATA

TO BE COMPLETED IF PROPOSED MILITARY CONSTRUCTION CONTRACT EXCEEDS $1,OOO,OOO.

A. Each contract awarded within the preceding three-month period exceeding $1,OOO,OOO in value with brief description of the contract:

B. Each contract awarded within the preceding three-year period not already physically completed and exceeding $5,000,000 in value with brief description of the contract:

IDCode: J
Page: 1
Pages: 1
AmendNo: 0002
EffDate: 22 JUL 2025
ReqNo:
ProjNo: NA
IssCode: W912P7
AdmCode:
IssuedBy: W075 ENDIST SAN FRAN

KO CONTRACTING DIVISION, 450 GOLDEN GATE AVENUE

SAN FRANCISCO, CA 94102-3406

UNITED STATES

LOGAN CHAMPLIN, EMAIL: LOGAN.CHAMPLIN@USACE.ARMY.MIL TELEPHONE: 415-503-6891

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912P725BA012
SolDate: 03 JUL 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE THE GEOTECHNICAL REPORTS, ADD THE PLAN SHEET THAT INDICATES THE TEMPORARY NO WORK ZONE, AND ADD SCHEDULE C AND D TO THE SOLICITATION.
ContNameTitle:
CoNameTitle:
ContDate:
CODate: