32 01 16.17.pdf

PDF 16 KB Posted

Attached to
Repair Military Taxiway located at the Portland Air National Guard Base, Portland, Oregon
Solicitation number
W912JV-09-R-0008
Issued by

About this file

COLD MILLING OF BITUMINOUS PAVEMENTS

View the file

Other files

File Type Posted
P-153.pdf PDF
014-C-061.pdf PDF
01500.pdf PDF
261200r.pdf PDF
024-C-652.pdf PDF
018-C-204.pdf PDF
L-110.pdf PDF
003-G-021.pdf PDF
031-E-401.pdf PDF
033-E-602.pdf PDF
015-C-201.pdf PDF
P-406.pdf PDF
01420.pdf PDF
P-610.pdf PDF
013-C-055.pdf PDF
027-E-001.pdf PDF
011-C-053.pdf PDF
01310.pdf PDF
01350.pdf PDF
006-G-083.pdf PDF
004-G-081.pdf PDF
007-C-021.pdf PDF
010-C-052.pdf PDF
01320.pdf PDF
005-G-082.pdf PDF
L-109.pdf PDF
32 12 15.pdf PDF
022-C-301.pdf PDF
002-G-002.pdf PDF
01340.pdf PDF
021-C-211.pdf PDF
32 92 19.pdf PDF
009-C-051.pdf PDF
01700.pdf PDF
019-C-205.pdf PDF
01782.pdf PDF
01781.pdf PDF
017-C-203.pdf PDF
020-C-206.pdf PDF
025-C-653.pdf PDF
32 05 33.pdf PDF
026-C-671.pdf PDF
001-G-001.pdf PDF
01330.pdf PDF
32 17 24.00 10.pdf PDF
32 12 10.pdf PDF
030-E-203.pdf PDF
01162.pdf PDF
L-108.pdf PDF
SpecCover_TOC.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 01 16 Page 1

SECTION 32 01 16.17

COLD MILLING OF BITUMINOUS PAVEMENTS

08/08

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 136 (2006) Standard Test Method for Sieve

Analysis of Fine and Coarse Aggregates

1.2 SYSTEM DESCRIPTION

Maintain in a satisfactory working condition equipment, tools, and machines used in the performance of the work.

1.3.1 Cold-Milling Machine

Provide a cold-milling machine which is self-propelled, capable of milling the pavement to a specified depth and smoothness and of establishing grade control; with means of controlling transverse slope and dust produced during the pavement milling operation. The machine shall have the ability to remove the millings or cuttings from the pavement and load them into a truck. The milling machine shall not cause damage to any part of the pavement structure that is not to be removed.

1.3.2 Cleaning Equipment

Provide cleaning equipment suitable for removing and cleaning loose material from the pavement surface. The cleaning equipment shall include a vacuum sweeper, Tennant Co. Sentinel or 6600 Model or approved equivalent.

1.3.3 Straightedge

Furnish and maintain at the site, in good condition, one 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Make straightedge available for Government use.

Straightedges shall be constructed of aluminum or other lightweight metal, with blades of box or box-girder cross section with flat bottom reinforced to insure rigidity and accuracy. Straightedges shall have handles to facilitate movement on the pavement.

1.4 QUALITY ASSURANCE

1.4.1 Grade

Conform the finished milled surfaces to the lines, grades, and cross sections indicated. The finished milled-pavement surfaces shall vary not more than 1/4 inch from the established plan grade line and elevation.

SECTION 32 01 16 Page 2

Finished surfaces at a juncture with other pavements shall coincide with the finished surfaces of the abutting pavements. The deviations from the plan grade line and elevation will not be permitted in areas of pavements where closer conformance with planned grade and elevation is required for the proper functioning of appurtenant structures involved.

1.4.2 Surface Smoothness

Finished surfaces shall not deviate from the testing edge of a straightedge more than 1/4 inch in the transverse or longitudinal direction.

1.4.3 Traffic Control

Provide all necessary traffic controls during milling operations.

1.5 ENVIRONMENTAL REQUIREMENTS

Milling shall not be performed when there is accumulation of snow or ice on the pavement surface.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 PREPARATION OF SURFACE

Clean the pavement surface of excessive dirt, clay, or other foreign material immediately prior to milling the pavement.

3.2 MILLING OPERATION

A minimum of seven days notice is required, prior to start work, for the

Contracting Officer to coordinate the milling operation with other activities at the site. Contractor shall mill and vacuum sweep a 2,500 square-foot trial section. Trial section milling and vacuum sweeping operations shall be approved by COR before proceeding with milling operations. Make sufficient passes so that the designated area is milled to the grades and cross sections indicated. The milling shall proceed with care and in depth increments that will not damage the pavement below the designated finished grade. Repair or replace, as directed, items damaged during milling such as manholes, valve boxes, utility lines, pavement that is torn, cracked, gouged, broken, or undercut. The milled material shall be removed from the pavement and loaded into trucks.

3.3 GRADE AND SURFACE-SMOOTHNESS TESTING

3.3.1 Grade-Conformance Tests

Test the finished milled surface of the pavement for conformance with the plan-grade requirements and for acceptance by the Contracting Officer by running lines of levels at intervals of 25 feet longitudinally and 25 feet transversely to determine the elevation of the completed pavement. Correct variations from the designated grade line and elevation in excess of the plan-grade requirements as directed. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area. Remove sufficient material to allow at least 1.5 inch of asphalt concrete to be placed.

SECTION 32 01 16 Page 3

3.3.2 Surface-Smoothness Tests

After completion of the final milling, the finished milled surface will be tested by the Government with a straightedge. Other approved devices may be used, provided that when satisfactorily and properly operated, such devices reveal all surface irregularities exceeding the tolerances specified.

Correct surface irregularities that depart from the testing edge by more than 1/4 inch. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area. Remove sufficient material to allow at least 1.5 inch of asphalt concrete to be placed.

3.4 REMOVAL OF MILLED MATERIAL

Material that is removed shall become the property of the Contractor and removed from the site.

-- End of Section --

File details come from the government source that posted it. Updated .