This document is a civil engineering site plan drawing for the Engineering Housing Maintenance Shop (EHMS) facility at Camp Santiago in Salinas, Puerto Rico, prepared for the Puerto Rico Army National Guard. The drawing set includes an overall site plan and enlarged site plans showing the supply warehouse area, with design completed at 100% bid final phase as of June 2023 by CH2M HILL-HDR JV.
The drawings depict infrastructure improvements including three pavement option line items (OLI): OLI #1 for supply warehouse loading/unloading with rigid pavement, OLI #2 for conference/break facility, and OLI #3 for asphalt and rigid pavement throughout the site. The project includes new concrete curbs, sidewalks, chain link fencing, sliding and swing gates, gravel surfaces, detectable warning surfaces, pavement markings, pedestrian crosswalks, bicycle parking stands and signage, concrete equipment pads for electrical and mechanical systems, removable bollards, low walls, and landscaping consisting of turf grass by seeding. Additional site features include parking areas (rigid and asphalt pavement with 96 spaces at 8 equivalent spaces, 65 spaces at 5 equivalent spaces, 45 spaces at 5 equivalent spaces, and 90 spaces at 10 equivalent spaces), roads with three designated road numbers, a covered corridor, an A/C disposal area, sand and gravel storage areas, trash container areas, and utility infrastructure such as electrical poles, junction boxes, and communication maintenance holes. All distances, coordinates, and elevations are expressed in US Survey feet.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
RAMP
RAMP
RAMPRAMP
NEW
MECHANICAL
YARD AREA
ELEC. TRANSFORMER
STORAGE BUILDING
OPEN COURTYARD
SHOPS
CONFERENCE/BREAK
(OLI #2)
WORKBAY & SHOPS
ADMIN
EXISTING ASPHALT ROAD
PRARNG
LOGISTIC AREA
EXISTING ASPHALT ROAD
EXISTING ASPHALT ROAD
A C
C
ES
S R
O A
D
SE
R
VI
C
E R
O A
D
A C
C
ES
S R
O A
D
SUPPLY
WAREHOUSE
(OLI #1)
30.00' 40.00'
24.00'
8.00'
.67
8.00'
6.00'
32.54'
26.88'
AREA FOR
FUTURE
GENERATOR
4 4 4
2 5
34 34
EXISTING
ASPHALT PAVEMENT
AR
OA
D
NO
.2
ROAD NO.1
RO
AD
N O.
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SI
DE
W
AL
K
GREEN
AREA
G.A
GREEN
AREA
(SEE NOTE 5)
GREEN AREA
GREEN
AREA
GR
EE
N
AR
EA
GR
EE
N
AR
EA
GR
EE
N
AR
EA
ROAD NO.2
RO
AD
N O.
NEW COVERED CORRIDOR
NEW COVERED CORRIDOR
NE
W
C
OV
ER
ED
C
OR
RI
DO
R
NE
W
C
OV
ER
ED
C
OR
RI
DO
R
GREEN AREA
(SEE NOTE 5)
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
GREEN AREA
TYP
GREEN
AREA
(SEE NOTE 5)
GREEN
AREA
(SEE NOTE 5)
OLI
SEE NOTE 6
OLI SEE
NOTE 6
OLI
SEE NOTE 6
OLI
SEE NOTE 6
A/C DISPOSAL AREA
RIGID PAVEMENT (OLI #3)
LOADING/UNLOADING
(OLI #1)
ASPHALT PAVEMENT
(OLI #3)
EHMS PARKING
(EXISTING PAVEMENT)
RIGID PAVEMENT
(OLI #3)
ASPHALT PAVEMENT
(OLI #3)
ASPHALT PAVEMENT
(OLI #3)
RIGID PAVEMENT
(OLI #3)
8.0
0'
E
Q.
S
PA
CE
S
96.00' @ 8 EQ. SPACES36.00' @ 3 EQ. SPACES 65.00' @ 5 EQ. SPACES
.00
.00
.00
16.00'
.00
.08
.47
24.00'8.33'
.05
.00
24.00' 20.50'
6.16'
45.00' @ 5 EQ. SPACES
.00
90.00' @ 10 EQ. SPACES10.00'
30.00'
TYP
TYP
1" = 20'A1 OVERALL SITE PLAN
D
C
B
A
2 3 4 5
Designed:
Drawn :
Checked:
Drawing No.:
Date:
Drawing Title:
Jacobs Project No.:
Scales:
P U
E R
T O
R
I C
O
A
R M
Y
N
A T
I O
N A
L
G
U A
R D
C A
M P
S
A N
T I A
G O
S A
L I N
A S
P
U E
R T
O
R
I C
O
E N
G I N
E E
R I N
G
H
O U
S I N
G
M A
I N
T E
N A
N C
E
S
H O
P
E
H M
S
D3250109
DATEREV DESCRIPTION
501 North Broadway, Saint Louis, Missouri 63102
Metro Office Park
17 Street 2, Suite 400, Guaynabo, PR 00968
CH2M HILL‐
HDR JV
FEET
1" = 20'
200 10
BID FINAL 100% DESIGN
2 JUNE 2023
1. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, SEE DRAWING C-001.
2. FOR OVERALL SURVEY PLAN, REFER TO EXISTING CONDITIONS AND TOPOGRAPHIC SURVEY
PREPARED BY JAVIER BIDOT & ASSOCIATES, P.S.C. ON SHEET C-101.
3. ALL DISTANCES, COORDINATES AND ELEVATIONS ARE EXPRESSED IN US SURVEY FEET U.N.O.
4. FOR OVERALL GRADING PLAN, REFER TO DWG. C-141.
5. PROPOSED GREEN AREAS CONSIST OF TURF GRASS (BY SEEDING). REFER TO SPECIFICATION
32 92 00 AND 32 93 00 FOR MORE INFORMATION.
6. OLI PAVEMENT MARKING ARE SHOWN FOR DIMENSION REFERENCE ONLY. PAVEMENT
MARKINGS INSIDE THE PROPERTY LINE ARE INCLUDED IN THE ASPHALT PAVEMENT OLI #3
AND NOT THE BASE BID.
GENERAL NOTES:
KEYED NOTES:
5 NEW CONCRETE CURB, SEE DETAIL ON SHEET C-501
NEW RIGID PAVEMENT, SEE DETAILS ON SHEET C-501
NEW ASPHALT PAVEMENT, SEE DETAILS ON SHEET C-501
NEW CONCRETE SIDEWALK, SEE DETAIL ON SHEET C-501
NEW CHAIN LINK FENCE, SEE DETAILS ON SHEET C-503
NEW SLIDING GATE, SEE DETAILS ON SHEET C-504
NEW GRAVEL SURFACE, SEE DETAILS ON SHEET C-501
NEW SWING GATE OR FENCE, SEE ARCH PLANS
9 NEW TRASH CONTAINERS AREA, SEE DETAILS ON SHEET C-502
10 NEW PAVEMENT MARKING LINE, SEE DETAILS ON SHEET C-511
11 SAND AND GRAVEL STORAGE AREA
12 NEW DETECTABLE WARNING SURFACE, SEE DETAILS ON SHEET C-502
13 NEW DUST COLLECTOR CONCRETE PAD, SEE DETAILS ON SHEET C-502
14 NEW BUILDING IDENTIFICATION SIGN, SEE ARCH PLANS
15 SECURITY PEDESTAL, REFER TO TELECOMM DWGS.
17 NEW PEDESTRIAN CROSS WALK, SEE DETAILS ON SHEET C-511
FUTURE "EV" CONNECTION FACILITIES, REFER TO ELECTRICAL DWGS.
18 NEW ELEC. EQUIPMENT CONCRETE PAD, SEE DETAILS ON SHEET C-502
19 NEW MECHANICAL EQUIPMENT CONCRETE PAD, SEE DETAILS ON SHEET C-502
20 NEW U BICYCLE STANDS 2 RACK, SEE DETAILS ON SHEET C-501
21 NEW CONCRETE SLIPPER, SEE DETAILS ON SHEET C-502
CIVIL
OVERALL
SITE PLAN
WNH
WNH
JMC C-121
N
22 ELECTRICAL POLE, REFER TO ELECTRICAL DWGS.
23 ELECTRICAL JUNCTION BOX, REFER TO ELECTRICAL DWGS.
24 COMMUNICATION MAINTENANCE HOLE (CMH), REFER TO TELECOMMUNICATION DWGS.
25 EXISTING FLAG POLE TO REMAIN
26 NEW CONCRETE WHEEL STOP, SEE DETAILS ON SHEET C-501
27 NEW PARKING & SYMBOL, SEE DETAILS ON SHEET C-511
28 NEW STOP SIGN, SEE DETAILS ON SHEET C-511
29 NEW BICYCLE PARKING AREA SIGN, SEE DETAILS ON SHEET C-511
30 NEW SAMPLING POINT SIGN ON WALL, SEE DETAILS ON SHEET C-511
31 NEW LOCATION FOR EXISTING GENERATOR OVER CONCRETE PAD, SEE DETAILS ON
SHEET C-502
32 REMOVABLE BOLLARD, SEE DETAILS ON SHEET C-502
33 NEW LOCATION FOR EXISTING AUTOMATIC TRANSFER SWITCH. REFER TO ELEC. DWGS.
34 NEW LOW WALL, SEE DETAIL ON SHEET C-502.
35 COMMUNICATION HANDHOLE, REFER TO TELECOMMUNICATION DWGS.
06 MARCH 2026
/1
/2
:1
:3
P
M C
:\p w w or ki ng
\ja co bs _b
&i \je g_ no la sc w o\ d0
OLI #3
Colon, Jesus M Rectangle
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Polygon
Colon, Jesus M Rectangle
A C
C
ES
S R
O A
D
RAMP
RAMP
RAMP
RAMP
.00
.08
24.00'8.33'
6.16'
.50
SUPPLY
WAREHOUSE
ADMIN SHOPS
CONFERENCE/BREAK
(OLI #2)
RO
AD
N O.
SIDEWALK
SIDEWALK
SIDEWALK
GREEN
AREA
(SEE NOTE 5)
GREEN AREA
(SEE NOTE 5)
GREEN
AREA GREEN
AREA
GR
EE
N
AR
EA
ROAD NO.2
NEW COVERED CORRIDOR
NE
W
C
OV
ER
ED
C
OR
RI
DO
R
NE
W
C
OV
ER
ED
C
OR
RI
DO
R
LOADING/UNLOADING
(RIGID PAVEMENT OLI #3)
1" = 10'A1 ENLARGED SITE PLAN (SUPPLY WAREHOUSE OLI)
D
C
B
A
2 3 4 5
Designed:
Drawn :
Checked:
Drawing No.:
Date:
Drawing Title:
Jacobs Project No.:
Scales:
P U
E R
T O
R
I C
O
A
R M
Y
N
A T
I O
N A
L
G
U A
R D
C A
M P
S
A N
T I A
G O
S A
L I N
A S
P
U E
R T
O
R
I C
O
E N
G I N
E E
R I N
G
H
O U
S I N
G
M A
I N
T E
N A
N C
E
S
H O
P
E
H M
S
D3250109
DATEREV DESCRIPTION
501 North Broadway, Saint Louis, Missouri 63102
Metro Office Park
17 Street 2, Suite 400, Guaynabo, PR 00968
CH2M HILL‐
HDR JV
FEET
1" = 10'
100 5
BID FINAL 100% DESIGN
2 JUNE 2023
1. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, SEE DRAWING C-001.
2. FOR OVERALL SURVEY PLAN, REFER TO EXISTING CONDITIONS AND TOPOGRAPHIC
SURVEY PREPARED BY JAVIER BIDOT & ASSOCIATES, P.S.C. ON SHEET C-101.
3. ALL DISTANCES, COORDINATES AND ELEVATIONS ARE EXPRESSED IN FEET U.N.O.
4. FOR OVERALL GRADING PLAN, REFER TO DWG. C-141.
5. PROPOSED GREEN AREAS CONSIST OF TURF GRASS (BY SEEDING). REFER TO
SPECIFICATION 32 92 00 AND 32 93 00 FOR MORE INFORMATION.
GENERAL NOTES:
KEYED NOTES:
CIVIL
ENLARGED SITE PLAN
(SUPPLY WAREHOUSE OLI)
WNH
WNH
JMC C-122
5 NEW CONCRETE CURB, SEE DETAIL ON SHEET C-501
NEW RIGID PAVEMENT, SEE DETAILS ON SHEET C-501
NEW ASPHALT PAVEMENT, SEE DETAILS ON SHEET C-501
NEW CONCRETE SIDEWALK, SEE DETAIL ON SHEET C-501
NEW CHAIN LINK FENCE, SEE DETAILS ON SHEET C-503
NEW SLIDING GATE, SEE DETAILS ON SHEET C-504
NEW GRAVEL SURFACE, SEE DETAILS ON SHEET C-501
NEW SWING GATE, SEE DETAILS ON SHEET C-504
9 NEW TRASH CONTAINERS AREA, SEE DETAILS ON SHEET C-502
10 NEW PAVEMENT MARKING LINE, SEE DETAILS ON SHEET C-511
11 SAND AND GRAVEL STORAGE AREA
12 NEW DETECTABLE WARNING SURFACE, SEE DETAILS ON SHEET C-502
13 NEW DUST COLLECTOR CONCRETE PAD, SEE DETAILS ON SHEET C-502
14 NEW BUILDING IDENTIFICATION SING, SEE ARCH PLANS
15 SECURITY PEDESTAL, REFER TO TELECOMM DWGS.
17 NEW PEDESTRIAN CROSS WALK, SEE DETAILS ON SHEET C-511
FUTURE "EV" CONNECTION FACILITIES, REFER TO ELECTRICAL DWGS.
18 NEW ELEC. EQUIPMENT CONCRETE PAD, SEE DETAILS ON SHEET C-502
19 NEW MECHANICAL EQUIPMENT CONCRETE PAD, SEE DETAILS ON SHEET C-502
20 NEW U BICYCLE STANDS 2 RACK, SEE DETAILS ON SHEET C-501
21 NEW CONCRETE SLIPPER, SEE DETAILS ON SHEET C-502
22 ELECTRICAL POLE, REFER TO ELECTRICAL DWGS.
23 ELECTRICAL JUNCTION BOX, REFER TO ELECTRICAL DWGS.
24 COMMUNICATION MAINTENANCE HOLE (CMH), REFER TO TELECOMMUNICATION DWGS.
N
25 EXISTING FLAG POLE TO REMAIN
26 NEW CONCRETE WHEEL STOP, SEE DETAILS ON SHEET C-501
27 NEW PARKING & SYMBOL, SEE DETAILS ON SHEET C-511
28 NEW STOP SIGN, SEE DETAILS ON SHEET C-511
29 NEW BICYCLE PARKING AREA SIGN, SEE DETAILS ON SHEET C-511
30 NEW SAMPLING POINT SIGN ON WALL, SEE DETAILS ON SHEET C-511
31 NEW LOCATION FOR EXISTING GENERATOR OVER CONCRETE PAD, SEE DETAILS ON
SHEET C-502
32 REMOVABLE BOLLARD, SEE DETAILS ON SHEET C-502
33 NEW LOCATION FOR EXISTING AUTOMATIC TRANSFER SWITCH. REFER TO ELEC. DWGS.
34 NEW LOW WALL, SEE DETAIL ON SHEET C-502.
35 COMMUNICATION HANDHOLE, REFER TO TELECOMMUNICATION DWGS.
06 MARCH 2026
/1
/2
:1
:3
P
M C
:\p w w or ki ng
\ja co bs _b
&i \je g_ no la sc w o\ d0
Colon, Jesus M Rectangle
Colon, Jesus M Polygon
| G-000 - GENERAL COVER |
| G-001 - GENERAL DRAWING INDEX |
| LS001 - LIFE SAFETY CODE ANALYSIS |
| LS002 - LIFE SAFETY - CODE COMPLIANCE SITE PLAN |
| LS101 - LIFE SAFETY PLAN |
| C-001 - CIVIL ABBREVIATIONS, LEGEND & GENERAL NOTES |
| C-101 - CIVIL OVERALL EXISTING CONDITIONS SITE PLAN |
| C-111 - CIVIL OVERALL DEMOLITION SITE PLAN |
| C-121 - CIVIL OVERALL SITE PLAN |
| C-122 - CIVIL ENLARGED SITE PLAN (SUPPLY WAREHOUSE OLI) |
| C-123 - CIVIL ENLARGED SITE PLAN (CONFERENCE-BREAK OLI) |
| C-131 - CIVIL OVERALL GEOMETRIC PLAN |
| C-132 - CIVIL ENLARGED GEOMETRIC PLAN (SUPPLY WAREHOUSE OLI) |
| C-133 - CIVIL ENLARGED GEOMETRIC PLAN (CONFERENCE-BREAK OLI) |
| C-134 - CIVIL GEOMETRIC DATA SHEET |
| C-141 - CIVIL OVERALL GRADING PLAN |
| C-142 - CIVIL ENLARGED GRADING PLAN SECTOR A |
| C-143 - CIVIL ENLARGED GRADING PLAN SECTOR A (OLI) |
| C-144 - CIVIL ENLARGED GRADING PLAN SECTOR B |
| C-151 - CIVIL OVERALL STORMWATER MANAGEMENT PLAN |
| C-152 - CIVIL ENLARGED STORMWATER MANAGEMENT PLAN (OLI) |
| C-153 - CIVIL OVERALL DRAINAGE ANALYSI PLAN PRE-PREDEVELOPMENT CONDITIONS |
| C-154 - CIVIL OVERALL DRAINAGE ANALYSI PLAN POST-DEVELOPMENT CONDITIONS |
| C-161 - CIVIL OVERALL SANITARY SEWER PLAN |
| C-171 - CIVIL OVERALL WATER & FIRE DISTRIBUTION PROTECTION PLAN |
| C-181 - CIVIL OVERALL UTILITY SITE PLAN |
| C-191 - CIVIL OVERALL EROSION & SEDIMENT CONTROL PLAN |
| C-201 - CIVIL ROAD PROFILES |
| C-211 - CIVIL STORMWATER MANAGEMENT PROFILES |
| C-221 - CIVIL SANITARY SEWER PROFILES |
| C-301 - CIVIL SITE CROSS SECTIONS SHEET NO.1 |
| C-302 - CIVIL SITE CROSS SECTIONS SHEET NO.2 |
| C-401 - CIVIL ENLARGED STORMWATER EN SECTION PLAN AND DETAILS |
| C-501 - CIVIL SITE DETAILS SHEET NO.1 |
| C-502 - CIVIL SITE DETAILS SHEET NO.2 |
| C-503 - CIVIL CHAIN-LINK SECURITY FENCE DETAILS |
| C-504 - CIVIL CHAIN-LINK SECURITY FENCE GATE DETAILS |
| C-505 - CIVIL STORMWATER MANAGEMENT DETAILS |
| C-505A - CIVIL STORMWATER MANAGEMENT DETAILS |
| C-506 - CIVIL SANITARY SEWER DETAILS |
| C-507 - CIVIL LIFT STATION & OIL INTERCEPTOR DETAILS |
| C-508 - CIVIL UNDERGROUND UTILITIES DETAILS SHEET NO.1 |
| C-509 - CIVIL UNDERGROUND UTILITIES DETAILS SHEET NO.2 |
| C-510 - CIVIL EROSION AND SEDIMENT CONTROL DETAILS |
| C-511 - CIVIL PAVEMENT MARKING & SIGNAGE DETAILS |
| S-001 - STRUCTURAL GENERAL NOTES |
| S-002 - STRUCTURAL GENERAL NOTES AND ABBREVIATIONS |
| S-003 - STRUCTURAL WIND PRESSURE DIAGRAMS ADMINISTRATION, SHOPS & WORKBAYS BUILDINGS |
| S-004 - STRUCTURAL WIND PRESSURE DIAGRAMS (SUPPLY WAREHOUSE OLI) |
| S-005 - STRUCTURAL WIND PRESSURE DIAGRAMS (CONFERENCE/BREAK OLI) |
| S-100 - STRUCTURAL OVERALL FOUNDATION AND SLAB-ON-GROUND PLAN |
| S-101 - STRUCTURAL FOUNDATION AND SLAB-ON-GROUND PLAN |
| S-102 - STRUCTURAL FOUNDATION AND SLAB-ON-GOUND PLAN (SUPPLY WAREHOUSE OLI) |
| S-103 - STRUCTURAL FOUNDATION AND SLAB-ON-GROUN PLAN (CONFERENCE/BREAK OLI) |
| S-120 - STRUCTURAL OVERALL ROOF FRAMING PLAN |
| S-121 - STRUCTURAL ROOF FRAMING PLAN |
| S-122 - STRUCTURAL ROOF FRAMING PLAN (SUPPLY WAREHOUSE OLI) |
| S-123 - STRUCTURAL ROOF FRAMING PLAN (CONFERENCE/BREAK OLI) |
| S-200 - STRUCTURAL WALL ELEVATIONS |
| S-201 - STRUCTURAL WALL ELEVATIONS |
| S-202 - STRUCTURAL WALL ELEVATIONS |
| S-203 - STRUCTURAL WALL ELEVATIONS (SUPPLY WAREHOUSE OLI) |
| S-204 - STRUCTURAL WALL ELEVATIONS (CONFERENCE/BREAK OLI) |
| S-501 - STRUCTURAL TYPICAL SECTIONS AND DETAILS |
| S-502 - STRUCTURAL TYPICAL SECTIONS AND DETAILS |
| S-503 - STRUCTURAL TYPICAL SECTIONS AND DETAILS |
| S-511 - STRUCTURAL MASONRY SECTIONS AND DETAILS |
| S-512 - STRUCTURAL MASONRY SECTIONS AND DETAILS |
| S-521 - STRUCTURAL STEEL SECTIONS AND DETAILS |
| S-522 - STRUCTURAL STEEL SECTIONS AND DETAILS |
| S-531 - STRUCTURAL UTILITY SUPPORT SECTIONS AND DETAILS |
| S-532 - STRUCTURAL UTILITY SUPPORT SECTIONS AND DETAILS |
| A-001 - ARCHITECTURAL GENERAL NOTES |
| A-101 - ARCHITECTURAL FLOOR PLAN |
| A-102 - ARCHITECTURAL FLOOR PLAN AND REFLECTED CEILING PLAN (SUPPLY WAREHOUSE OLI) |
| A-103 - ARCHITECTURAL FLOOR PLAN AND REFLECTED CEILING PLAN (CONFERENCE/BREAK OLI) |
| A-111 - ARCHITECTURAL REFLECTED CEILING PLAN |
| A-131 - ARCHITECTURAL ROOF PLAN |
| A-201 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-202 - ARCHITECTURAL EXTERIOR ELEVATIONS |
| A-203 - ARCHITECTURAL ROOF PLAN AND EXTERIOR ELEVATIONS (SUPPLY WAREHOUSE OLI) |
| A-204 - ARCHITECTURAL ROOF PLAN AND EXTERIOR ELEVATIONS (CONFERENCE/BREAK OLI) |
| A-301 - ARCHITECTURAL BUILDING SECTIONS |
| A-401 - ARCHITECTURAL ENLARGED FLOOR PLANS AND TOILET ACCESSORIES |
| A-402 - ARCHITECTURAL ENLARGED PLANS AND ELEVATIONS OF TRANSFORMER STOR BLDG |
| A-411 - ARCHITECTURAL INTERIOR ELEVATIONS |
| A-430 - ARCHITECTURAL VERTICAL CIRCULATION ENLARGED PLANS AND DETAILS |
| A-501 - ARCHITECTURAL EXTERIOR WALL SECTIONS |
| A-502 - ARCHITECTURAL EXTERIOR WALL SECTIONS |
| A-503 - ARCHITECTURAL EXTERIOR WALL SECTIONS |
| A-504 - ARCHITECTURAL EXTERIOR WALL SECTIONS (SUPPLY WAREHOUSE OLI) |
| A-505 - ARCHITECTURAL EXTERIOR WALL SECTIONS (CONFERENCE/BREAK OLI) |
| A-511 - ARCHITECTURAL EXTERIOR WALL DETAILS |
| A-531 - ARCHITECTURAL ENLARGED PLAN DETAILS |
| A-551 - ARCHITECTURAL ROOF DETAILS |
| A-571 - ARCHITECTURAL INTERIOR DETAILS |
| A-572 - ARCHITECTURAL INTERIOR DETAILS |
| A-573 - ARCHITECTURAL CEILING DETAILS |
| A-581 - ARCHITECTURAL WIRE MESH PARTITION PLANS AND DETAILS |
| A-601 - ARCHITECTURAL FURNITURE AND FINISH FLOOR PLAN |
| A-602 - ARCHITECTURAL FURNITURE AND FINISH FLOOR PLAN (SUPPLY WAREHOUSE OLI) |
| A-610 - ARCHITECTURAL ROOM FINISH SCHEDULE AND MATERIAL LEGEND |
| A-630 - ARCHITECTURAL DOOR SCHEDULE |
| A-631 - ARCHITECTURAL DOOR DETAILS |
| A-650 - ARCHITECTURAL WINDOW & LOUVER TYPES |
| A-651 - ARCHITECTURAL STOREFRONT DETAILS |
| A-652 - ARCHITECTURAL SUN SHADE PLANS AND DETAILS |
| A-701 - ARCHITECTURAL PARTITION TYPES |
| A-800 - ARCHITECTURAL INTERIOR DETAILS |
| A-801 - ARCHITECTURAL SIGNAGE PLAN |
| A-802 - ARCHITECTURAL SIGNAGE PLAN (OLI) |
| A-811 - ARCHITECTURAL SIGNAGE TYPES AND DETAILS |
| Q-101 - EQUIPMENT FLOOR PLAN |
| Q-102 - EQUIPMENT FLOOR PLAN (SUPPLY WAREHOUSE OLI) |
| Q-501 - EQUIPMENT DETAILS |
| Q-601 - EQUIPMENT SCHEDULE |
| FX001 - FIRE SUPPRESSION GENERAL NOTES, ABBREV., AND SYMBOLS |
| FX002 - FIRE SUPPRESSION SITE PLAN |
| FX101 - FIRE SUPPRESSION PLAN |
| FX102 - FIRE SUPPRESSION PLAN SUPPLY WAREHOUSE OLI |
| FX103 - FIRE SUPPRESSION PLAN CONFERENCE/BREAK OLI |
| FX501 - FIRE SUPPRESSION DETAILS |
| FX502 - FIRE SUPPRESSION FIRE PUMP DETAILS |
| FA001 - FIRE ALARM GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS |
| FA101 - FIRE ALARM/MASS NOTIFICATION PLAN |
| FA102 - FIRE ALARM/MASS NOTIFICATION PLAN SUPPLY WAREHOUSE OLI |
| FA103 - FIRE ALARM/MASS NOTIFICATION PLAN CONFERENCE/BREAK OLI |
| FA501 - FIRE ALARM/MASS NOTIFICATION DETAILS |
| P-001 - PLUMBING GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| P-101 - PLUMBING UNDERFLOOR PLAN |
| P-102 - PLUMBING UNDERFLOOR PLAN (OLI) |
| P-103 - PLUMBING UNDERFLOOR PLAN (OLI) |
| P-111 - PLUMBING ABOVE FLOOR PLAN |
| P-112 - PLUMBING ABOVE FLOOR PLAN (OLI) |
| P-113 - PLUMBING ABOVE FLOOR PLAN (OLI) |
| P-401 - PLUMBING ENLARGED PLANS |
| P-501 - PLUMBING DETAILS |
| P-502 - PLUMBING DETAILS |
| P-503 - PLUMBING DETAILS |
| P-601 - PLUMBING SCHEDULES |
| P-701 - PLUMBING SANITARY RISERS |
| P-702 - PLUMBING WATER RISERS |
| P-703 - PLUMBING COMPRESSED AIR RISERS |
| P-704 - PLUMBING SANITARY & WATER RISERS |
| P-801 - PLUMBING SCHEMATICS |
| P-802 - PLUMBING CONTROLS |
| M-001 - HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| M-002 - HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| M-101 - HVAC FLOOR PLAN |
| M-102 - HVAC FLOOR PLAN (OLI-SW) |
| M-103 - HVAC FLOOR PLAN (OLI #2) |
| M-104 - HVAC ROOF PLAN |
| M-105 - HVAC ROOF PLAN (OLI #1) |
| M-401 - HVAC ENLARGED PLAN |
| M-501 - HVAC DETAILS |
| M-502 - HVAC DETAILS |
| M-503 - HVAC DETAILS |
| M-504 - EQUIPMENT DETAILS |
| M-601 - HVAC SCHEDULES |
| M-801 - BAS CONTROL LEGEND AND ABBREVIATIONS |
| M-802 - BAS CONTROL DIAGRAMS |
| M-803 - BAS CONTROL DIAGRAMS |
| M-804 - BAS CONTROL POINT SCHEDULE |
| M-805 - BAS CONTROL POINT SCHEDULE |
| M-806 - BAS CONTROL POINT SCHEDULE |
| M-807 - BAS CONTROL SEQUENCE OF OPERATIONS |
| E-001 - ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS AND GENERAL NOTES |
| ES101 - ELECTRICAL SITE PLAN |
| EL101 - ELECTRICAL LIGHTING PLAN |
| EL102 - ELECTRICAL LIGHTING PLAN (SUPPLY WAREHOUSE OLI) |
| EL103 - ELECTRICAL LIGHTING PLAN (CONFERENCE/BREAK OLI) |
| EP101 - ELECTRICAL POWER PLAN |
| EP102 - ELECTRICAL POWER PLAN (SUPPLY WAREHOUSE OLI) |
| EP103 - ELECTRICAL POWER PLAN (CONFERENCE/BREAK OLI) |
| EG101 - ELECTRICAL ROOF POWER AND GROUNDING PLAN |
| EG102 - ELECTRICAL ROOF POWER AND GROUNDING PLAN (SUPPLY WAREHOUSE OLI) |
| EG103 - ELECTRICAL ROOF POWER AND GROUNDING PLAN (CONFERENCE/BREAK OLI) |
| E-401 - ELECTRICAL ENLARGED PLANS |
| E-501 - ELECTRICAL DETAILS |
| E-502 - ELECTRICAL DETAILS |
| E-503 - ELECTRICAL DETAILS |
| E-504 - ELECTRICAL DETAILS |
| E-601 - ELECTRICAL SINGLE LINE DIAGRAM AND FEEDER SCHEDULE |
| E-602 - ELECTRICAL GROUNDING RISER DIAGRAM |
| E-701 - ELECTRICAL LIGHTING FIXTURE SCHEDULE |
| E-702 - ELECTRICAL PANEL SCHEDULES |
| E-703 - ELECTRICAL PANEL SCHEDULES |
| E-704 - ELECTRICAL PANEL SCHEDULES |
| E-705 - ELECTRICAL PANEL SCHEDULES |
| E-801 - ELECTRICAL EQUIPMENT SCHEDULES |
| T-001 - TELECOMMUNICATIONS SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| TS101 - TELECOMMUNICATIONS SITE PLAN |
| TS501 - TELECOMMUNICATIONS SITE DUCT BANK DETAILS |
| T-101 T-101 - TELECOMMUNICATIONS PLAN TELECOMMUNICATIONS PLAN |
| T-102 - TELECOMMUNICATIONS SUPPLY WAREHOUSE PLAN -OLI |
| T-103 - TELECOMMUNICATIONS CONFERENCE/BREAK PLAN -OLI |
| T-131 - TELECOMMUNICATIONS ROOF PLAN |
| T-201 - TELECOMMUNICATIONS CABINET ELEVATIONS |
| T-401 - TELECOMMUNICATIONS ENLARGED ROOMS COMMUNICATIONS PLANS |
| T-501 - TELECOMMUNICATIONS OUTLET DETAILS |
| T-502 - TELECOMMUNICATIONS CABLE TRAY DETAILS |
| T-503 - TELECOMMUNICATIONS GROUNDING AND BONDING DETAILS |
| T-504 - TELECOMMUNICATIONS ANTENNA DETAILS |
| T-601 - TELECOMMUNICATIONS VOICE AND DATA ONE-LINE DIAGRAM |
| TY101 - SECURITY PLAN |
| TY102 - SECURITY SUPPLY WAREHOUSE PLAN -OLI |
| TY501 - SECURITY CAMERA MOUNTING DETAILS |
| df-PRARNG EHMS_Code and Critieria Update_Plumbing_04March2026 |
| P-001 - PLUMBING GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| P-101 - PLUMBING UNDERFLOOR PLAN |
| P-102 - PLUMBING UNDERFLOOR PLAN (OLI) |
| P-103 - PLUMBING UNDERFLOOR PLAN (OLI) |
| P-111 - PLUMBING ABOVE FLOOR PLAN |
| P-112 - PLUMBING ABOVE FLOOR PLAN (OLI) |
| P-113 - PLUMBING ABOVE FLOOR PLAN (OLI) |
| P-401 - PLUMBING ENLARGED PLANS |
| P-501 - PLUMBING DETAILS |
| P-502 - PLUMBING DETAILS |
| P-503 - PLUMBING DETAILS |
| P-601 - PLUMBING SCHEDULES |
| P-701 - PLUMBING SANITARY RISERS |
| P-702 - PLUMBING SANITARY RISERS |
| P-703 - PLUMBING SANITARY RISERS |
| P-704 - PLUMBING SANITARY & WATER RISERS |
| P-801 - PLUMBING SCHEMATICS |
| P-802 - PLUMBING CONTROLS |
| df-PRARNG EHMS_Code and Critieria Update_Mechanical_04March2026 |
| M-001 - HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| M-002 - HVAC GENERAL NOTES, LEGENDS, AND ABBREVIATIONS |
| M-101 - HVAC FLOOR PLAN |
| M-102 - HVAC FLOOR PLAN (OLI-SW) |
| M-103 - HVAC FLOOR PLAN (OLI-CB) |
| M-104 - HVAC ROOF PLAN |
| M-105 - HVAC ROOF PLAN (OLI-SW) |
| M-401 - HVAC ENLARGED PLAN |
| M-501 - HVAC DETAILS |
| M-502 - HVAC DETAILS |
| M-503 - HVAC DETAILS |
| M-601 - HVAC SCHEDULES |
| M-801 - BAS CONTROL LEGEND AND ABBREVIATIONS |
| M-802 - BAS CONTROL DIAGRAMS |
| M-803 - BAS CONTROL DIAGRAMS |
| M-804 - BAS CONTROL POINT SCHEDULE |
| M-805 - BAS CONTROL POINT SCHEDULE |
| M-806 - BAS CONTROL POINT SCHEDULE |
| M-807 - BAS CONTROL SEQUENCE OF OPERATIONS |
File details come from the government source that posted it. Updated .