W912LR26BA002 OF1419 - Abstract of Bids - KO Signed 20260630.pdf

PDF 296 KB Posted

Attached to
Invitation for Bid: Army National Guard Military Construction, Engineering/Housing Maintenance Shop, Camp Santiago, Salinas, PR
Solicitation number
W912LR26BA0002
Issued by

About this file

This is an Abstract of Offers - Construction (Optional Form 1419) documenting the bid opening for a military construction project.

Project Overview and Solicitation Details:

Solicitation Number W912LR26BA0002 was issued on 12 May 2026 and opened on 25 June 2026 at 2:00 pm. The project is titled "PN 431850 Military Construction of Engineering Housing and Maintenance Shops (EHMS), Directorate of Public Works (DPW), at Camp Santiago Joint Training Center, Salinas, PR 00751." The issuing office is W7PA USPFO ACTIVITY PR ARNG KO FOR PRARNG, USAG BLDG 540, BONRIQUEENER ST, FORT BUCHANAN PR 00934. The government estimate is based on a Reasonable Contract (Including Profit) methodology. Amanda Bogue, Contracting Officer, certified the abstract on 30 June 2026, with 4 amendments acknowledged.

Offers Received:

Nine total offers were received for eight contract items. Offer No. 1 was submitted by Three O, LLC with a bid bond of 20% and total estimated amount of $24,702,780.00. Offer No. 2 was submitted by MD Design Consultants, LLC with a bid bond of 20% and total estimated amount of $18,732,168.00. Additional offers were received from Barlovento LLC ($27,990,343.00), NV Services, LLC ($23,060,800.00), Advantix Engineering Corp ($10,437,758.00), RB Construction Group, Inc. ($29,597,047.00), DDD Group LLC ($23,972,486.00), J&J Builders Contractor Group, Corp ($22,805,000.00), and Sustech, LLC ($17,467,183.00). All offerors acknowledged all four amendments. Contract items included Base Bid for Primary Facility, Supply Warehouse Facility, Classroom/Break Area, Rigid Concrete and Asphalt Paving, Operational Partition, Personnel Lockers & Benches, Heavy-Duty Shelving and Cantilevered Racks, Supporting Facilities, and Furnishings, Fixtures & Equipment.

View the file

Other files

File Type Posted
Attachment 12 - Existing Utilities.pdf PDF
Attachment 13 - LEED v4 for BDplusC New Construction.pdf PDF
Attachment 11 - Site Visit Pictures 27 May 2026.pdf PDF
Attachment 03 Addendum 1 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT BidFinal 17 June 2026.pdf PDF
W912LR26BA0020004 SF 30 - Amendment 04 20260617.pdf PDF
Attachment 01 Addendum 1 DRAWINGS C-121 to C-122 Dated 17 June 2026.pdf PDF
Attachment 02 Addendum 1 PRARNG EHMS Camp Santiago SPECIFICATIONS 100 BidFinal 17 June 2026.pdf PDF
W912LR26BA002 EHMS-DPW - RFI Responses 17 June 2026.pdf PDF
W912LR26BA0020003 SF 30 - Amendment 03 20260608.pdf.pdf PDF
W912LR26BA002 PreBid Conf Signing Roster 20260527.pdf PDF
W912LR26BA002 PreBid Conference Site Visit 20260527.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 02 20260528.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 01 20260521.pdf PDF
Attachment 05 - LBP Inspection Reports DPW EHMS.pdf PDF
Attachment 03 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT Bid Final 06 March 2026.pdf PDF
Attachment 08 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
Attachment 07 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 04 - Asbesto Reports DPW Buildings.pdf PDF
Attachment 02 PRARNG EHMS Camp Santiago SPECIFICATIONS ALL VOLUMES.pdf PDF
Attachment 09 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 10 - Geotechnical Report 20 July 2021.pdf PDF
Solicitation - SF 1442 W912LR26BA002 IFB.pdf PDF
Attachment 06 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Attachment 01 PRARNG EHMS Camp Santiago DRAWINGS Final 06 March 2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

2 DATE ISSUED: 12 May 2026
3 DATE OPENED: 25 June 2026 at 2:00 pm
4 ISSUING OFFICE: W7PA USPFO ACTIVITY PR ARNG

KO FOR PRARNG

USAG BLDG 540, BONRINQUENEER ST

FORT BUCHANAN PR 00934

NAME AND TITLE OF CERTIFYING OFFICIAL Type: Amanda Bogue, Contracting Officer
DATE SIGNED: 30 June 2026
undefined: Off
A OFFEROR: Three O, LLC
A OFFEROR_2: MD Design Consultants, LLC
B BID SECURITY Type and amount: Bid Bond/ 20%
B BID SECURITY Type and amount_2: Bid Bond/ 20%
6 NUMBER OF AMENDMENTS ISSUED:
C AMENDMENTS ACKNOWLEDGED: 4
C AMENDMENTS ACKNOWLEDGED_2: 4
7A ITEM NORow1: 0001
7B DESCRIPTION OF OFFERED ITEMRow1: Base Bid - ((EHMS) Primary Facility, DPW
7C EST QUANTITYRow1: 1
D UNITRow1: Job
E UNIT PRICERow1: $16,157,814.00
F ESTIMATED AMOUNTRow1: $16,157,814.00
D UNIT PRICERow1: $16,793,720.00
E ESTIMATED AMOUNTRow1: $16,793,720.00
D UNIT PRICERow1_2: $11,114,046.00
E ESTIMATED AMOUNTRow1_2: $11,114,046.00
7A ITEM NORow2: 1001
7B DESCRIPTION OF OFFERED ITEMRow2: OLI #1 - Supply Warehouse Facility
7C EST QUANTITYRow2: 1
D UNITRow2: Job
E UNIT PRICERow2: $2,213,702.00
F ESTIMATED AMOUNTRow2: $2,213,702.00
D UNIT PRICERow2: $2,168,393.00
E ESTIMATED AMOUNTRow2: $2,168,393.00
D UNIT PRICERow2_2: $2,322,999.00
E ESTIMATED AMOUNTRow2_2: $2,322,999.00
7A ITEM NORow3: 1002
7B DESCRIPTION OF OFFERED ITEMRow3: OLI #2 - Classroom/Break Area
7C EST QUANTITYRow3: 1
D UNITRow3: Job
E UNIT PRICERow3: $1,592,365.00
F ESTIMATED AMOUNTRow3: $1,592,365.00
D UNIT PRICERow3: $1,282,005.00
E ESTIMATED AMOUNTRow3: $1,282,005.00
D UNIT PRICERow3_2: $1,294,002.00
E ESTIMATED AMOUNTRow3_2: $1,294,002.00
7A ITEM NORow4: 1003
7B DESCRIPTION OF OFFERED ITEMRow4: OLI #3 - Rigid Concrete and Asphalt Paving
7C EST QUANTITYRow4: 1
D UNITRow4: Job
E UNIT PRICERow4: $134,289.00
F ESTIMATED AMOUNTRow4: $134,289.00
D UNIT PRICERow4: $605,080.00
E ESTIMATED AMOUNTRow4: $605,080.00
D UNIT PRICERow4_2: $476,784.00
E ESTIMATED AMOUNTRow4_2: $476,784.00
7A ITEM NORow5: 1004
7B DESCRIPTION OF OFFERED ITEMRow5: OLI #4 - Operational Partition at EHMS
7C EST QUANTITYRow5: 1
D UNITRow5: Job
E UNIT PRICERow5: $83,153.00
F ESTIMATED AMOUNTRow5: $83,153.00
D UNIT PRICERow5: $63,032.00
E ESTIMATED AMOUNTRow5: $63,032.00
D UNIT PRICERow5_2: $228,006.00
E ESTIMATED AMOUNTRow5_2: $228,006.00
7A ITEM NORow6: 1005
7B DESCRIPTION OF OFFERED ITEMRow6: OLI #5- Full-Height Personnel Lockers & Benches
7C EST QUANTITYRow6: 1
D UNITRow6: Job
E UNIT PRICERow6: $51,767.00
F ESTIMATED AMOUNTRow6: $51,767.00
D UNIT PRICERow6: $112,540.00
E ESTIMATED AMOUNTRow6: $112,540.00
D UNIT PRICERow6_2: $76,806.00
E ESTIMATED AMOUNTRow6_2: $76,806.00
7A ITEM NORow7: 1006
7B DESCRIPTION OF OFFERED ITEMRow7: OLI # 6- Heavy-Duty Shelving and Cantilevered Racks
7C EST QUANTITYRow7: 1
D UNITRow7: Job
E UNIT PRICERow7: $143,824.00
F ESTIMATED AMOUNTRow7: $143,824.00
D UNIT PRICERow7: $201,786.00
E ESTIMATED AMOUNTRow7: $201,786.00
D UNIT PRICERow7_2: $78,012.00
E ESTIMATED AMOUNTRow7_2: $78,012.00
7A ITEM NORow8: 1007
7B DESCRIPTION OF OFFERED ITEMRow8: OLI #7- Supporting Facilities
7C EST QUANTITYRow8: 1
D UNITRow8: Job
E UNIT PRICERow8: $1,243,983.93
F ESTIMATED AMOUNTRow8: $1,243,983.93
D UNIT PRICERow8: $2,799,880.00
E ESTIMATED AMOUNTRow8: $2,799,880.00
D UNIT PRICERow8_2: $3,014,109.00
E ESTIMATED AMOUNTRow8_2: $3,014,109.00
7A ITEM NORow9: 1008
7B DESCRIPTION OF OFFERED ITEMRow9: OLI #8- Furnitures, Fixtures & Equipment (FF&E)
7C EST QUANTITYRow9: 1
D UNITRow9: Job
E UNIT PRICERow9: $400,412.61
F ESTIMATED AMOUNTRow9: $400,412.61
D UNIT PRICERow9: $676,344.00
E ESTIMATED AMOUNTRow9: $676,344.00
D UNIT PRICERow9_2: $127,404.00
E ESTIMATED AMOUNTRow9_2: $127,404.00
7A ITEM NORow10:
7B DESCRIPTION OF OFFERED ITEMRow10: TOTAL
7C EST QUANTITYRow10:
D UNITRow10: Total
E UNIT PRICERow10:
F ESTIMATED AMOUNTRow10: $22,021,310.54
D UNIT PRICERow10:
E ESTIMATED AMOUNTRow10: $24,702,780.00
D UNIT PRICERow10_2:
E ESTIMATED AMOUNTRow10_2: $18,732,168.00
7A ITEM NORow11:
7B DESCRIPTION OF OFFERED ITEMRow11:
7C EST QUANTITYRow11:
D UNITRow11:
E UNIT PRICERow11:
F ESTIMATED AMOUNTRow11:
D UNIT PRICERow11:
E ESTIMATED AMOUNTRow11:
D UNIT PRICERow11_2:
E ESTIMATED AMOUNTRow11_2:
7A ITEM NORow12:
7B DESCRIPTION OF OFFERED ITEMRow12:
7C EST QUANTITYRow12:
D UNITRow12:
E UNIT PRICERow12:
F ESTIMATED AMOUNTRow12:
D UNIT PRICERow12:
E ESTIMATED AMOUNTRow12:
D UNIT PRICERow12_2:
E ESTIMATED AMOUNTRow12_2:
7A ITEM NORow13:
7B DESCRIPTION OF OFFERED ITEMRow13:
7C EST QUANTITYRow13:
D UNITRow13:
E UNIT PRICERow13:
F ESTIMATED AMOUNTRow13:
D UNIT PRICERow13:
E ESTIMATED AMOUNTRow13:
D UNIT PRICERow13_2:
E ESTIMATED AMOUNTRow13_2:
A OFFEROR_3: Barlovento LLC
A OFFEROR_4: NV Services, LLC
A OFFEROR_5: Advantix Engineering Corp
A OFFEROR_6: RB Construction Group, Inc.
B BID SECURITY Type and amount: Bid Bond/ 20% NTE $3,000,000.00
B BID SECURITY Type and amount_2: Bid Bond/ 20% NTE $3,000,000.00
B BID SECURITY Type and amount_3: Bid Bond/ 20% NTE $3,000,000.00
B BID SECURITY Type and amount_4: Bid Bond/ 20% NTE $3,000,000.00
C AMENDMENTS ACKNOWLEDGED_3: 4
C AMENDMENTS ACKNOWLEDGED_4: 4
C AMENDMENTS ACKNOWLEDGED_5: 4
C AMENDMENTS ACKNOWLEDGED_6: 4
A ITEM NORow1: 0001
B ESTIMATED QUANTITYRow1: 1
C UNITRow1: Job
D UNIT PRICERow1_3: $21,704,610.00
E ESTIMATED AMOUNTRow1_3: $21,704,610.00
D UNIT PRICERow1_4: $18,895,000.00
E ESTIMATED AMOUNTRow1_4: $18,895,000.00
D UNIT PRICERow1_5: $3,718,279.00
E ESTIMATED AMOUNTRow1_5: $3,718,279.00
D UNIT PRICERow1_6: $24,447,207.00
E ESTIMATED AMOUNTRow1_6: $24,447,207.00
A ITEM NORow2: 1001
B ESTIMATED QUANTITYRow2: 1
C UNITRow2: Job
D UNIT PRICERow2_3: $3,178,718.00
E ESTIMATED AMOUNTRow2_3: $3,178,718.00
D UNIT PRICERow2_4: $1,792,000.00
E ESTIMATED AMOUNTRow2_4: $1,792,000.00
D UNIT PRICERow2_5: $1,781,953.00
E ESTIMATED AMOUNTRow2_5: $1,781,953.00
D UNIT PRICERow2_6: $2,530,147.00
E ESTIMATED AMOUNTRow2_6: $2,530,147.00
A ITEM NORow3: 1002
B ESTIMATED QUANTITYRow3: 1
C UNITRow3: Job
D UNIT PRICERow3_3: $1,782,418.00
E ESTIMATED AMOUNTRow3_3: $1,782,418.00
D UNIT PRICERow3_4: $1,232,000.00
E ESTIMATED AMOUNTRow3_4: $1,232,000.00
D UNIT PRICERow3_5: $733,698.00
E ESTIMATED AMOUNTRow3_5: $733,698.00
D UNIT PRICERow3_6: $1,841,132.00
E ESTIMATED AMOUNTRow3_6: $1,841,132.00
A ITEM NORow4: 1003
B ESTIMATED QUANTITYRow4: 1
C UNITRow4: Job
D UNIT PRICERow4_3: $117,487.00
E ESTIMATED AMOUNTRow4_3: $117,487.00
D UNIT PRICERow4_4: $185,800.00
E ESTIMATED AMOUNTRow4_4: $185,800.00
D UNIT PRICERow4_5: $689,600.00
E ESTIMATED AMOUNTRow4_5: $689,600.00
D UNIT PRICERow4_6: $198,887.00
E ESTIMATED AMOUNTRow4_6: $198,887.00
A ITEM NORow5: 1004
B ESTIMATED QUANTITYRow5: 1
C UNITRow5: Job
D UNIT PRICERow5_3: $185,499.00
E ESTIMATED AMOUNTRow5_3: $185,499.00
D UNIT PRICERow5_4: $121,000.00
E ESTIMATED AMOUNTRow5_4: $121,000.00
D UNIT PRICERow5_5: $929,569.00
E ESTIMATED AMOUNTRow5_5: $929,569.00
D UNIT PRICERow5_6: $66,000.00
E ESTIMATED AMOUNTRow5_6: $66,000.00
A ITEM NORow6: 1005
B ESTIMATED QUANTITYRow6: 1
C UNITRow6: Job
D UNIT PRICERow6_3: $92,750.00
E ESTIMATED AMOUNTRow6_3: $92,750.00
D UNIT PRICERow6_4: $54,000.00
E ESTIMATED AMOUNTRow6_4: $54,000.00
D UNIT PRICERow6_5: $111,556.00
E ESTIMATED AMOUNTRow6_5: $111,556.00
D UNIT PRICERow6_6: $51,684.00
E ESTIMATED AMOUNTRow6_6: $51,684.00
A ITEM NORow7: 1006
B ESTIMATED QUANTITYRow7: 1
C UNITRow7: Job
D UNIT PRICERow7_3: $89,040.00
E ESTIMATED AMOUNTRow7_3: $89,040.00
D UNIT PRICERow7_4: $271,000.00
E ESTIMATED AMOUNTRow7_4: $271,000.00
D UNIT PRICERow7_5: $181,170.00
E ESTIMATED AMOUNTRow7_5: $181,170.00
D UNIT PRICERow7_6: $202,081.00
E ESTIMATED AMOUNTRow7_6: $202,081.00
A ITEM NORow8: 1007
B ESTIMATED QUANTITYRow8: 1
C UNITRow8: Job
D UNIT PRICERow8_3: $37,100.00
E ESTIMATED AMOUNTRow8_3: $37,100.00
D UNIT PRICERow8_4: $100,000.00
E ESTIMATED AMOUNTRow8_4: $100,000.00
D UNIT PRICERow8_5: $1,260,033.00
E ESTIMATED AMOUNTRow8_5: $1,260,033.00
D UNIT PRICERow8_6: NO BID
E ESTIMATED AMOUNTRow8_6: NO BID
A ITEM NORow9: 1008
B ESTIMATED QUANTITYRow9: 1
C UNITRow9: Job
D UNIT PRICERow9_3: $802,721.00
E ESTIMATED AMOUNTRow9_3: $802,721.00
D UNIT PRICERow9_4: $410,000.00
E ESTIMATED AMOUNTRow9_4: $410,000.00
D UNIT PRICERow9_5: $1,031,900.00
E ESTIMATED AMOUNTRow9_5: $1,031,900.00
D UNIT PRICERow9_6: $259,909.00
E ESTIMATED AMOUNTRow9_6: $259,909.00
A ITEM NORow10:
B ESTIMATED QUANTITYRow10: TOTAL
C UNITRow10:
D UNIT PRICERow10_3:
E ESTIMATED AMOUNTRow10_3: $27,990,343.00
D UNIT PRICERow10_4:
E ESTIMATED AMOUNTRow10_4: $23,060,800.00
D UNIT PRICERow10_5:
E ESTIMATED AMOUNTRow10_5: $10,437,758.00
D UNIT PRICERow10_6:
E ESTIMATED AMOUNTRow10_6: $29,597,047.00
A ITEM NORow11:
B ESTIMATED QUANTITYRow11:
C UNITRow11:
D UNIT PRICERow11_3:
E ESTIMATED AMOUNTRow11_3:
D UNIT PRICERow11_4:
E ESTIMATED AMOUNTRow11_4:
D UNIT PRICERow11_5:
E ESTIMATED AMOUNTRow11_5:
D UNIT PRICERow11_6:
E ESTIMATED AMOUNTRow11_6:
A ITEM NORow12:
B ESTIMATED QUANTITYRow12:
C UNITRow12:
D UNIT PRICERow12_3:
E ESTIMATED AMOUNTRow12_3:
D UNIT PRICERow12_4:
E ESTIMATED AMOUNTRow12_4:
D UNIT PRICERow12_5:
E ESTIMATED AMOUNTRow12_5:
D UNIT PRICERow12_6:
E ESTIMATED AMOUNTRow12_6:
A ITEM NORow13:
B ESTIMATED QUANTITYRow13:
C UNITRow13:
D UNIT PRICERow13_3:
E ESTIMATED AMOUNTRow13_3:
D UNIT PRICERow13_4:
E ESTIMATED AMOUNTRow13_4:
D UNIT PRICERow13_5:
E ESTIMATED AMOUNTRow13_5:
D UNIT PRICERow13_6:
E ESTIMATED AMOUNTRow13_6:
A OFFEROR_7: DDD Group LLC
A OFFEROR_8: J&J Builders Contractor Group, Corp
A OFFEROR_9: Sustech, LLC
A OFFEROR_10:
B BID SECURITY Type and amount_5: Bid Bond/ 20% NTE $3,000,000.00
B BID SECURITY Type and amount_6: Bid Bond/ 20% NTE $3,000,000.00
B BID SECURITY Type and amount_7: Bid Bond/ 20%
B BID SECURITY Type and amount_8:
C AMENDMENTS ACKNOWLEDGED_7: 4
C AMENDMENTS ACKNOWLEDGED_8: 4
C AMENDMENTS ACKNOWLEDGED_9: 4
C AMENDMENTS ACKNOWLEDGED_10:
A ITEM NORow1_2: 0001
B ESTIMATED QUANTITYRow1_2: 1
C UNITRow1_2: Job
D UNIT PRICERow1_7: $18,271,637.00
E ESTIMATED AMOUNTRow1_7: $18,271,637.00
D UNIT PRICERow1_8: $17,500,000.00
E ESTIMATED AMOUNTRow1_8: $17,500,000.00
D UNIT PRICERow1_9: $10,245,396.00
E ESTIMATED AMOUNTRow1_9: $10,245,396.00
D UNIT PRICERow1_10:
E ESTIMATED AMOUNTRow1_10:
A ITEM NORow2_2: 1001
B ESTIMATED QUANTITYRow2_2: 1
C UNITRow2_2: Job
D UNIT PRICERow2_7: $1,901,730.00
E ESTIMATED AMOUNTRow2_7: $1,901,730.00
D UNIT PRICERow2_8: $2,608,300.00
E ESTIMATED AMOUNTRow2_8: $2,608,300.00
D UNIT PRICERow2_9: $1,866,056.00
E ESTIMATED AMOUNTRow2_9: $1,866,056.00
D UNIT PRICERow2_10:
E ESTIMATED AMOUNTRow2_10:
A ITEM NORow3_2: 1002
B ESTIMATED QUANTITYRow3_2: 1
C UNITRow3_2: Job
D UNIT PRICERow3_7: $2,708,237.00
E ESTIMATED AMOUNTRow3_7: $2,708,237.00
D UNIT PRICERow3_8: $1,637,700.00
E ESTIMATED AMOUNTRow3_8: $1,637,700.00
D UNIT PRICERow3_9: $1,070,822.00
E ESTIMATED AMOUNTRow3_9: $1,070,822.00
D UNIT PRICERow3_10:
E ESTIMATED AMOUNTRow3_10:
A ITEM NORow4_2: 1003
B ESTIMATED QUANTITYRow4_2: 1
C UNITRow4_2: Job
D UNIT PRICERow4_7: $384,974.00
E ESTIMATED AMOUNTRow4_7: $384,974.00
D UNIT PRICERow4_8: $230,000.00
E ESTIMATED AMOUNTRow4_8: $230,000.00
D UNIT PRICERow4_9: $151,032.00
E ESTIMATED AMOUNTRow4_9: $151,032.00
D UNIT PRICERow4_10:
E ESTIMATED AMOUNTRow4_10:
A ITEM NORow5_2: 1004
B ESTIMATED QUANTITYRow5_2: 1
C UNITRow5_2: Job
D UNIT PRICERow5_7: $74,366.00
E ESTIMATED AMOUNTRow5_7: $74,366.00
D UNIT PRICERow5_8: $74,000.00
E ESTIMATED AMOUNTRow5_8: $74,000.00
D UNIT PRICERow5_9: $70,211.00
E ESTIMATED AMOUNTRow5_9: $70,211.00
D UNIT PRICERow5_10:
E ESTIMATED AMOUNTRow5_10:
A ITEM NORow6_2: 1005
B ESTIMATED QUANTITYRow6_2: 1
C UNITRow6_2: Job
D UNIT PRICERow6_7: $53,120.00
E ESTIMATED AMOUNTRow6_7: $53,120.00
D UNIT PRICERow6_8: $20,000.00
E ESTIMATED AMOUNTRow6_8: $20,000.00
D UNIT PRICERow6_9: $46,906.00
E ESTIMATED AMOUNTRow6_9: $46,906.00
D UNIT PRICERow6_10:
E ESTIMATED AMOUNTRow6_10:
A ITEM NORow7_2: 1006
B ESTIMATED QUANTITYRow7_2: 1
C UNITRow7_2: Job
D UNIT PRICERow7_7: $188,274.00
E ESTIMATED AMOUNTRow7_7: $188,274.00
D UNIT PRICERow7_8: $200,000.00
E ESTIMATED AMOUNTRow7_8: $200,000.00
D UNIT PRICERow7_9: $225,035.00
E ESTIMATED AMOUNTRow7_9: $225,035.00
D UNIT PRICERow7_10:
E ESTIMATED AMOUNTRow7_10:
A ITEM NORow8_2: 1007
B ESTIMATED QUANTITYRow8_2: 1
C UNITRow8_2: Job
D UNIT PRICERow8_7: $67,239.00
E ESTIMATED AMOUNTRow8_7: $67,239.00
D UNIT PRICERow8_8: $200,000.00
E ESTIMATED AMOUNTRow8_8: $200,000.00
D UNIT PRICERow8_9: $3,483,013.00
E ESTIMATED AMOUNTRow8_9: $3,483,013.00
D UNIT PRICERow8_10:
E ESTIMATED AMOUNTRow8_10:
A ITEM NORow9_2: 1008
B ESTIMATED QUANTITYRow9_2: 1
C UNITRow9_2: Job
D UNIT PRICERow9_7: $322,909.00
E ESTIMATED AMOUNTRow9_7: $322,909.00
D UNIT PRICERow9_8: $335,000.00
E ESTIMATED AMOUNTRow9_8: $335,000.00
D UNIT PRICERow9_9: $308,712.00
E ESTIMATED AMOUNTRow9_9: $308,712.00
D UNIT PRICERow9_10:
E ESTIMATED AMOUNTRow9_10:
A ITEM NORow10_2:
B ESTIMATED QUANTITYRow10_2: TOTAL
C UNITRow10_2:
D UNIT PRICERow10_7:
E ESTIMATED AMOUNTRow10_7: $23,972,486.00
D UNIT PRICERow10_8:
E ESTIMATED AMOUNTRow10_8: $22,805,000.00
D UNIT PRICERow10_9:
E ESTIMATED AMOUNTRow10_9: $17,467,183.00
D UNIT PRICERow10_10:
E ESTIMATED AMOUNTRow10_10:
A ITEM NORow11_2:
B ESTIMATED QUANTITYRow11_2:
C UNITRow11_2:
D UNIT PRICERow11_7:
E ESTIMATED AMOUNTRow11_7:
D UNIT PRICERow11_8:
E ESTIMATED AMOUNTRow11_8:
D UNIT PRICERow11_9:
E ESTIMATED AMOUNTRow11_9:
D UNIT PRICERow11_10:
E ESTIMATED AMOUNTRow11_10:
A ITEM NORow12_2:
B ESTIMATED QUANTITYRow12_2:
C UNITRow12_2:
D UNIT PRICERow12_7:
E ESTIMATED AMOUNTRow12_7:
D UNIT PRICERow12_8:
E ESTIMATED AMOUNTRow12_8:
D UNIT PRICERow12_9:
E ESTIMATED AMOUNTRow12_9:
D UNIT PRICERow12_10:
E ESTIMATED AMOUNTRow12_10:
A ITEM NORow13_2:
B ESTIMATED QUANTITYRow13_2:
C UNITRow13_2:
D UNIT PRICERow13_7:
E ESTIMATED AMOUNTRow13_7:
D UNIT PRICERow13_8:
E ESTIMATED AMOUNTRow13_8:
D UNIT PRICERow13_9:
E ESTIMATED AMOUNTRow13_9:
D UNIT PRICERow13_10:
E ESTIMATED AMOUNTRow13_10:
2026-06-30T11:38:14-0400
BOGUE.AMANDA.MARIE.1294920966
Page1: 1
Pages: 3
PAGES: 3
PAGES2: 2
PAGES_2: 3
PAGES_22: 3
undefined_2: Off
undefined_3: On
Text4: 3
Text5: 4
Text6: 5
Text7: 6
Text42: 7
Text52: 8
Text62: 9
Text72:
1 SOLICITATION NUMBER: W912LR26BA0002
PROJECT TITLE: PN 431850 Military Construction of Engineering Housing and Maintenance Shops (EHMS), Directorate of Public Works (DPW), at Camp Santiago Joint Training Center, Salinas, PR 00751

File details come from the government source that posted it. Updated .