Attachment 07 - PR-EA Master Plan FONSI Final Signed Feb 2021.pdf

PDF 385 KB Posted

Attached to
Invitation for Bid: Army National Guard Military Construction, Engineering/Housing Maintenance Shop, Camp Santiago, Salinas, PR
Solicitation number
W912LR26BA0002
Issued by

About this file

This is a Final Finding of No Significant Impact (FNSI) document issued by the National Guard Bureau approving a Real Property Master Plan and infrastructure projects for military installations in Puerto Rico.

The document approves two primary components: (1) the UFC 2-100-01-compliant Real Property Master Plan for Camp Santiago Joint Training Center (CSJTC) and Fort Allen Training Center (FATC) in southern Puerto Rico, and (2) implementation of near-term infrastructure projects at CSJTC. The proposed action addresses damage from Hurricane Maria in 2017 and real property asset shortfalls at both installations. Component 2 includes eight Military Construction (MILCON) projects and six Sustainment, Restoration, and Modernization (SRM) projects at CSJTC planned for fiscal years 2020-2024. MILCON projects include construction of a National Guard Readiness Center, Army Aviation Support Facility, Maneuver Area Training Equipment Site, Transient Training barracks and officer quarters, Company Headquarters, Engineering/Housing Maintenance Shop, electric power microgrid, and dining facility. SRM projects address improvements to potable water supply, fire station parking, medical clinic generator, dining facility replacement, billeting facility replacement, and ammunition container storage pad. All new facilities are designed to withstand Category 5 hurricane winds and meet 50-year durability standards. Funding sources include MILCON and SRM appropriations. The environmental assessment determined no significant impacts on geology or cultural resources, and less-than-significant adverse impacts on air quality, noise, soils, water resources, biological resources, and hazardous materials. The Puerto Rico State Historic Preservation Office and U.S. Fish and Wildlife Service concurred with environmental determinations. The FNSI was signed February 26, 2021, by Colonel Anthony Hammett, Chief of G-9 Army National Guard.

View the file

Other files

File Type Posted
W912LR26BA002 OF1419 - Abstract of Bids - KO Signed 20260630.pdf PDF
Attachment 12 - Existing Utilities.pdf PDF
Attachment 13 - LEED v4 for BDplusC New Construction.pdf PDF
Attachment 11 - Site Visit Pictures 27 May 2026.pdf PDF
Attachment 03 Addendum 1 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT BidFinal 17 June 2026.pdf PDF
W912LR26BA0020004 SF 30 - Amendment 04 20260617.pdf PDF
Attachment 01 Addendum 1 DRAWINGS C-121 to C-122 Dated 17 June 2026.pdf PDF
Attachment 02 Addendum 1 PRARNG EHMS Camp Santiago SPECIFICATIONS 100 BidFinal 17 June 2026.pdf PDF
W912LR26BA002 EHMS-DPW - RFI Responses 17 June 2026.pdf PDF
W912LR26BA0020003 SF 30 - Amendment 03 20260608.pdf.pdf PDF
W912LR26BA002 PreBid Conf Signing Roster 20260527.pdf PDF
W912LR26BA002 PreBid Conference Site Visit 20260527.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 02 20260528.pdf PDF
W912LR26BA0020001 SF 30 - Amendment 01 20260521.pdf PDF
Attachment 05 - LBP Inspection Reports DPW EHMS.pdf PDF
Attachment 03 PRARNG EHMS Camp Santiago FURNITURE FIXTURES AND EQUIPMENT Bid Final 06 March 2026.pdf PDF
Attachment 08 - PRARNG Master Plan EA Final Feb 2021.pdf PDF
Attachment 04 - Asbesto Reports DPW Buildings.pdf PDF
Attachment 02 PRARNG EHMS Camp Santiago SPECIFICATIONS ALL VOLUMES.pdf PDF
Attachment 09 - Municipality of Salinas - Const Tax Exemption.pdf PDF
Attachment 10 - Geotechnical Report 20 July 2021.pdf PDF
Solicitation - SF 1442 W912LR26BA002 IFB.pdf PDF
Attachment 06 - Environmental Considerations-PCL Legal Translate Final.pdf PDF
Attachment 01 PRARNG EHMS Camp Santiago DRAWINGS Final 06 March 2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL

FINDING OF NO SIGNIFICANT IMPACT

APPROVAL OF THE REAL PROPERTY MASTER PLAN FOR CAMP SANTIAGO JOINT TRAINING

CENTER AND FORT ALLEN TRAINING CENTER AND IMPLEMENTATION OF NEAR-TERM

INFRASTRUCTURE PROJECTS AT CAMP SANTIAGO JOINT TRAINING CENTER

SALINAS AND JUANA DIAZ, PUERTO RICO

1. Introduction The Puerto Rico Army National Guard (PRARNG) prepared a Real Property Master Plan (RPMP) for Camp Santiago Joint Training Center (CSJTC) and Fort Allen Training Center (FATC), located in southern Puerto Rico, consistent with the requirements of the Department of Defense (DoD) Unified Facilities Criteria (UFC) 2-100-01, Installation Master Planning, which provides guidance for developing RPMPs for DoD installations. In December 2015, the ARNG Environmental Programs Division issued a memorandum to the ARNG Construction and Facility Management Officers that outlined the requirements for preparation of UFC 2100-01-compliant RPMPs for 48 training installations; the ARNG G-9 includes CSJTC and FATC combined as one of the 48 installations. The ARNG is required to prepare an Environmental Assessment (EA) for each of its 48 UFC 2-100-01-compliant RPMPs per the April 26, 2019 Department of the Army memorandum entitled Interim Guidance for National Environmental Policy Act (NEPA) Compliance for Real Property Master Plans (RPMPs).

The PRARNG prepared an EA to analyze the potential environmental impacts of approving the UFC 2-100- 01-compliant RPMP prepared for CSJTC and FATC and implementing near-term infrastructure projects at CSJTC. The EA has been prepared in accordance with the National Environmental Policy Act of 1969 (NEPA) (42 United States Code 4321 et seq.), the Council on Environmental Quality (CEQ) Regulations Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] Parts 1500-1508), and 32 CFR Part 651 (Environmental Analysis of Army Actions, Final Rule).

2. Description of the Proposed Action and Alternatives

Proposed Action The Proposed Action consists of the following two components:

1. Approval of the PRARNG’s UFC 2-100-01-compliant RPMP developed for CSJTC and FATC, and

2. Implementation of specific near-term infrastructure projects at CSJTC.

The first component of the Proposed Action is the approval of the UFC 2-100-01-compliant RPMP developed for CSJTC and FATC. By memorandum dated August 22, 2019, the ARNG Installations and Environment Directorate (ARNG G-9) determined that this PRARNG plan includes all UFC 2-100-01 RPMP required elements. A copy of this memorandum is provided in Appendix A of the EA. The real property asset requirements of the installations identified in the RPMP are based on the authorizations for a Level III Training Center; criteria in NG PAM 415-12, Army National Guard Facilities Allowances; and stakeholder input. In addition to the standardized criteria and requirements for ARNG real property assets, real property asset shortfalls and damage from Hurricane Maria in 2017 at both installations were key issues that drove planning decisions during development of the RPMP. Sources of funding for the infrastructure projects proposed at the installations include Military Construction (MILCON) funding; Sustainment, Restoration, and Modernization (SRM) funding; and other funding sources. Proposed future development at CSJTC and FATC would involve demolition of buildings and structures destroyed or severely damaged by Hurricane Maria; repair, stabilization, and/or renovation of facilities that are in poor condition; and construction of new facilities. Overall, there would be less redevelopment at FATC than at CSJTC in terms of the number and size of projects that would be conducted over the same 25-year planning period. All proposed development at CSJTC and FATC would occur in or near the cantonment areas of each installation. In general, planning of future development at FATC currently is less definitive and more conceptual relative to CSJTC. For these reasons, specific projects at FATC are not analyzed in detail in the EA; instead the EA analyzes the general types and locations of projects proposed at FATC and the installation is analyzed only under Component Action 1. The PRARNG will prepare a separate NEPA analysis, either an EA or Record of Environmental Consideration (REC), for specific infrastructure projects at FATC after further planning is conducted and funding is obtained for the projects.

The second component of the Proposed Action is the implementation of several near-term infrastructure projects at CSJTC. The infrastructure projects analyzed in detail in the EA are all currently funded for design and are referred to as Act of Nature (AoN) projects because they have resulted from a natural disaster that could not be prevented; these projects would replace similar infrastructure that was severely damaged or destroyed by Hurricane Maria. The AoN projects at CSJTC that are analyzed in detail include eight projects funded through the MILCON program and six projects funded through the SRM program;

all these projects are identified in the RPMP except for the proposed electric utility microgrid. These projects are planned to be executed during Phase I, which covers the 5-year period from Fiscal Year (FY) 2020 to FY 2024. All proposed new facilities would be designed to last a minimum of 50 years per UFC 2100-01, Installation Master Planning; meet minimum DoD Antiterrorism/Force Protection standards per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings; and withstand Category 5 hurricane wind speeds.

The eight AoN MILCON projects at CSJTC would all involve construction of new facilities in or near the cantonment area; implementation of some of these projects would also include associated demolition.

The following eight MILCON projects would be implemented at CSJTC under the Proposed Action:

1. MILCON Project 430073 – National Guard Readiness Center. This project would involve construction of a new National Guard Readiness Center at CSJTC, which would be a complex of facilities that would provide administrative, training, logistics, and material storage functions, as well as emergency response services during natural disasters. The existing National Guard Readiness Center at CSJTC was severely damaged by Hurricane Maria and is no longer operational.

2. MILCON Project 431846 – Army Aviation Support Facility (AASF). This project would involve construction of a new AASF at CSJTC, which would be complex of facilities that would provide storage, repair, and maintenance of PRARNG helicopters, as well as support training of helicopter pilots. In addition to construction of the proposed new AASF, the Proposed Action analyzed in the EA covers the operations that would be conducted out of the new AASF at CSJTC, including storage, repair, and maintenance of PRARNG helicopters, as well as helicopter flight operations that are conducted out of the new facility. The existing AASF currently located at the Isla Grande Airport in San Juan was severely damaged by Hurricane Maria. Moving the AASF from the Isla Grande Airport will not adversely impact the Puerto Rico Ports Authority because the Ports Authority does not receive any services from the PRARNG. The Ports Authority is aware that the PRARNG proposes to move the AASF from its property and is supportive of the proposal.

3. MILCON Project 431847 – Maneuver Area Training Equipment Site (MATES). This project would involve construction of a new MATES at CSJTC, which would provide maintenance and repair of PRARNG equipment and vehicles. The existing MATES at CSJTC was severely damaged by Hurricane Maria and is no longer operational.

4. MILCON Project 431848 – Transient Training (TT) Enlisted Personnel Barracks and Officer’s Quarters.

This project would involve construction of new TT Enlisted Personnel Barracks and Officer’s Quarters at CSJTC, which would house unaccompanied enlisted personnel and officers, respectively, who are conducting training at the installation. The barracks and officer’s quarters would be located within a complex referred to as the Operational Readiness Training Complex (ORTC) in the RPMP, which would also include the proposed new TT Company Headquarters (HQ) (MILCON Project 431849) and TT Dining Facility (MILCON Project 431852). This project would include multiple billeting facilities (barracks) and pavement for operations and sidewalks. Most of the existing TT facilities at CSJTC, including the TT barracks and officer’s quarters, were damaged beyond repair by Hurricane Maria.

5. MILCON Project 431849 – TT Company Headquarters. This project would involve construction of new TT Company HQ at CSJTC. The Company HQ would be located within the proposed new TT ORTC area, which would also include the proposed new TT Enlisted Personnel Barracks and Officer’s Quarters (MILCON Project 431848) and TT Dining Facility (MILCON Project 431852). Most of the existing TT facilities at CSJTC, including the TT Company HQ, were damaged beyond repair by Hurricane Maria.

6. MILCON Project 431850 – Engineering/Housing Maintenance Shop. This project would involve construction of new Engineering/Housing Maintenance Shop at CSJTC, which would be operated by the Department of Public Works and would support maintenance and repair of facilities and other infrastructure at the installation. The existing Engineering/Housing Maintenance Shop was severely damaged by Hurricane Maria and is no longer operational.

7. MILCON Project 431851 – Microgrid with Power Substation/Switching Station Building. This project would involve construction of a new electric power microgrid system at CSJTC, including a central substation, distribution network, and generation facilities. A microgrid is a small, localized electrical grid that can be operated independently of the larger grid to which it is attached. In the event of an extended outage of the main grid, the microgrid would distribute and regulate the power from solar photovoltaic (PV) arrays, backup batteries, and/or backup diesel generators, and deliver it to the installation to support operation of essential facilities and emergency response operations.

8. MILCON Project 431852 – TT Dining Facility. This project would involve construction of a new TT Dining Facility at CSJTC. The TT Dining Facility would be located within the proposed new TT ORTC area, which would also include the proposed new TT Enlisted Personnel Barracks and Officer’s Quarters (MILCON Project 431848) and TT Company HQ (MILCON Project 43189). Most of the existing TT facilities at CSJTC, including the TT dining facility, were damaged beyond repair by Hurricane Maria.

The six AoN SRM projects at CSJTC would all involve improvements to existing infrastructure in or near the cantonment area; implementation of some of these projects would also include associated demolition. The following six SRM project would be implemented at CSJTC under the Proposed Action:

1. SRM Project 431504 – Potable Water Supply System. This project would involve improvements to the existing potable water supply system at CSJTC. Improvements would be made to various components of the potable water system, including but not limited to, wells, pump systems, treatment plant, storage tanks, and associated monitoring and communication systems. Most of the existing potable water infrastructure at CSJTC sustained damage from Hurricane Maria; some of the infrastructure was severely damaged and is no longer operational.

2. SRM Project 431628 – Fire Station Bay Parking. This project would involve replacement of the bay parking structure of the existing Fire Station at CSJTC. The bay parking structure of the existing Fire Station at CSJTC sustained damage from Hurricane Maria but is still intact; however, the existing structure is undersized and does not meet the needs of the PRARNG at the installation.

3. SRM Project 431632 – Medical Clinic Generator. This project would involve installation of a new electric generator for the existing Medical Clinic at CSJTC. The existing Medical Clinic at CSJTC currently does not have an electric generator.

4. SRM Project 431707 – Dining Facility. This project would involve replacement of the existing Building 404 Dining Facility at CSJTC. The existing Building 404 Dining Facility at CSJTC was severely damaged by Hurricane Maria and is no longer operational.

5. SRM Project 431802 – Billeting Facility. This project would involve replacement of the existing Building 420 Billeting Facility at CSJTC. The existing billeting facility at CSJTC was severely damaged by Hurricane Maria and is no longer operational.

6. SRM Project 431913 – ARMAGTM Container Pad. This project would involve construction of a new concrete pad to support four ARMAGTM containers for the temporary storage of ammunition at CSJTC.

The existing ARMAGTM containers at CSJTC currently do not have concrete pads.

Alternatives Considered The EA considered the following alternatives for Component Action 1:

• Proposed Action Alternative – Approve the CSJTC and FATC RPMP. Under this alternative, the entire RPMP would be approved.

• Alternative 1 – Partially approve the CSJTC and FATC RPMP. Under this alternative, certain components of the RPMP, but not the entire Plan, would be approved.

• No Action Alternative – Do not approve the CSJTC and FATC RPMP. Under this alternative, real property planning and development at the installations may still occur but would not be guided by the current UFC 2-100-01-compliant RPMP.

The EA considered the following alternatives for Component Action 2:

• Proposed Action Alternative – Implement the identified near-term infrastructure projects at CSJTC.

Under this alternative, all the proposed near-term infrastructure projects at the installation would be implemented.

• Alternative 1 – Partially implement the identified near-term infrastructure projects at CSJTC. Under this alternative, some but not all the proposed near-term infrastructure projects at the installation would be implemented.

• No Action Alternative – Do not implement the identified near-term infrastructure projects at CSJTC.

Under this alternative, none of the proposed near-term infrastructure projects at the installation would be implemented.

Based on the analysis conducted, only the Proposed Action Alternative met all the screening criteria used to evaluate alternatives for Component Action 1 and Component Action 2. Alternative 1 would not fully meet the purpose of or need for the Proposed Action, or any of the screening criteria used to evaluate alternatives; therefore, this alternative was determined to not be reasonable and was eliminated from detailed analysis in the EA. The No Action Alternative would not meet the purpose of or need for the Proposed Action, or any of the screening criteria used to evaluate alternatives. While the No Action Alternative would not satisfy the purpose of or need for the Proposed Action, this alternative was retained to provide a comparative baseline against which to analyze the effects of the Proposed Action, as required under the CEQ Regulations (40 CFR §1502.14).

3. Environmental Analysis The potential environmental impacts associated with the Proposed Action are described in the EA. The EA identifies the environmental resources that could be affected by the Proposed Action, and determines the significance of the impacts, if any, to each of those resources. Based on the findings of the EA, the Proposed Action would have no appreciable effect on geology or cultural resources. In a letter dated October 19, 2020, the Puerto Rico State Historic Preservation Office concurred with the PRARNG’s determination of “no historic properties affected” for the Proposed Action. The Proposed Action would have less-than-significant adverse impacts on air quality, noise, topography, soils, water resources, biological resources, and hazardous and toxic materials/wastes. In a letter dated August 24, 2020, the United States Fish and Wildlife Service concurred with the PRARNG’s determination that the Proposed Action would have no effect on the Puerto Rican boa, Woodbury’s stopper, St. Thomas prickly-ash, or cobana negra, and that the Proposed Action may affect, but is not likely to adversely affect, the Puerto Rican nightjar. The potential adverse impacts on these resources would be further reduced via implementation of the best management practices (BMPs) and other measures identified in the EA. The Proposed Action would have beneficial impacts on visual quality, land use, socioeconomics, utilities, and transportation. The Proposed Action would not result in disproportionate environmental health or safety risks to children, and it would not disproportionately impact minority or low-income populations. When added to past, present, and reasonably foreseeable actions, the Proposed Action is not expected to have significantly adverse cumulative impacts on any resource.

4. Mitigation No mitigation measures are required under the Proposed Action to reduce adverse impacts to below significant levels for any resource analyzed in the EA. The measures identified in the EA to minimize potential impacts associated with the Proposed Action include BMPs and required regulatory permits and actions necessary to maintain compliance with applicable laws, policies, and plans.

5. Regulations The Proposed Action will not violate NEPA, the CEQ Regulations, 32 CFR 651, or other federal, state, or local environmental regulations.

6. Public Review and Comment A Notice of Availability published in the El Neuvo Dia newspaper on December 3, 2020 announced the 15 day availability of the Final EA and Draft Finding of No Significant Impact (FNSI) for public review and comment. Copies of the documents were made available at CSJTC and on the PRARNG website during the public review period. The PRARNG received comments from one commenter, Comite Dialogo Ambiental, Inc., during the public comment period. The commenter did not identify any major errors or omissions in the EA or significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. Therefore, supplementing the EA is not required. The received comments and PRARNG’s responses to the comments are attached.

7. Finding of No Significant Impact After careful review of the EA, I have concluded that implementation of the Proposed Action will not generate significant controversy or have a significant impact on the quality of the human or natural environment. This analysis fulfills the requirements of NEPA, the CEQ implementing regulations, and the Army implementing regulations. An Environmental Impact Statement will not be prepared, and the National Guard Bureau is issuing this Finding of No Significant Impact.

Date Anthony Hammett

Colonel, U.S. Army Chief, G-9 Army National Guard

26 February 2021

FINAL
1. Introduction
2. Description of the Proposed Action and Alternatives
Proposed Action
1. MILCON Project 430073 – National Guard Readiness Center. This project would involve construction of a new National Guard Readiness Center at CSJTC, which would be a complex of facilities that would provide administrative, training, logistics, and m...
2. MILCON Project 431846 – Army Aviation Support Facility (AASF). This project would involve construction of a new AASF at CSJTC, which would be complex of facilities that would provide storage, repair, and maintenance of PRARNG helicopters, as well a...
3. MILCON Project 431847 – Maneuver Area Training Equipment Site (MATES). This project would involve construction of a new MATES at CSJTC, which would provide maintenance and repair of PRARNG equipment and vehicles. The existing MATES at CSJTC was sev...
4. MILCON Project 431848 – Transient Training (TT) Enlisted Personnel Barracks and Officer’s Quarters. This project would involve construction of new TT Enlisted Personnel Barracks and Officer’s Quarters at CSJTC, which would house unaccompanied enlis...
5. MILCON Project 431849 – TT Company Headquarters. This project would involve construction of new TT Company HQ at CSJTC. The Company HQ would be located within the proposed new TT ORTC area, which would also include the proposed new TT Enlisted Pers...
6. MILCON Project 431850 – Engineering/Housing Maintenance Shop. This project would involve construction of new Engineering/Housing Maintenance Shop at CSJTC, which would be operated by the Department of Public Works and would support maintenance and ...
7. MILCON Project 431851 – Microgrid with Power Substation/Switching Station Building. This project would involve construction of a new electric power microgrid system at CSJTC, including a central substation, distribution network, and generation faci...
8. MILCON Project 431852 – TT Dining Facility. This project would involve construction of a new TT Dining Facility at CSJTC. The TT Dining Facility would be located within the proposed new TT ORTC area, which would also include the proposed new TT Enl...
1. SRM Project 431504 – Potable Water Supply System. This project would involve improvements to the existing potable water supply system at CSJTC. Improvements would be made to various components of the potable water system, including but not limited ...
2. SRM Project 431628 – Fire Station Bay Parking. This project would involve replacement of the bay parking structure of the existing Fire Station at CSJTC. The bay parking structure of the existing Fire Station at CSJTC sustained damage from Hurrican...
3. SRM Project 431632 – Medical Clinic Generator. This project would involve installation of a new electric generator for the existing Medical Clinic at CSJTC. The existing Medical Clinic at CSJTC currently does not have an electric generator.
4. SRM Project 431707 – Dining Facility. This project would involve replacement of the existing Building 404 Dining Facility at CSJTC. The existing Building 404 Dining Facility at CSJTC was severely damaged by Hurricane Maria and is no longer operatio...
5. SRM Project 431802 – Billeting Facility. This project would involve replacement of the existing Building 420 Billeting Facility at CSJTC. The existing billeting facility at CSJTC was severely damaged by Hurricane Maria and is no longer operational.
6. SRM Project 431913 – ARMAGTM Container Pad. This project would involve construction of a new concrete pad to support four ARMAGTM containers for the temporary storage of ammunition at CSJTC. The existing ARMAGTM containers at CSJTC currently do not...

Alternatives Considered

3. Environmental Analysis
4. Mitigation
5. Regulations
6. Public Review and Comment
7. Finding of No Significant Impact
2021-02-26T16:52:27-0500
HAMMETT.ANTHONY.SCOTT.1116575562

File details come from the government source that posted it. Updated .