This document is an Appendix A listing conflict items for the Pajaro Reach 6 project, detailing specific site relocation and demolition activities. The table includes seven key issues with precise geographic coordinates, including building demolitions, well relocations, electrical service line changes, and tenant relocation. Resolution dates are scheduled between August 15 and September 30, 2025, with most activities concentrated around demolishing existing structures and relocating infrastructure to prepare for the levee and floodwall construction project.

Specific conflict items include demolishing the La Chilanguita Building and a barn, relocating PG&E electrical service lines, constructing new wells to replace existing ones (Wells 2-5), and relocating a tenant. The locations are situated along the Pajaro River in Santa Cruz County, with activities occurring at specific station markers ranging from STA 0+50 to STA 65+00. Each item has a planned resolution date and brief description of the planned action, such as constructing new wells and then cutting and filling the old well locations.

View the file

Other files

File Type Posted
Bid Abstract SF 1419 Pajaro Reach 6.pdf PDF
Solicitation Amendment W912P725BA012 0006.pdf PDF
RFI Set 3 8.15.2025.pdf PDF
Solicitation Amendment 5 W912P725BA0120005 SF 30.pdf PDF
Amendment 5 -C-13.pdf PDF
Amendment 5- Revised Specification Section 31 63 29.pdf PDF
RFIs Set 2 W912P725BA012.pdf PDF
Amendment4 C Sheets 2 of 2.pdf PDF
TREE SURVEY DATA.pdf PDF
01 50 00 (Revision 1 Page Removal of Field Office).pdf PDF
Solicitation Amendment 0004 W912P725BA012 SF 30 FINAL.pdf PDF
01 50 00 (Revision 2 Entire Spec Section).pdf PDF
Amendment 4 C Sheets 1 of 2.pdf PDF
31 41 16.pdf PDF
01 20 00.pdf PDF
32 31 13.54.pdf PDF
RFIs Posted 7.31.2025.pdf PDF
Solicitation Amendment W912P725BA0120003 SF 30.pdf PDF
Pajaro Reach6-Amendment3.pdf PDF
Solicitation Amendment W912P725BA0120002 SF 30 7.22.2025.pdf PDF
Amendment 2_No Work Zone.pdf PDF
2022_A3Geo_Phase 1 Geotechnical Investigation.pdf PDF
Pajaro Existing Geotech Data DRAFT 033122.pdf PDF
2023_A3Geo_Phase 2 Geotechnical Investigation.pdf PDF
Pajaro Reach 6 - CONTRACTOR SITE WALK ATTENDANCE.pdf PDF
Amendment 1_ W912P725BA0120001 SF 30.pdf PDF
Pajaro FRM-Reach 6-100percent-AppendixH-Improvement Plans (Signed).pdf PDF
Pajaro FRM Reach 6_Specifications.pdf PDF
W912P7BA012 Pajaro IFB FINAL 7.3.2025.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pajaro Reach 6 -Conflict ItemsPajaro Reach 6 -Conflict ItemsReach 6 Finish Line

Issue Location Resolution Date Discussions on Status and Resolution

La Chilanguita Building needs to be demolished

3656'07"N | 12144'37"W LB Approximate STA 0+50

08/31/25 Building to be demolished in August

Well 2 Electrical Service Line Relocation

3656'08"N | 12145'46"W LB Approximate STA 65+00

08/31/25 The PG&E service line pole relocation is currently scheduled for late August 2025.

Well 3 Relocation 3656'07"N | 12145'35"W RB Approximate STA 54+00

09/30/25 New well is being constructed. Once the new well is operational, the old well will be cut and filled.

Well 4 Relocation 3656'08"N | 12145'16"W LB Approximate STA 37+00

09/30/25 New well is being constructed. Once the new well is operational, the old well will be cut and filled.

Well 5 Relocation 3656'12"N | 12145'03"W LB Approximate STA 25+00

09/30/25 New well is being constructed. Once the new well is operational, the old well will be cut and filled.

Tenant Relocation 3656'06"N | 12144'47"W LB Approximate STA 10+00

08/15/25 Tenant to be relocated by August 15.

Barn Demolition 3656'06"N | 12144'47"W LB Approximate STA 10+00

08/31/25 Building to be demolished in August

APPENDIX A