Attachment 13 - LEED v4 for BDplusC New Construction.pdf

PDF 288 KB Posted

Attached to
Invitation for Bid: Army National Guard Military Construction, Engineering/Housing Maintenance Shop, Camp Santiago, Salinas, PR
Solicitation number
W912LR26BA0002
Issued by

About this file

This document is a LEED v4 for BD+C: New Construction Project Checklist for the PR ARNG EHMS (Puerto Rico Army National Guard Emergency Headquarters and Medical Services) facility, dated June 2, 2023. The checklist presents two scenarios: a Base Bid configuration and an All OLIs (Optional Line Items) configuration, each tracking potential LEED certification points across nine performance categories.

The Base Bid scenario demonstrates 53 achievable points out of 110 possible points, positioning the project for Silver certification (50-59 points). The All OLIs scenario shows 50 achievable points, also qualifying for Silver certification. Both configurations track performance across Integrative Process (1 point), Location and Transportation (16 points), Sustainable Sites (10 points), Water Efficiency (11 points), Energy and Atmosphere (33 points), Materials and Resources (13 points), Indoor Environmental Quality (16 points), Innovation (6 points), and Regional Priority (4 points). The checklist identifies multiple prerequisites that are mandatory across categories including Construction Activity Pollution Prevention, Outdoor Water Use Reduction, Indoor Water Use Reduction, Building-Level Water Metering, Minimum Indoor Air Quality Performance, Environmental Tobacco Smoke Control, Fundamental Commissioning and Verification, Minimum Energy Performance, and Building-Level Energy Metering. The scorecard notes that all requirements are detailed in specification section 018113 and that the checklist is subject to change throughout the project process.

View the file

Other files

File Type Posted
W912LR26BA002 OF1419 - Abstract of Bids - KO Signed 20260630.pdf PDF
Attachment 12 - Existing Utilities.pdf PDF
Attachment 11 - Site Visit Pictures 27 May 2026.pdf PDF
Attachment 03 Addendum 1 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT BidFinal 17 June 2026.pdf PDF
W912LR26BA0020004 SF 30 - Amendment 04 20260617.pdf PDF
Attachment 01 Addendum 1 DRAWINGS C-121 to C-122 Dated 17 June 2026.pdf PDF
Attachment 02 Addendum 1 PRARNG EHMS Camp Santiago SPECIFICATIONS 100 BidFinal 17 June 2026.pdf PDF
W912LR26BA002 EHMS-DPW - RFI Responses 17 June 2026.pdf PDF
W912LR26BA0020003 SF 30 - Amendment 03 20260608.pdf.pdf PDF
W912LR26BA002 PreBid Conf Signing Roster 20260527.pdf PDF
W912LR26BA002 PreBid Conference Site Visit 20260527.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 02 20260528.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 01 20260521.pdf PDF
Attachment 05 - LBP Inspection Reports DPW EHMS.pdf PDF
Attachment 03 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT Bid Final 06 March 2026.pdf PDF
Attachment 08 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
Attachment 07 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 04 - Asbesto Reports DPW Buildings.pdf PDF
Attachment 02 PRARNG EHMS Camp Santiago SPECIFICATIONS ALL VOLUMES.pdf PDF
Attachment 09 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 10 - Geotechnical Report 20 July 2021.pdf PDF
Solicitation - SF 1442 W912LR26BA002 IFB.pdf PDF
Attachment 06 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Attachment 01 PRARNG EHMS Camp Santiago DRAWINGS Final 06 March 2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED v4 for BD+C: New Construction

Project Checklist

Y Y? N? N

1 0 0 0 Credit 1

6 0 1 9 16 5 1 0 7 13 0 0 0 0 Credit 1 16 Y Prereq 1 Required 1 0 0 0 Credit 2 1 Y Prereq 2 Required 1 0 0 1 Credit 3 2 1 0 0 4 Credit 1 5

2 0 0 3 Credit 4 5 1 0 0 1 Credit 2 2

0 0 0 5 Credit 5 5 0 1 0 1 Credit 3 2 1 0 0 0 Credit 6 1 1 0 0 1 Credit 4 Building Product Disclosure and Optimization - Material Ingredients 2 0 0 1 0 Credit 7 1 2 0 0 0 Credit 5 2 1 0 0 0 Credit 8 1

8 0 0 8 Indoor Environmental Quality 16

5 0 0 5 10 Y Prereq 1 Required Y Prereq 1 Required Y Prereq 2 Required 1 0 0 0 Credit 1 1 1 0 0 1 Credit 1 2 2 0 0 0 Credit 2 2 3 0 0 0 Credit 2 3 1 0 0 0 Credit 3 1 1 0 0 0 Credit 3 1 0 0 0 3 Credit 4 3 2 0 0 0 Credit 4 2 0 0 0 2 Credit 5 2 0 0 0 1 Credit 5 1 1 0 0 0 Credit 6 1 1 0 0 1 Credit 6 2

0 0 0 3 Credit 7 3 8 0 0 3 11 0 0 0 1 Credit 8 1 Y Prereq 1 Required 0 0 0 1 Credit 9 1 Y Prereq 2 Required Y Prereq 3 Required 6 0 0 0 Innovation 6 2 0 0 0 Credit 1 2 5 0 0 0 Credit 1 5 5 0 0 1 Credit 2 6 1 0 0 0 Credit 2 1 0 0 0 2 Credit 3 2 1 0 0 0 Credit 4 1 4 0 0 0 Regional Priority 4

1 0 0 0 Credit 1 1 10 1 2 20 33 1 0 0 0 Credit 2 1 Y Prereq 1 Required 1 0 0 0 Credit 3 1 Y Prereq 2 Required 1 0 0 0 Credit 4 1 Y Prereq 3 Required Y Prereq 4 Required 53 2 3 52 TOTALS Possible Points: 110 0 0 0 6 Credit 1 6 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

10 1 1 6 Credit 2 18 0 0 0 1 Credit 3 1 Notes:

0 0 0 2 Credit 4 2 0 0 0 3 Credit 5 3 0 0 1 0 Credit 6 1 0 0 0 2 Credit 7 2

Project Name: PR ARNG EHMS - Base Bid Date: 6.2.23

Water Metering

Building-Level Water Metering

Green Vehicles

Fundamental Commissioning and Verification

Acoustic Performance Quality Views Daylight Interior Lighting

Site Development - Protect or Restore Habitat

Indoor Air Quality Assessment

Green Power and Carbon Offsets Enhanced Refrigerant Management Renewable Energy Production Demand Response

RP: Outdoor Water Use Reduction

Water Efficiency

Light Pollution Reduction Thermal Comfort

Advanced Energy Metering

Sensitive Land Protection Storage and Collection of RecyclablesLEED for Neighborhood Development Location

Construction and Demolition Waste ManagementReduced Parking Footprint Bicycle Facilities

Construction Activity Pollution Prevention Minimum Indoor Air Quality Performance

Enhanced Indoor Air Quality StrategiesSite Assessment Environmental Tobacco Smoke Control

Building Product Disclosure and Optimization - Sourcing of Raw MaterialsAccess to Quality Transit

Building Product Disclosure and Optimization - Environmental Product DeclarationsSurrounding Density and Diverse Uses

Sustainable Sites

Heat Island Reduction

Low-Emitting Materials

Rainwater Management Construction Indoor Air Quality Management PlanOpen Space

Energy and Atmosphere

Cooling Tower Water Use Indoor Water Use Reduction LEED Accredited Professional

Indoor Water Use Reduction

Innovation

RP: Construction Demo & Waste Management RP: High Priority Site

Optimize Energy Performance Enhanced Commissioning

RP: Site Development - Protect/Restore Habitat

Fundamental Refrigerant Management Building-Level Energy Metering Minimum Energy Performance

LEED scorecard is for informational purposes only and is subject to change throughout the project process. Refer to specification section 018113 for all requirements.

Materials and ResourcesLocation and Transportation

Integrative Process

Building Life-Cycle Impact ReductionHigh Priority Site Construction and Demolition Waste Management Planning

Outdoor Water Use Reduction

LEED v4 for BD+C: New Construction

Project Checklist Project Name: PR ARNG EHMS (ALL OLIs)

Y Y? N? N

1 0 0 0 Credit 1

6 0 1 9 16 5 1 0 7 13 0 0 0 0 Credit 1 16 Y Prereq 1 Required 1 0 0 0 Credit 2 1 Y Prereq 2 Required 1 0 0 1 Credit 3 2 1 0 0 4 Credit 1 5

2 0 0 3 Credit 4 5 1 0 0 1 Credit 2 2

0 0 0 5 Credit 5 5 0 1 0 1 Credit 3 2 1 0 0 0 Credit 6 1 1 0 0 1 Credit 4 Building Product Disclosure and Optimization - Material Ingredients 2 0 0 1 0 Credit 7 1 2 0 0 0 Credit 5 2 1 0 0 0 Credit 8 1

8 0 0 8 Indoor Environmental Quality 16

2 0 2 6 10 Y Prereq 1 Required Y Prereq 1 Required Y Prereq 2 Required 1 0 0 0 Credit 1 1 1 0 0 1 Credit 1 2 0 0 1 1 Credit 2 2 3 0 0 0 Credit 2 3 0 0 1 0 Credit 3 1 1 0 0 0 Credit 3 1 0 0 0 3 Credit 4 3 2 0 0 0 Credit 4 2 0 0 0 2 Credit 5 2 0 0 0 1 Credit 5 1 1 0 0 0 Credit 6 1 1 0 0 1 Credit 6 2

0 0 0 3 Credit 7 3 8 0 0 3 11 0 0 0 1 Credit 8 1 Y Prereq 1 Required 0 0 0 1 Credit 9 1 Y Prereq 2 Required Y Prereq 3 Required 6 0 0 0 Innovation 6 2 0 0 0 Credit 1 2 5 0 0 0 Credit 1 5 5 0 0 1 Credit 2 6 1 0 0 0 Credit 2 1 0 0 0 2 Credit 3 2 1 0 0 0 Credit 4 1 4 0 0 0 Regional Priority 4

1 0 0 0 Credit 1 1 10 1 2 20 33 1 0 0 0 Credit 2 1 Y Prereq 1 Required 1 0 0 0 Credit 3 1 Y Prereq 2 Required 1 0 0 0 Credit 4 1 Y Prereq 3 Required Y Prereq 4 Required 50 2 5 53 TOTALS Possible Points: 110 0 0 0 6 Credit 1 6 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

10 1 1 6 Credit 2 18 0 0 0 1 Credit 3 1 Notes:

0 0 0 2 Credit 4 2 0 0 0 3 Credit 5 3 0 0 1 0 Credit 6 1 0 0 0 2 Credit 7 2

Date: 6.2.23

Water Metering

Building-Level Water Metering

Green Vehicles

Fundamental Commissioning and Verification

Acoustic Performance Quality Views Daylight Interior Lighting

Site Development - Protect or Restore Habitat

Indoor Air Quality Assessment

Green Power and Carbon Offsets Enhanced Refrigerant Management Renewable Energy Production Demand Response

RP: Outdoor Water Use Reduction

Water Efficiency

Light Pollution Reduction Thermal Comfort

Advanced Energy Metering

Sensitive Land Protection Storage and Collection of RecyclablesLEED for Neighborhood Development Location

Construction and Demolition Waste ManagementReduced Parking Footprint Bicycle Facilities

Construction Activity Pollution Prevention Minimum Indoor Air Quality Performance

Enhanced Indoor Air Quality StrategiesSite Assessment Environmental Tobacco Smoke Control

Building Product Disclosure and Optimization - Sourcing of Raw MaterialsAccess to Quality Transit

Building Product Disclosure and Optimization - Environmental Product DeclarationsSurrounding Density and Diverse Uses

Sustainable Sites

Heat Island Reduction

Low-Emitting Materials

Rainwater Management Construction Indoor Air Quality Management PlanOpen Space

Energy and Atmosphere

Cooling Tower Water Use Indoor Water Use Reduction LEED Accredited Professional

Indoor Water Use Reduction

Innovation

RP: Construction Demo & Waste Management RP: High Priority Site

Optimize Energy Performance Enhanced Commissioning

RP: Optimize Energy Performance

Fundamental Refrigerant Management Building-Level Energy Metering Minimum Energy Performance

LEED scorecard is for informational purposes only and is subject to change throughout the project process. Refer to specification section 018113 for all requirements.

Materials and ResourcesLocation and Transportation

Integrative Process

Building Life-Cycle Impact ReductionHigh Priority Site Construction and Demolition Waste Management Planning

File details come from the government source that posted it. Updated .