HOT-MIX ASPHALT (HMA) FOR AIRFIELDS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-153.pdf | ||
| 014-C-061.pdf | ||
| 01500.pdf | ||
| 261200r.pdf | ||
| 024-C-652.pdf | ||
| 018-C-204.pdf | ||
| L-110.pdf | ||
| 003-G-021.pdf | ||
| 031-E-401.pdf | ||
| 033-E-602.pdf | ||
| 015-C-201.pdf | ||
| P-406.pdf | ||
| 01420.pdf | ||
| P-610.pdf | ||
| 013-C-055.pdf | ||
| 027-E-001.pdf | ||
| 011-C-053.pdf | ||
| 01310.pdf | ||
| 01350.pdf | ||
| 006-G-083.pdf | ||
| 004-G-081.pdf | ||
| 007-C-021.pdf | ||
| 010-C-052.pdf | ||
| 01320.pdf | ||
| 005-G-082.pdf | ||
| L-109.pdf | ||
| 022-C-301.pdf | ||
| 002-G-002.pdf | ||
| 01340.pdf | ||
| 021-C-211.pdf | ||
| 32 92 19.pdf | ||
| 009-C-051.pdf | ||
| 01700.pdf | ||
| 019-C-205.pdf | ||
| 01782.pdf | ||
| 01781.pdf | ||
| 017-C-203.pdf | ||
| 020-C-206.pdf | ||
| 025-C-653.pdf | ||
| 32 05 33.pdf | ||
| 026-C-671.pdf | ||
| 001-G-001.pdf | ||
| 01330.pdf | ||
| 32 17 24.00 10.pdf | ||
| 32 12 10.pdf | ||
| 030-E-203.pdf | ||
| 01162.pdf | ||
| L-108.pdf | ||
| SpecCover_TOC.pdf | ||
| 01600.pdf |
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 12 15 Page 1
SECTION 32 12 15
HOT-MIX ASPHALT (HMA) FOR AIRFIELDS
04/08
PART 1 GENERAL
1.1 FULL PAYMENT
1.1.1 Method of Measurement
The amount paid for will be the number of tons of hot-mix asphalt mixture used in the accepted work. Hot-mix asphalt mixture shall be weighed after mixing, and no separate payment will be made for weight of asphalt cement material incorporated herein.
1.1.2 Basis of Payment
Quantities of hot-mix asphalt, determined as specified above, will be paid for at respective contract unit prices or at reduced prices adjusted in accordance with paragraphs PERCENT PAYMENT and QUALITY ASSURANCE. Payment will constitute full compensation for furnishing all materials, equipment, plant, and tools; and for all labor and other incidentals necessary to complete work required by this section of the specification.
1.2 PERCENT PAYMENT
When a lot of material fails to meet the specification requirements for 100 percent pay as outlined in the following paragraphs, that lot shall be removed and replaced, or accepted at a reduced price which will be computed by multiplying the unit price by the lot's pay factor. The lot pay factor is determined by taking the lowest computed pay factor based on either laboratory air voids, in-place density, grade or smoothness (each discussed below). Pay factors based on different criteria (i.e., laboratory air voids and in-place density) of the same lot will not be multiplied together to get a lower lot pay factor. At the end of the project, an average of all lot pay factors will be calculated. If this average lot pay factor exceeds 95.0 percent and no individual lot has a pay factor less than 75.1 percent, then the percent payment for the entire project will be 100 percent of the unit bid price. If the average lot pay factor is less than 95.0 percent, then each lot will be paid for at the unit price multiplied by the lot's pay factor. For any lots which are less than 2000 tons, a weighted lot pay factor will be used to calculate the average lot pay factor.
1.2.1 Mat and Joint Densities
The average in-place mat and joint densities are expressed as a percentage of the average TMD for the lot. The average TMD for each lot will be determined as the average TMD of the two random samples per lot. The average in-place mat density and joint density for a lot are determined and compared with Table 1 to calculate a single pay factor per lot based on in-place density, as described below. First, a pay factor for both mat density and joint density are determined from Table 1. The area associated with the joint is then determined and will be considered to be 10 feet wide times the length of completed longitudinal construction joint in the lot. This area will not exceed the total lot size. The length of joint to be considered
32 12 15 Page 2 will be that length where a new lane has been placed against an adjacent lane of hot-mix asphalt pavement, either an adjacent freshly paved lane or one paved at any time previously. The area associated with the joint is expressed as a percentage of the total lot area. A weighted pay factor for the joint is determined based on this percentage (see example below). The pay factor for mat density and the weighted pay factor for joint density is compared and the lowest selected. This selected pay factor is the pay factor based on density for the lot. When the TMD on both sides of a longitudinal joint is different, the average of these two TMD will be used as the TMD needed to calculate the percent joint density. Rejected lots shall be removed and replaced. Rejected areas adjacent to longitudinal joints shall be removed 4 inches into the cold (existing) lane. All density results for a lot will be completed and reported within 24 hours after the construction of that lot.
Table 1. Pay Factor Based on In-place Density
Average Mat Density Average Joint Density
(4 Cores) Pay Factor, % (4 Cores)
94.0 - 96.0 100.0 Above 92.5
93.9 100.0 92.4
93.8 or 96.1 99.9 92.3
93.7 99.8 92.2
93.6 or 96.2 99.6 92.1
93.5 99.4 92.0
93.4 or 96.3 99.1 91.9
93.3 98.7 91.8
93.2 or 96.4 98.3 91.7
93.1 97.8 91.6
93.0 or 96.5 97.3 91.5
92.9 96.3 91.4
92.8 or 96.6 94.1 91.3
92.7 92.2 91.2
92.6 or 96.7 90.3 91.1
92.5 87.9 91.0
92.4 or 96.8 85.7 90.9
92.3 83.3 90.8
92.2 or 96.9 80.6 90.7
92.1 78.0 90.6
92.0 or 97.0 75.0 90.5 below 92.0, above 97.0 0.0 (reject) below 90.5
1.2.2 Pay Factor Based on In-place Density
An example of the computation of a pay factor (in I-P units only) based on in-place density, is as follows: Assume the following test results for field density made on the lot: (1) Average mat density = 93.2 percent (of lab TMD). (2) Average joint density = 91.5 percent (of lab TMD). (3) Total area of lot = 30,000 square feet. (4) Length of completed longitudinal construction joint = 2000 feet.
a. Step 1: Determine pay factor based on mat density and on joint density, using Table 1:
Mat density of 93.2 percent = 98.3 pay factor.
32 12 15 Page 3
Joint density of 91.5 percent = 97.3 pay factor.
b. Step 2: Determine ratio of joint area (length of longitudinal joint x 10 ft) to mat area (total paved area in the lot): Multiply the length of completed longitudinal construction joint by the specified 10
ft. width and divide by the mat area (total paved area in the lot).
(2000 ft. x 10 ft.)/30000 sq.ft. = 0.6667 ratio of joint area to mat area (ratio).
c. Step 3: Weighted pay factor (wpf) for joint is determined as indicated below:
wpf = joint pay factor + (100 - joint pay factor) (1 - ratio) wpf =
97.3 + (100-97.3) (1-.6667) = 98.2%
d. Step 4: Compare weighted pay factor for joint density to pay factor for mat density and select the smaller:
Pay factor for mat density: 98.3%. Weighted pay factor for joint density: 98.2%
Select the smaller of the two values as pay factor based on density: 98.2%
1.2.3 Payment Adjustment for Smoothness
a. Straightedge Testing. Location and deviation from straightedge for all measurements shall be recorded. When between 5.0 and 10.0 percent of all measurements made within a lot exceed the tolerance specified in paragraph Smoothness Requirements below, after any reduction of high spots or removal and replacement, the computed pay factor for that lot based on surface smoothness, will be 95 percent. When more than 10.0 percent of all measurements exceed the tolerance, the computed pay factor will be 90 percent. When between 15.0 and 20.0 percent of all measurements exceed the tolerance, the computed pay factor will be 75 percent. When 20.0 percent or more of the measurements exceed the tolerance, the lot shall be removed and replaced at no additional cost to the GovernmentOwner. Regardless of the above, any small individual area with surface deviation which exceeds the tolerance given above by more than 50 percent, shall be corrected by diamond grinding to meet the specification requirements above or shall be removed and replaced at no additional cost to the GovernmentOwner.
1.2.4 Laboratory Air Voids and Theoretical Maximum Density
Laboratory air voids will be calculated in accordance with ASTM D 3203 by determining the Marshall density of each lab compacted specimen using the laboratory-prepared, thoroughly dry method in ASTM D 2726 and determining the theoretical maximum density (TMD) of every other sublot sample using
ASTM D 2041. Laboratory air void calculations for each sublot will use the latest theoretical maximum density values obtained, either for that sublot or the previous sublot. The mean absolute deviation of the four laboratory air void contents (one from each sublot) from the JMF air void content will be evaluated and a pay factor determined from Table 2. All laboratory air void tests will be completed and reported within 24 hours after completion
32 12 15 Page 4 of construction of each lot. The TMD is also used for computation of compaction, as required in paragraph: Mat and Joint Densities above.
1.2.5 Mean Absolute Deviation
An example of the computation of mean absolute deviation for laboratory air voids is as follows: Assume that the laboratory air voids are determined from 4 random samples of a lot (where 3 specimens were compacted from each sample). The average laboratory air voids for each sublot sample are determined to be 3.5, 3.0, 4.0, and 3.7. Assume that the target air voids from the JMF is 4.0. The mean absolute deviation is then:
Mean Absolute Deviation = (|3.5 - 4.0| + |3.0 - 4.0| + |4.0 - 4.0| + |3.7 -
4.0|)/4
= (0.5 + 1.0 + 0.0 + 0.3)/4 = (1.8)/4 = 0.45
The mean absolute deviation for laboratory air voids is determined to be
0.45. It can be seen from Table 2 that the lot's pay factor based on laboratory air voids, is 100 percent.
Table 2. Pay Factor Based on Laboratory Air Voids
Mean Absolute Deviation of Lab Air Voids from JMF Pay Factor, %
0.60 or less 100
0.61 - 0.80 98
0.81 - 1.00 95
1.01 - 1.20 90
Above 1.20 reject (0)
1.2.6 Pay Adjustment Based on Grade
Within 5 working days after completion of a particular lot incorporating the final wearing course, test the final wearing surface of the pavement for conformance with specified plan grade requirements. All testing shall be performed in the presence of the COR. The final wearing surface of pavement shall conform to the elevations and cross sections shown and shall vary not more than 0.03 foot for runways or 0.05 foot for taxiways and aprons from the plan grade established and approved at site of work. Finished surfaces at juncture with other pavements shall coincide with finished surfaces of abutting pavements. Deviation from the plan elevation will not be permitted in areas of pavements where closer conformance with planned elevation is required for the proper functioning of drainage and other appurtenant structures involved. The grade will be determined by running lines of levels at intervals of 25 feet, or less, longitudinally and transversely, to determine the elevation of the completed pavement surface. Detailed notes of the results of the testing shall be kept and a copy furnished to the COR immediately after each day's testing. When more than 5 percent of all measurements made within a lot are outside the 0.03 or 0.05 foot tolerance, the pay factor based on grade for that lot will be 95 percent. In areas where the grade exceeds the tolerance by more than 50 percent, remove the surface lift full depth; and replace the lift with hot-mix asphalt to meet specification requirements, at no additional cost to the GovernmentOwner.
Diamond grinding may be used to remove high spots to meet grade requirements. Skin patching for correcting low areas or planing or milling for correcting high areas will not be permitted.
32 12 15 Page 5
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 320 (2005) Performance-Graded Asphalt Binder
AASHTO T 308 (2008) Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition
Method
ASPHALT INSTITUTE (AI)
AI MS-02 (6th Edition; 1997) Mix Design Methods for
Asphalt
ASTM INTERNATIONAL (ASTM)
ASTM C 117 (2004) Standard Test Method for Materials
Finer than 75-um (No. 200) Sieve in Mineral
Aggregates by Washing
ASTM C 1252 (2006) Standard Test Methods for Uncompacted
Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and
Grading)
ASTM C 127 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Coarse Aggregate
ASTM C 128 (2007a) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Fine Aggregate
ASTM C 131 (2006)Standard Test Method for Resistance to
Degradation of Small-Size Coarse Aggregate by
Abrasion and Impact in the Los Angeles
Machine
ASTM C 136 (2006) Standard Test Method for Sieve
Analysis of Fine and Coarse Aggregates
ASTM C 142 (1997; R 2004) Standard Test Method for Clay
Lumps and Friable Particles in Aggregates
ASTM C 29/C 29M (2007) Standard Test Method for Bulk Density
("Unit Weight") and Voids in Aggregate
ASTM C 566 (1997; R 2004) Standard Test Method for Total
Evaporable Moisture Content of Aggregate by
Drying
32 12 15 Page 6
ASTM C 88 (2005) Standard Test Method for Soundness of
Aggregates by Use of Sodium Sulfate or
Magnesium Sulfate
ASTM D 140 (2001; R 2007) Sampling Bituminous Materials
ASTM D 1461 (1985; R 2006) Moisture or Volatile
Distillates in Bituminous Paving Mixtures
ASTM D 2041 (2003a) Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures
ASTM D 2172 (2005) Quantitative Extraction of Bitumen from Bituminous Paving Mixtures
ASTM D 2419 (2002) Sand Equivalent Value of Soils and
Fine Aggregate
ASTM D 242 (2004) Mineral Filler for Bituminous Paving
Mixtures
ASTM D 2489 (2002) Estimating Degree of Particle Coating of Bituminous-Aggregate Mixtures
ASTM D 2726 (2008) Bulk Specific Gravity and Density of
Non-Absorptive Compacted Bituminous Mixtures
ASTM D 3203 (2005) Percent Air Voids in Compacted Dense and Open Bituminous Paving Mixtures
ASTM D 3381 (2005) Viscosity-Graded Asphalt Cement for
Use in Pavement Construction
ASTM D 3665 (2007) Random Sampling of Construction
Materials
ASTM D 3666 (2007e1) Minimum Requirements for Agencies
Testing and Inspecting Road and Paving
Materials
ASTM D 4125 (2005) Asphalt Content of Bituminous Mixtures by the Nuclear Method
ASTM D 4791 (2005e1) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse
Aggregate
ASTM D 4867/D 4867M (2004) Effect of Moisture on Asphalt Concrete
Paving Mixtures
ASTM D 5444 (2005) Mechanical Size Analysis of Extracted
Aggregate
ASTM D 6307 (2005) Asphalt Content of Hot Mix Asphalt by
Ignition Method
ASTM D 6926 (2004) Preparation of Bituminous Specimens
Using Marshall Apparatus
32 12 15 Page 7
ASTM D 6927 (2006) Standard Test Method for Marshall
Stability and Flow of Bituminous Mixtures
ASTM D 979 (2001; R 2006e1) Sampling Bituminous Paving
Mixtures
ASTM D 995 (1995b; R 2002) Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 171 (1994) Standard Test Method for Determining
Percentage of Crushed Particles in Aggregate
1.4 SYSTEM DESCRIPTION
Perform the work consisting of pavement courses composed of mineral aggregate and asphalt material heated and mixed in a central mixing plant and placed on a prepared course. HMA designed and constructed in accordance with this section shall conform to the lines, grades, thicknesses, and typical cross sections shown on the drawings. Construct each course to the depth, section, or elevation required by the drawings and rolled, finished, and approved before the placement of the next course. Submit a Placement
Plan as specified in the Submittals paragraph.
1.4.1 Asphalt Mixing Plant
Plants used for the preparation of hot-mix asphalt shall conform to the requirements of ASTM D 995 with the following changes:
a. Truck Scales. Weigh the asphalt mixture on approved scales furnished by the Contractor, or on certified public scales at the
Contractor's expense. Scales shall be inspected and sealed at least annually by an approved calibration laboratory.
b. Testing Facilities. Provide laboratory facilities at the plant for the use of the Government's Engineer's acceptance testing and the
Contractor's quality control testing.
c. Inspection of Plant. The COR shall have access at all times, to all areas of the plant for checking adequacy of equipment; inspecting operation of the plant; verifying weights, proportions, and material properties; checking the temperatures maintained in the preparation of the mixtures and for taking samples. Provide assistance as requested, for the COR to procure any desired samples.
d. Storage Bins. The asphalt mixture may be stored in non-insulated storage bins for a period of time not exceeding 3 hours. The asphalt mixture may be stored in insulated storage bins for a period of time not exceeding 8 hours. The mix drawn from bins shall meet the same requirements as mix loaded directly into trucks.
1.4.2 Hauling Equipment
Trucks used for hauling hot-mix asphalt shall have tight, clean, and smooth metal beds. To prevent the mixture from adhering to them, the truck beds
32 12 15 Page 8 shall be lightly coated with a minimum amount of paraffin oil, lime solution, or other approved material. Petroleum based products shall not be used as a release agent. Each truck shall have a suitable cover to protect the mixture from adverse weather. When necessary to ensure that the mixture will be delivered to the site at the specified temperature, truck beds shall be insulated or heated and covers (tarps) shall be securely fastened.
1.4.3 Material Transfer Vehicle (MTV)
Material transfer Vehicles shall be required due to the improvement in smoothness and decrease in both physical and thermal segregation. To transfer the material from the hauling equipment to the paver, use a self-propelled, material transfer vehicle that can deliver material to the paver without making contact with the paver. The MTV shall be able to move back and forth between the hauling equipment and the paver providing material transfer to the paver, while allowing the paver to operate at a constant speed. The Material Transfer Vehicle will have remixing and storage capability to prevent physical and thermal segregation.
1.4.4 Asphalt Pavers
Mechanical spreading and finishing equipment shall consist of a self-powered paver, capable of spreading and finishing the mixture to the specified line, grade, and cross section. The screed of the paver shall be capable of laying a uniform mixture to meet the specified thickness, smoothness, and grade without physical or temperature segregation, the full width of the material being placed. The screed will be equipped with a compaction device and it will be used during all placement.
1.4.4.1 Receiving Hopper
The paver shall have a receiving hopper of sufficient capacity to permit a uniform spreading operation. The hopper shall be equipped with a distribution system to place the mixture uniformly in front of the screed without segregation. The screed shall effectively produce a finished surface of the required evenness and texture without tearing, shoving, or gouging the mixture.
1.4.4.2 Automatic Grade Controls
If an automatic grade control device is used, the paver shall be equipped with a control system capable of automatically maintaining the specified screed elevation. The control system shall be automatically actuated from either a reference line and/or through a system of mechanical sensors or sensor-directed mechanisms or devices which will maintain the paver screed at a predetermined transverse slope and at the proper elevation to obtain the required surface. The transverse slope controller shall be capable of maintaining the screed at the desired slope within plus or minus 0.1 percent. A transverse slope controller shall not be used to control grade.
The controls shall be capable of working in conjunction with any of the following attachments:
a. Ski-type device of not less than 30 feet in length.
b. Taut stringline set to grade.
c. Short ski or shoe for joint matching.
32 12 15 Page 9
d. Laser control.
1.4.5 Rollers
Rollers shall be in good condition and shall be operated at slow speeds to avoid displacement of the asphalt mixture. The number, type, and weight of rollers shall be sufficient to compact the mixture to the required density while it is still in a workable condition. Equipment which causes excessive crushing of the aggregate shall not be used.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Placement Plan; G
Proposed placement plan, indicating lane widths, longitudinal joints, and transverse joints for each course or lift.
SD-03 Product Data
Mix Design; G
Proposed JMF.
Contractor Quality Control; G
Quality control plan.
SD-04 Samples
Asphalt Cement Binder
5 gallon sample for mix design verification.
Aggregates
Sufficient materials to produce 200 lb of blended mixture for mix design verification.
SD-06 Test Reports
Aggregates; G
QC Monitoring
Aggregate and QC test results.
SD-07 Certificates
Asphalt Cement Binder; G
Copies of certified test data.
32 12 15 Page 10
Testing Laboratory
Certification of compliance.
1.6 QUALITY ASSURANCE
The Government's Engineer's quality assurance (QA) program for this project is separate and distinct from the Contractor's quality control (QC) program specified in Part 3. Testing for acceptability of work will be performed by the COR or by an independent laboratory hired by the COR, except for grade and smoothness testing which shall be performed by the Contractor.
Acceptance of the plant produced mix and in-place requirements will be on a lot to lot basis. A standard lot for all requirements will be equal to 2000 metric short tons. Where appropriate, adjustment in payment for individual lots of hot-mix asphalt will be made based on in-place density, laboratory air voids, grade and smoothness in accordance with the following paragraphs.
Grade and surface smoothness determinations will be made on the lot as a whole. Exceptions or adjustments to this will be made in situations where the mix within one lot is placed as part of both the intermediate and surface courses, thus grade and smoothness measurements for the entire lot cannot be made. In order to evaluate laboratory air voids and in-place
(field) density, each lot will be divided into four equal sublots.
1.6.1 Sublot Sampling
One random mixture sample for determining laboratory air voids, theoretical maximum density, and for any additional testing the COR desires, will be taken from a loaded truck delivering mixture to each sublot, or other appropriate location for each sublot. All samples will be selected randomly, using commonly recognized methods of assuring randomness conforming to ASTM D 3665 and employing tables of random numbers or computer programs. Laboratory air voids will be determined from three laboratory compacted specimens of each sublot sample in accordance with ASTM D 6926.
The specimens will be compacted within 2 hours of the time the mixture was loaded into trucks at the asphalt plant. Samples will not be reheated prior to compaction and insulated containers will be used as necessary to maintain the temperature.
1.6.2 Additional Sampling and Testing
The COR reserves the right to direct additional samples and tests for any area which appears to deviate from the specification requirements. The cost of any additional testing will be paid for by the GovernmentOwner. Testing in these areas will be treated as a separate lot. Payment will be made for the quantity of HMA represented by these tests in accordance with the provisions of this section.
1.6.3 In-place Density
For determining in-place density, one random core 4 inches or 6 inches in diameter) will be taken by the COR from the mat (interior of the lane) of each sublot, and one random core will be taken from the joint (immediately over joint) of each sublot, in accordance with ASTM D 979. Each random core will be full thickness of the layer being placed. When the random core is less than 1 inch thick, it will not be included in the analysis. In this case, another random core will be taken. After air drying to meet the requirements for laboratory-prepared, thoroughly dry specimens, cores
32 12 15 Page 11 obtained from the mat and from the joints will be used for in-place density determination in accordance with ASTM D 2726.
1.6.4 Surface Smoothness
Use the following methods to test and evaluate surface smoothness of the finished surface of the pavement final grade. All testing shall be performed in the presence of the COR. Detailed notes of the results of the testing shall be kept and a copy furnished to the COR immediately after each day's testing. The profilograph method shall be used for all longitudinal and transverse testing, except where the runs would be less than 200 feet in length and the ends where the straightedge shall be used. Where drawings show required deviations from a plane surface (crowns, drainage inlets, etc.), the surface shall be finished to meet the approval of the COR.
1.6.4.1 Smoothness Requirements
a. Straightedge Testing: The finished surfaces of the pavements shall have no abrupt change of 1/8 inch or more, and all pavements shall be within the tolerances specified in Table 3 when checked with an approved 12 foot straightedge.
Table 3. Straightedge Surface Smoothness--Pavements
Pavement Category Direction of Testing Tolerance, inches
Runways and taxiways Longitudinal 1/8
Transverse 1/4
1.6.4.2 Testing Method
After the final rolling, but not later than 24 hours after placement, the surface of the pavement in each entire lot shall be tested in such a manner as to reveal all surface irregularities exceeding the tolerances specified above. Separate testing of individual sublots is not required. If any pavement areas are diamond ground, these areas shall be retested immediately after grinding. The entire area of the pavement shall be tested in both a longitudinal and a transverse direction on parallel lines. The transverse lines shall be 15 feet or less apart, as directed. The longitudinal lines shall be at the centerline of each paving lane for lines less than 6.1 m( 20 feet) and at the third points for lanes 20 feet or greater. Other areas having obvious deviations shall also be tested. Longitudinal testing lines shall be continuous across all joints.
a. Straightedge Testing. The straightedge shall be held in contact with the surface and moved ahead one-half the length of the straightedge for each successive measurement. The amount of surface irregularity shall be determined by placing the freestanding
(unleveled) straightedge on the pavement surface and allowing it to rest upon the two highest spots covered by its length, and measuring the maximum gap between the straightedge and the pavement surface in the area between these two high points.
b. Bumps ("Must Grind" Areas). Any bumps ("must grind" areas) shown on the profilograph trace which exceed 0.4 inch in height shall be reduced by diamond grinding until they do not exceed 0.3 inch when retested. Such grinding shall be tapered in all directions to provide
32 12 15 Page 12 smooth transitions to areas not requiring grinding. The following will not be permitted: (1) skin patching for correcting low areas, (2) planing or milling for correcting high areas. At the Contractor's option, pavement areas, including ground areas, may be rechecked with the profilograph in order to record a lower Profile Index.
1.7 ENVIRONMENTAL REQUIREMENTS
The hot-mix asphalt shall not be placed upon a wet surface or when the surface temperature of the underlying course is less than specified in Table
5. The temperature requirements may be waived by the COR, if requested;
however, all other requirements, including compaction, shall be met.
Table 5. Surface Temperature Limitations of Underlying Course
Mat Thickness, inches Degrees F
3 or greater 40
Less than 3 45
PART 2 PRODUCTS
2.1 AGGREGATES
Aggregates shall consist of crushed stone, crushed gravel, crushed slag, screenings, natural sand and mineral filler, as required. The portion of material retained on the No. 4 sieve is coarse aggregate. The portion of material passing the No. 4 sieve and retained on the No. 200 sieve is fine aggregate. The portion passing the No. 200 sieve is defined as mineral filler. All aggregate test results and samples shall be submitted to the
COR at least 14 days prior to start of construction. Aggregate testing shall have been performed within 90 days of performing the mix design.
2.1.1 Coarse Aggregate
Coarse aggregate shall consist of sound, tough, durable particles, free from films of material that would prevent thorough coating and bonding with the asphalt material and free from organic matter and other deleterious substances. The coarse aggregate particles shall meet the following requirements:
a. The percentage of loss shall not be greater than 40 percent after
500 revolutions when tested in accordance with ASTM C 131.
b. The sodium sulfate soundness loss shall not exceed 12 percent, or the magnesium sulfate soundness loss shall not exceed 18 percent after five cycles when tested in accordance with ASTM C 88.
c. At least 75 percent by weight of coarse aggregate shall have at least two or more fractured faces when tested in accordance with COE
CRD-C 171. Fractured faces shall be produced by crushing.
d. The particle shape shall be essentially cubical and the aggregate shall not contain more than 20 percent, by weight, of flat and elongated particles (3:1 ratio of maximum to minimum) when tested in accordance with ASTM D 4791.
32 12 15 Page 13
e. Slag shall be air-cooled, blast furnace slag, and shall have a compacted weight of not less than 75 lb/cu ft when tested in accordance with ASTM C
29/C 29M.
f. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C 142.
2.1.2 Fine Aggregate
Fine aggregate shall consist of clean, sound, tough, durable particles. The aggregate particles shall be free from coatings of clay, silt, or any objectionable material and shall contain no clay balls. The fine aggregate particles shall meet the following requirements:
a. The quantity of natural sand (noncrushed material) added to the aggregate blend shall not exceed 15 percent by weight of total aggregate.
b. The individual fine aggregate sources shall have a sand equivalent value greater than 45 when tested in accordance with ASTM D 2419.
c. The fine aggregate portion of the blended aggregate shall have an uncompacted void content greater than 45.0 percent when tested in accordance with ASTM C 1252 Method A.
d. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C 142.
2.1.3 Mineral Filler
Mineral filler shall be nonplastic material meeting the requirements of ASTM
D 242.
2.1.4 Aggregate Gradation
The combined aggregate gradation shall conform to gradations specified in
Table 6, when tested in accordance with ASTM C 136 and ASTM C 117, and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa, but grade uniformly from coarse to fine.
32 12 15 Page 14
Table 6. Aggregate Gradations
Base Course and Trench Patching
Surface Course Material
Percent Passing Percent Passing
Sieve Size, inch by Mass by Mass
1 --- ---
3/4 100 ---
1/2 76-96 100
3/8 69-89 76-96
No. 4 53-73 58-78
No. 8 38-60 40-60
No. 16 26-48 28-48
No. 30 18-38 18-38
No. 50 11-27 11-27
No. 100 6-18 6-18
No. 200 3-6 3-6
2.2 ASPHALT CEMENT BINDER
Asphalt cement binder shall conform to AASHTO M 320 Performance Grade PG 70-
22. Test data indicating grade certification shall be provided by the supplier at the time of delivery of each load to the mix plant. Copies of these certifications shall be submitted to the COR. The supplier is defined as the last source of any modification to the binder. The COR may sample and test the binder at the mix plant at any time before or during mix production. Samples for this verification testing shall be obtained in accordance with ASTM D 140 and in the presence of the COR. These samples shall be furnished to the COR for the verification testing, which shall be at no cost to the Contractor. Samples of the asphalt cement specified shall be submitted for approval not less than 14 days before start of the test section.
2.3 MIX DESIGN
Develop the mix design. The asphalt mix shall be composed of a mixture of well-graded aggregate, mineral filler if required, and asphalt material.
The aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula (JMF). No hot-mix asphalt for payment shall be produced until a JMF has been approved. The hot-mix asphalt shall be designed using hand-held hammer procedures contained in AI MS-02 and the criteria shown in Table 7. Laboratory compaction temperatures for Polymer
Modified Asphalts shall be as recommended by the asphalt cement manufacturer. If the Tensile Strength Ratio (TSR) of the composite mixture, as determined by ASTM D 4867/D 4867M is less than 75, the aggregates shall be rejected or the asphalt mixture treated with an anti-stripping agent.
The amount of anti-stripping agent added shall be sufficient to produce a
TSR of not less than 75. If an antistrip agent is required, it shall be provided at no additional cost to the Government. Sufficient materials to produce 200 pound of blended mixture shall be provided to the COR for verification of mix design at least 14 days prior to construction of test section.
2.3.1 JMF Requirements
32 12 15 Page 15
Submit the job mix formula in writing, for approval, at least 14 days prior to the start of the test section, including as a minimum:
a. Percent passing each sieve size.
b. Percent of asphalt cement.
c. Percent of each aggregate and mineral filler to be used.
d. Asphalt viscosity grade, penetration grade, or performance grade.
e. Number of blows of hammer per side of molded specimen.
f. Laboratory mixing temperature.
g. Lab compaction temperature.
h. Temperature-viscosity relationship of the asphalt cement.
i. Plot of the combined gradation on the 0.45 power gradation chart, stating the nominal maximum size.
j. Graphical plots and summary tabulation of stability, flow, air voids, voids in the mineral aggregate, and unit weight versus asphalt content as shown in AI MS-02. Summary tabulation shall include individual specimen data for each specimen tested.
k. Specific gravity and absorption of each aggregate.
l. Percent natural sand.
m. Percent particles with two or more fractured faces (in coarse aggregate).
n. Fine aggregate angularity.
o. Percent flat or elongated particles (in coarse aggregate).
p. Tensile Strength Ratio.
q. Antistrip agent (if required).
r. List of all modifiers.
s. Percentage and properties (asphalt content, binder properties, and aggregate properties) of RAP in accordance with paragraph
RECYCLED HOT-MIX ASPHALT, if RAP is used.
32 12 15 Page 16
Table 7. Marshall Design Criteria
Test Property 75 Blow Mix
Stability, pounds minimum 2150 (1)
Flow, 0.01 inch 8-16 (2)
Air voids, percent 4 (4)
Percent Voids in mineral aggregate
(minimum) See Table 8
Dust Proportion (3) 0.8-1.2
TSR, minimum percent 75
(1) This is a minimum requirement. The average during construction shall be significantly higher than this number to ensure compliance with the specifications.
(2) The flow requirement is not applicable for Polymer Modified
Asphalts
(3) Dust Proportion is calculated as the aggregate content, expressed as a percent of mass, passing the No. 200 sieve, divided by the effective asphalt content, in percent of total mass of the mixture.
(4) Select the JMF asphalt content corresponding to an air void content of 4 percent. Verify the other properties of Table 7 meet the specification requirements at this asphalt content.
Table 8. Minimum Percent Voids in Mineral Aggregate (VMA) (4)
Aggregate (See Table 6) Minimum VMA, percent
Gradation 1 13.0
Gradation 2 14.0
Gradation 3 15.0
(1) Calculate VMA in accordance with AI MS-02, based on ASTM D 2726 bulk specific gravity for the aggregate.
2.3.2 Adjustments to JMF
The JMF for each mixture shall be in effect until a new formula is approved in writing by the COR. Should a change in sources of any materials be made, a new mix design shall be performed and a new JMF approved before the new material is used. The Contractor will be allowed to adjust the JMF within the limits specified below to optimize mix volumetric properties.
Adjustments to the JMF shall be limited to plus or minus 4 percent on the
No. 4 and coarser sieves; plus or minus 3 percent on the
No. 8 to No. 50 sieves; and plus or minus 1 percent on the No. 100 sieve.
Tolerances given above may permit the aggregate grading to be outside the limits shown in Table 6; this is acceptable. Adjustments to the JMF shall be limited to plus or minus 1.0 percent on the No. 200 sieve. The resulting
32 12 15 Page 17 aggregate grading on the No. 200 sieve shall not be outside the limits shown in Table 6. Asphalt content adjustments shall be limited to plus or minus
0.40 of binder content. If adjustments are needed that exceed these limits, a new mix design shall be developed.
PART 3 EXECUTION
3.1 CONTRACTOR QUALITY CONTROL
3.1.1 General Quality Control Requirements
Develop an approved Quality Control Plan. Hot-mix asphalt for payment shall not be produced until the quality control plan has been approved. The plan shall address all elements which affect the quality of the pavement including, but not limited to:
a. Mix Design and unique JMF identification code
b. Aggregate Grading
c. Quality of Materials
d. Stockpile Management and procedures to prevent contamination
e. Proportioning
f. Mixing and Transportation
g. Correlation of mechanical hammer to hand hammer. Determine the number of blows of the mechanical hammer required to provide the same density of the JMF as provided by the hand hammer. Use he average of three specimens per trial blow application.
h. Mixture Volumetrics
i. Moisture Content of Mixtures
j. Placing and Finishing
k. Joints
l. Compaction, including HMA-PCC joints
m. Surface Smoothness
n. Truck bed release agent
3.1.2 Testing Laboratory
Provide a fully equipped asphalt laboratory located at the plant or job site. It shall be equipped with heating and air conditioning units to maintain a temperature of 75 plus or minus 5 degrees F. Laboratory facilities shall be kept clean and all equipment shall be maintained in proper working condition. The COR shall be permitted unrestricted access to inspect the Contractor's laboratory facility, to witness quality control activities, and to perform any check testing desired. The COR will advise the Contractor in writing of any noted deficiencies concerning the
32 12 15 Page 18 laboratory facility, equipment, supplies, or testing personnel and procedures. When the deficiencies are serious enough to adversely affect test results, the incorporation of the materials into the work shall be suspended immediately and will not be permitted to resume until the deficiencies are corrected.
3.1.3 Quality Control Testing
Perform all quality control tests applicable to these specifications and as set forth in the Quality Control Program. The testing program shall include, but shall not be limited to, tests for the control of asphalt content, aggregate gradation, temperatures, aggregate moisture, moisture in the asphalt mixture, laboratory air voids, stability, flow, in-place density, grade and smoothness. A Quality Control Testing Plan shall be developed as part of the Quality Control Program.
3.1.3.1 Asphalt Content
A minimum of two tests to determine asphalt content will be performed per lot (a lot is defined in paragraph QUALITY ASSURANCE) by one of the following methods: extraction method in accordance with ASTM D 2172, Method
A or B, the ignition method in accordance with the AASHTO T 308, ASTM D
6307, or the nuclear method in accordance with ASTM D 4125, provided each method is calibrated for the specific mix being used. For the extraction method, the weight of ash, as described in ASTM D 2172, shall be determined as part of the first extraction test performed at the beginning of plant production; and as part of every tenth extraction test performed thereafter, for the duration of plant production. The last weight of ash value obtained shall be used in the calculation of the asphalt content for the mixture.
3.1.3.2 Aggregate Gradation and Specific Gravity
Aggregate gradations shall be determined a minimum of twice per lot from mechanical analysis of recovered aggregate in accordance with ASTM D 5444 or
ASTM D 6307. For batch plants, aggregates shall be tested in accordance with ASTM C 136 using actual batch weights to determine the combined aggregate gradation of the mixture. The specific gravity of each aggregate size grouping shall be determined for each 20,000 tons in accordance with
ASTM C 127 or ASTM C 128.
3.1.3.3 Temperatures
Temperatures shall be checked at least four times per lot, at necessary locations, to determine the temperature at the dryer, the asphalt cement in the storage tank, the asphalt mixture at the plant, and the asphalt mixture at the job site.
3.1.3.4 Aggregate Moisture
The moisture content of aggregate used for production shall be determined a minimum of once per lot in accordance with ASTM C 566.
3.1.3.5 Moisture Content of Mixture
The moisture content of the mixture shall be determined at least once per lot in accordance with ASTM D 1461 or an approved alternate procedure.
32 12 15 Page 19
3.1.3.6 Laboratory Air Voids, VMA, Marshall Stability and Flow
Mixture samples shall be taken at least four times per lot and compacted into specimens, using [50] [75] blows per side with the Marshall hand-held hammer as described in ASTM D 6926. After compaction, the laboratory air voids and VMA of each specimen shall be determined, as well as the Marshall stability and flow, as described in ASTM D 6927. The VMA shall be within the limits of Table 8.
3.1.3.7 In-Place Density
Conduct any necessary testing to ensure the specified density is achieved.
A nuclear gauge or other non-destructive testing device may be used to monitor pavement density.
3.1.3.8 Grade and Smoothness
Conduct the necessary checks to ensure the grade and smoothness requirements are met in accordance with paragraph QUALITY ASSURANCE.
3.1.3.9 Additional Testing
Any additional testing, which the Contractor deems necessary to control the process, may be performed at the Contractor's option.
3.1.3.10 QC Monitoring
Submit all QC test results to the COR on a daily basis as the tests are performed. The COR reserves the right to monitor any of the Contractor's quality control testing and to perform duplicate testing as a check to the
Contractor's quality control testing.
3.1.4 Sampling
When directed by the COR, sample and test any material which appears inconsistent with similar material being produced, unless such material is voluntarily removed and replaced or deficiencies corrected by the
Contractor. All sampling shall be in accordance with standard procedures specified.
3.1.5 Control Charts
For process control, establish and maintain linear control charts on both individual samples and the running average of last four samples for the parameters listed in Table 9, as a minimum. These control charts shall be posted as directed by the COR and shall be kept current at all times. The control charts shall identify the project number, the test parameter being plotted, the individual sample numbers, the Action and Suspension Limits listed in Table 9 applicable to the test parameter being plotted, and the
Contractor's test results. Target values from the JMF shall also be shown on the control charts as indicators of central tendency for the cumulative percent passing, asphalt content, and laboratory air voids parameters. When the test results exceed either applicable Action Limit, take immediate steps to bring the process back in control. When the test results exceed either applicable Suspension Limit, halt production until the problem is solved.
Use the control charts as part of the process control system for identifying trends so that potential problems can be corrected before they occur.
32 12 15 Page 20
Decisions concerning mix modifications shall be made based on analysis of the results provided in the control charts. The Quality Control Plan shall indicate the appropriate action which shall be taken to bring the process into control when certain parameters exceed their Action Limits.
Table 9. Action and Suspension Limits for the Parameters to be Plotted on
Individual and Running Average Control Charts
Individual Samples Running Average of
Last Four Samples
Action Suspension Action Suspension
Parameter to be Plotted Limit Limit Limit Limit
No. 4 sieve, Cumulative % 6 8 4 5
Passing, deviation from JMF target; plus or minus values
No. 30 sieve, Cumulative % 4 6 3 4
No. 200 sieve, Cumulative % 1.4 2.0 1.1 1.5
Stability, pounds (minimum) 1760 1640 2150 2030
75 blow JMF
Flow, 0.01 inches
75 blow JMF 8 min. 7 min. 9 min. 8 min.
16 max. 17 max. 15 max. 16 max.
Asphalt content, % deviation 0.4 0.5 0.2 0.3 from JMF target; plus or minus value
Laboratory Air Voids, % No specific action and suspension deviation from JMF target limits set since this parameter is value used to determine percent payment
In-place Mat Density, % of No specific action and suspension
TMD limits set since this parameter is used to determine percent payment
In-place Joint Density, % of No specific action and suspension
TMD limits set since this parameter is used to determine percent payment
3.2 PREPARATION OF ASPHALT BINDER MATERIAL
The asphalt cement material shall be heated avoiding local overheating and providing a continuous supply of the asphalt material to the mixer at a uniform temperature. Performance Graded (PG) asphalts shall be within the temperature range of 325 degrees F when added to the aggregates.
32 12 15 Page 21
3.3 PREPARATION OF MINERAL AGGREGATE
The aggregate for the mixture shall be heated and dried prior to mixing. No damage shall occur to the aggregates due to the maximum temperature and rate of heating used. The temperature of the aggregate and mineral filler shall not exceed 350 degrees F when the asphalt cement is added. The temperature shall not be lower than is required to obtain complete coating and uniform distribution on the aggregate particles and to provide a mixture of satisfactory workability.
3.4 PREPARATION OF HOT-MIX ASPHALT MIXTURE
The aggregates and the asphalt cement shall be weighed or metered and introduced into the mixer in the amount specified by the JMF. The combined materials shall be mixed until the aggregate obtains a thorough and uniform coating of asphalt binder (testing in accordance with ASTM D 2489 may be required by the COR) and is thoroughly distributed throughout the mixture.
The moisture content of all hot-mix asphalt upon discharge from the plant shall not exceed 0.5 percent by total weight of mixture as measured by ASTM
D 1461.
3.5 PREPARATION OF THE UNDERLYING SURFACE
Immediately before placing the hot mix asphalt, the underlying course shall be cleaned of dust and debris. A tack coat shall be applied in accordance with the contract specifications.
3.6 TEST SECTION
Prior to full production, place a test section for each JMF used. Construct a test section 250 - 500 feet long and two paver passes wide placed in two lanes, with a longitudinal cold joint. The test section shall be of the same depth as the course which it represents. The underlying grade or pavement structure upon which the test section is to be constructed shall be the same as the remainder of the course represented by the test section.
The equipment used in construction of the test section shall be the same equipment to be used on the remainder of the course represented by the test section. The test section shall be placed as part of the project pavement as approved by the COR.
3.6.1 Sampling and Testing for Test Section
One random sample shall be taken at the plant, triplicate specimens compacted, and tested for stability, flow, laboratory air voids, and Tensile
Strength Ratio (TSR). A portion of the same sample shall be tested for theoretical maximum density (TMD), aggregate gradation and asphalt content.
Four randomly selected cores shall be taken from the finished pavement mat, and four from the longitudinal joint, and tested for density. Random sampling shall be in accordance with procedures contained in ASTM D 3665.
The test results shall be within the tolerances or exceed the minimum values shown in Table 10 for work to continue. If all test results meet the specified requirements, the test section shall remain as part of the project pavement. If test results exceed the tolerances shown, the test section shall be removed and replaced at no cost to the GovernmentOwner and another test section shall be constructed.
32 12 15 Page 22
Table 10. Test Section Requirements for Material and Mixture Properties
Property Specification Limit
Aggregate Gradation-Percent Passing (Individual Test Result)
No. 4 and larger JMF plus or minus 8
No. 8, No. 16, No. 30, and No. 50 JMF plus or minus 6
No. 100 and No. 200 JMF plus or minus 2.0
Asphalt Content, Percent JMF plus or minus 0.5
(Individual Test Result)
Laboratory Air Voids, Percent
(Average of 3 specimens) JMF plus or minus 1.0
VMA, Percent (Average of 3 specimens) See Table 8
Stability, pounds (Average of 3 specimens) 2150 minimum
Flow, 0.01 inches (Average of 3 specimens) 8 - 18
Tensile Strength Ratio (TSR) 75% minimum
Mat Density, Percent of TMD
(Average of 4 Random Cores) 92.0 - 96.0
Joint Density, Percent of TMD
(Average of 4 Random Cores) 90.5 minimum
3.6.2 Additional Test Sections
If the initial test section should prove to be unacceptable, the necessary adjustments to the JMF, plant operation, placing procedures, and/or rolling procedures shall be made. A second test section shall then be placed.
Additional test sections, as required, shall be constructed and evaluated for conformance to the specifications. Full production shall not begin until an acceptable section has been constructed and accepted.
3.7 TESTING LABORATORY
The laboratories used to develop the JMF, perform Contractor Quality Control testing, and for COR acceptance testing shall meet the requirements of ASTM
D 3666. All required test methods shall be performed by an accredited laboratory. [The Government will inspect the laboratory equipment and test procedures prior to the start of hot-mix operations for conformance with
ASTM D 3666. The laboratory shall maintain this validation for the duration of the project.] A certification signed by the manager of the laboratory stating that it meets these requirements shall be submitted to the COR prior to the start of construction.