About this file

This is a Pre-Consultation Request document submitted to Puerto Rico's Permit Management Office (OGPe) by the Puerto Rico National Guard regarding proposed construction projects at Camp Santiago in Salinas, Puerto Rico.

The document outlines multiple construction initiatives funded through the Military Construction (MILCON) program and the Sustainability, Restoration, and Modernization (SRM) program. MILCON projects include construction of a National Guard Readiness Center (approximately 7,538.2456 square meters), an Army Aviation Support Facility at Camp Santiago (7,547.3501 square meters), a Maneuver Area Training Equipment Site with workshops (14,664.7449 square meters), Transient Training Enlisted Personnel Barracks and Officer's Quarters with ten two-level buildings (23,382.5803 square meters), Transient Training Company Headquarters (7,185.3998 square meters), an Engineering/Housing Maintenance Shop, an Electric Utility Microgrid with Power Substation/Switching Station Building (743.2243 square meters), a Transient Training Dining Facility (1,433.3081 square meters), a Modernized Ammunition Supply Point (459.7771 square meters), and Billeting Facilities with six dormitory buildings (15,670 square meters). SRM projects include improvements to the Potable Water Supply System, Fire Station New Construction (1,616.5129 square meters), Medical Clinic Generator installation, Dining Facility renovation, and ARMAG Container Pad construction (325.1606 square meters). The document indicates the projects will utilize existing footprints where possible and comply with applicable federal, state, and local codes and regulations. The pre-consultation was expedited on April 6, 2021.

View the file

Other files

File Type Posted
W912LR26BA002 OF1419 - Abstract of Bids - KO Signed 20260630.pdf PDF
Attachment 12 - Existing Utilities.pdf PDF
Attachment 13 - LEED v4 for BDplusC New Construction.pdf PDF
Attachment 11 - Site Visit Pictures 27 May 2026.pdf PDF
Attachment 03 Addendum 1 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT BidFinal 17 June 2026.pdf PDF
W912LR26BA0020004 SF 30 - Amendment 04 20260617.pdf PDF
Attachment 01 Addendum 1 DRAWINGS C-121 to C-122 Dated 17 June 2026.pdf PDF
Attachment 02 Addendum 1 PRARNG EHMS Camp Santiago SPECIFICATIONS 100 BidFinal 17 June 2026.pdf PDF
W912LR26BA002 EHMS-DPW - RFI Responses 17 June 2026.pdf PDF
W912LR26BA0020003 SF 30 - Amendment 03 20260608.pdf.pdf PDF
W912LR26BA002 PreBid Conf Signing Roster 20260527.pdf PDF
W912LR26BA002 PreBid Conference Site Visit 20260527.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 02 20260528.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 01 20260521.pdf PDF
Attachment 05 - LBP Inspection Reports DPW EHMS.pdf PDF
Attachment 03 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT Bid Final 06 March 2026.pdf PDF
Attachment 08 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
Attachment 07 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf PDF
Attachment 04 - Asbesto Reports DPW Buildings.pdf PDF
Attachment 02 PRARNG EHMS Camp Santiago SPECIFICATIONS ALL VOLUMES.pdf PDF
Attachment 09 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 10 - Geotechnical Report 20 July 2021.pdf PDF
Solicitation - SF 1442 W912LR26BA002 IFB.pdf PDF
Attachment 01 PRARNG EHMS Camp Santiago DRAWINGS Final 06 March 2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .