DIVISION 16 ITEM L-108 INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS

View the file

Other files

File Type Posted
P-153.pdf PDF
014-C-061.pdf PDF
01500.pdf PDF
261200r.pdf PDF
024-C-652.pdf PDF
018-C-204.pdf PDF
L-110.pdf PDF
003-G-021.pdf PDF
031-E-401.pdf PDF
033-E-602.pdf PDF
015-C-201.pdf PDF
P-406.pdf PDF
01420.pdf PDF
P-610.pdf PDF
013-C-055.pdf PDF
027-E-001.pdf PDF
011-C-053.pdf PDF
01310.pdf PDF
01350.pdf PDF
006-G-083.pdf PDF
004-G-081.pdf PDF
007-C-021.pdf PDF
010-C-052.pdf PDF
01320.pdf PDF
005-G-082.pdf PDF
L-109.pdf PDF
32 12 15.pdf PDF
022-C-301.pdf PDF
002-G-002.pdf PDF
01340.pdf PDF
021-C-211.pdf PDF
32 92 19.pdf PDF
009-C-051.pdf PDF
01700.pdf PDF
019-C-205.pdf PDF
01782.pdf PDF
01781.pdf PDF
017-C-203.pdf PDF
020-C-206.pdf PDF
025-C-653.pdf PDF
32 05 33.pdf PDF
026-C-671.pdf PDF
001-G-001.pdf PDF
01330.pdf PDF
32 17 24.00 10.pdf PDF
32 12 10.pdf PDF
030-E-203.pdf PDF
01162.pdf PDF
SpecCover_TOC.pdf PDF
01600.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-1

DIVISION 16

ITEM L-108 INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS

DESCRIPTION

108-1.1 This item shall consist of furnishing and installing underground cable in accordance with these specifications at the locations shown in the plans. This item shall include the excavation and backfill of the trench and the installation of cable and counterpoise wire in trench, duct or conduit. It shall include splicing, cable marking, and testing of the installation and all incidentals necessary to place the cable in operating condition as a completed unit to the satisfaction of the COR. This item shall not include the installation of the duct or conduit.

EQUIPMENT AND MATERIALS

108-2.1 GENERAL.

a. Airport lighting equipment and materials covered by Federal Aviation

Administration (FAA) specifications shall have the prior approval of the FAA, and are listed in Advisory

Circular (AC) 150/5345-1, Approved Airport Equipment.

b. All other equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification, when requested by the COR.

108-2.2 CABLE. Underground cable shall conform to the requirements of AC 150/5345-7, Specification for L-824 Underground Electrical Cable for Airport Lighting Circuits.

Where counterpoise conductors are to be installed and where soil conditions would adversely affect bare copper wire, thermoplastic wire conforming to Fed. Spec. J-C-30, Type TW, 600 volt, may be used.

Wire for electrical circuits up to 600 volts shall comply with Specification L-824 and/or Federal Specification J-C-30 and shall be type THWN-2.

Cable type, size, number of conductors, strand and service voltage shall be specified in the plans and/or proposal.

108-2.3 BARE COPPER WIRE (COUNTERPOISE). Bare copper wire for counter-poise installations shall be stranded wire conforming to ASTM Specifications B 3 and B 8.

108-2.4 CABLE CONNECTIONS. In-line connections of underground primary cables shall be of the type called for in the plans or in the proposal, and shall be one of the types listed below. When the plans or the proposal permit a choice of connection, the Contractor shall indicate in the bid the type of connection he proposes to furnish.

a. The Cast Splice. A cast splice, employing a plastic mold and using epoxy resin equal to that manufactured by Minnesota Mining and Manufacturing Company, “Scotchcast” Kit No. 82--

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-2

A, or as manufactured by Hysol Corporation, “Hyseal Epoxy Splice” Kit No. E1135, for potting the splice is approved. This means of splicing is the only type approved for telephone control cable.

b. The Vulcanized Splice. A vulcanized splice employing Joy Manufacturing

Company's Vulcanizing Kit No. X-1604-8 or equal is approved for field vulcanized splices. The proper molds for various cable sizes shall be used.

c. The Field-attached Plug-in Splice. Figure 3 of AC 150/5345-26, Specification for

L-823 Plug and Receptacle, Cable Connectors, employing connector kits, is approved for field attachment to single conductor cable.

d. The Factory-Molded Plug-in Splice. Specification for L-823 Connectors, Factory-

Molded to Individual Conductors, is approved.

e. The Taped Splice. Taped splices employing field-applied rubber, or synthetic rubber tape covered with plastic tape are approved. The rubber tape should meet the requirements of

Mil. Spec. MIL-I-3825 and the plastic tape should comply with Mil. Spec. MIL-I-7798 or Fed. Spec. HH-I-

595. In all the above cases, connections of cable conductors shall be made using crimp connectors utilizing a crimping tool designed. To make a complete crimp before the tool can be removed. No. 19

AWG telephone control wires may be connected by means of wrapped and soldered splice, 3M Company

Moisture Proof UR Type Connector, or equal, or by a method approved by the COR.

108-2.5 CONCRETE. Concrete for cable markers shall conform to Specification Item P-610, “Structural

Portland Cement Concrete.”

CONSTRUCTION METHODS

108-3.1 GENERAL. The Contractor shall install the specified cable at the approximate locations indicated in the airport lighting layout plans. The COR shall indicate specific locations.

Cable connections between lights will be permitted only at the light locations for connecting the underground cable to the primary leads of the individual insulating transformers. The Contractor shall be responsible for providing cab1e in continuous lengths for home runs or other long cable runs without connections, unless otherwise authorized in writing by the COR or shown in the plans.

108-3.2 INSTALLATION IN DUCT OR CONDUIT. This item includes the installation of the cable in duct or conduit as described below. The maximum number and voltage ratings of cables installed in each single duct or conduit, and the current-carrying capacity of each cable shall be in accordance with the latest National Electric Code, or the code of the local agency having jurisdiction.

The Contractor shall make no connections or joints of any kind in cables installed in conduits or ducts.

The duct or conduit shall be installed as a separate item in accordance with Item L-110, “Installation of

Airport Underground Electrical Duct.” The Contractor shall make sure that the duct is open, continuous, and clear of debris before installing cable. The cable shall be installed in a manner to prevent harmful

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-3

stretching of the conductor, injury to the insulation, or damage to the outer protective covering. The ends of all cables shall be sealed with moisture-seal tape before pulling into the conduit and it shall be left sealed until connections are made. Where more than one cable is to be installed in a duct under the same contract, all cable shall be pulled in the duct at the same time. The pulling of a cable through ducts or conduits may be accomplished by hand winch or power winch with the use of cable grips or pulling eyes. Pulling tensions should be governed by recommended standard practices for straight pulls or bends. A lubricant recommended for the type of cable being installed shall be used where pulling lubricant is required. Duct or conduit markers temporarily removed for excavations shall be replaced as required.

108-3.3 TRENCHING. Where turf is well established and the sod can be removed, it shall be carefully stripped and properly stored. Trenches for cables may be excavated manually or with mechanical trenching equipment. Walls of trenches shall be essentially vertical so that a minimum of shoulder surface is disturbed. Road patrols or graders shall not be used to excavate the trench with their blades.

The bottom surface of trenches shall be essentially smooth and free from coarse aggregate. Unless otherwise specified, cable trenches shall be excavated to a minimum depth of 18 inches below finished grade, except as follows:

a. When off the airport or crossing under a roadway or driveway, the minimum depth shall be 36 inches unless otherwise specified.

b. Minimum cable depth, when crossing under a railroad track, shall be 42 inches unless otherwise specified.

The Contractor shall excavate all cable trenches to a width not less than 6 inches. The trench shall be widened where more than two cables are to be installed parallel in the same trench. Unless otherwise specified in the plans, all cables in the same location and running in the same general direction shall be installed in the same trench.

When rock excavation is encountered, the rock shall be removed to a depth of at least 3 inches below the required cable depth and it shall be replaced with bedding material of earth or sand containing no mineral aggregate particles that would be retained on a 1/4-inch sieve. The Contractor shall ascertain the type of soil or rock to be excavated before bidding. All excavation shall be unclassified.

108-3.4 INSTALLATION IN TRENCHES. The Contractor shall not use a cable plow for installing the cable. Mechanical cable-laying equipment may be used in conjunction with a trenching machine if specified on project plans and specifications; and it should provide for physical inspection of cable prior to backfilling. Sharp bends or kinks in the cable shall not be permitted.

Cables shall be unreeled in place alongside or in the trench and shall be carefully placed along the bottom of the trench. The cable shall not be unreeled and pulled into the trench from one end.

Where two or more cables are laid parallel in the same trench, they shall be placed laterally a minimum distance of 3 inches apart, and the trench shall be widened sufficiently to accomplish this.

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-4

Cables crossing over each other shall have a minimum of 3-inch vertical displacement with the topmost cable depth at or below the minimum required depth below finished grade.

Not less than 1 foot of cable slack shall be left on each side of all connections, insulating transformers, light units, and at all other points where cable is connected to field equipment. The slack cable shall be placed in the trench in a series of S curves. Additional slack cable shall be left in runway light bases, handholes, manholes, etc., where it is required to bring the cable above ground level to make connections. The amount of slack cable shall be stipulated by the COR, or as shown in the plans and specifications.

108-3.5 BACKFILLING. After the cable has been installed, the trench shall be 3 inches deep, loose measurement, and shall be either earth or sand containing no mineral aggregate particles that would be retained on a 1/4-inch sieve. This layer shall not be compacted. The second layer shall be 5 inches deep, loose measurement, and shall contain no particles that would be retained on a 1-inch sieve. The remainder of the backfill shall be excavated or imported mineral and shall not contain stone or aggregate larger than 4 inches maximum diameter. The third and subsequent layers of the backfill shall not exceed

8 inches in maximum depth, loose measurement.

The second and subsequent layers shall be thoroughly tamped and compacted to at least the density of the adjacent undisturbed soil, and to the satisfaction of the COR. If necessary to obtain the desired compaction, the backfill material shall be moistened or aerated as required.

Trenches shall not be excessively wet and shall not contain pools of water during backfilling operations.

The trench shall be completely backfilled and tamped level with the adjacent surface, except that when sod is to be placed over the trench, the backfilling shall be stopped at a depth equal to the thickness of the sod to be used, with proper allowance for settlement. Any excess excavated material shall be removed and disposed of in accordance with instructions issued by the COR.

108-3.6 RESTORATION. Where sod has been removed, it shall be replaced as soon as possible after the backfilling is completed. All areas disturbed by the trenching, storing of dirt, cable laying, pad construction, and other work shall be restored to its original condition. The restoration shall include any necessary topsoiling, fertilizing, liming, seeding, sodding, sprigging or mulching. All such work shall be performed in accordance with the FAA standard turfing specifications. The Contractor shall be held responsible for maintaining all disturbed surfaces and replacements until final acceptance.

108-3.7 CABLE MARKERS. The location of runway light circuits shall be marked by a concrete slab marker, 2 feet square and 4 inches thick, extending approximately 1 inch above the surface. Each cable run from the line of runway lights to the equipment vault shall also be marked at approximately every 200 feet along the cable run, with an additional marker at each change of direction of cable run. All other cable buried directly in the earth shall be marked in the same manner. The Contractor shall not install slab markers where cable lies in straight lines between obstruction light poles which are spaced 300 feet apart, or less. Cable markers shall be installed immediately above the cable. The Contractor shall impress the word “cable” and directional arrows on each cable marking slab. The letters shall be approximately 4 inches high and 3 inches wide, with width of stroke ½-inch and ¼-inch deep.

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-5

The location of each underground cable connection, except at lighting units or insulating transformers, shall be marked by a concrete marker slab placed above the connection. The Contractor shall impress the word “splice” on each slab. He also shall impress additional circuit identification symbols on each slab if so desired by the COR.

108-3.8 SPLICING. Connections of the type shown in the plans shall be made by experienced personnel regularly engaged in this type of work and shall be made as follows:

a. Cast Splices. These shall be made by using crimp connectors for jointing conductors. Molds shall be assembled, and the compound shall be mixed and poured in accordance with manufacturer's instructions and to the satisfaction of the COR.

b. Vulcanized Splices. These shall be made by using crimp connectors for joining conductors. The splice shall be made, using compounds furnished by the manufacturer, in accordance with his/her instructions and to the satisfaction of the COR.

c. Field-attached Plug-in Splices. These shall be assembled in accordance with manufacturer's instructions. These splices shall be made by plugging directly into mating connectors. In all cases the joint where the connectors come together shall be wrapped with at least one layer of rubber or synthetic rubber tape and one layer of plastic tape, one-half lapped, extending at least 1-1/2 inches on each side of the joint.

d. Factory-Molded Plug-in Splices. These shall be made by plugging directly into mating connectors. In all cases, the joint where the connectors come together shall be wrapped with at least one layer of rubber or synthetic rubber tape and one layer of plastic tape, one-half lapped, extending at least 1-1/2 inches on each side of the joint.

e. Taped Splices. A taped splice shall be made in the following manner:

Bring the cables to their final position and cut so that the conductors will butt. Remove insulation and jacket allowing for bare conductor of proper length to fit compression sleeve connector with 1/4 inch of bare conductor on each side of the connector. Use a sharp knife to pencil insulation and jacket at approximately the same angle as a pencil point. Care must be taken to avoid nicking or injuring the conductor during removal of insulation or penciling. Do not use emery paper on splicing operation since it contains metallic particles. The copper conductors shall be thoroughly cleaned. Join the conductors by inserting them equidistant into the compression connection sleeve. Crimp conductors firmly in place with crimping tool that requires a complete crimp before tool can be removed. Test the crimped connection by pulling on the cable. Scrape the insulation to assure that the entire surface over which the tape will be applied (plus 3 inches on each end) is clean. After scraping wipe the entire area with a clean lint-free cloth. Do not use solvents.

Apply high-voltage rubber tape one-half lapped over bare conductor. This tape should be tensioned as recommended by the manufacturer. Voids in the connector area may be eliminated by highly elongating the tape stretching it just short of its breaking point. Throughout the rest of the splice less tension should be used. Always attempt to exactly half-lap to produce a uniform buildup. Continue buildup to 1-1/2

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-6

times cable diameter over the body of the splice with ends tapered a distance of approximately 1-inch over the original jacket. Cover rubber tape with two layers of vinyl pressure-sensitive tape one-half lapped. Do not use glyptol or lacquer over vinyl tape as they react as solvents to the tape. No further cable covering or splice boxes are required.

If shielded cable is to be spliced, prepare cable as for a regular taped splice, except that the neoprene jacket shall be removed a distance not less than 5 inches from the beginning of the penciled portion.

Carefully unwrap the shielding tape from that portion where jacket has been removed and cut off so that it extends about 1 inch from end of the jacket. Proceed with the taped splice as described above and tape up to 1/4 inch from the shield on both ends. Build up rubber tape to a thickness equal to the insulation thickness or 5/16 inch over connector.

Next wrap one-half lapped layer of semi-conducting tape (Scotch No. 13 Semi-Conducting Tape, or equal) over splicing tape and 1/4 inch onto the shielding tape. Wrap a fine, flat shielding braid one-half lapped over the splice extending 1/2 inch onto the metallic shielding. Solder ends of braid to metallic shielding tape. A bonding wire, (Minimum No. 14 Stranded Copper) equal to the current carrying capacity of the metallic shield, should have the individual strands wrapped around the metallic shield at both ends of the splice. These strands should be tack soldered to the shield in several places. The cable sheath should be replaced by wrapping with two one-half lapped layers of vinyl tape extending 2 inches onto the cable jacket.

The above described splice is for a straight-through splice with continuity of shielding.

108-3.9 BARE COUNTERPOISE WIRE INSTALLATION AND GROUNDING FOR LIGHTNING

PROTECTION. If shown in the plans or specified in job specifications, a stranded bare copper wire, No. 8

AWG minimum size, shall be installed for lightning protection of the underground cables. The bare counterpoise wire shall be installed in the same trench for the entire length of the insulated cables it is designed to protect, and shall be placed at a distance of approximately 4 inches from the insulated cable.

The counterpoise wire shall be securely attached to each light fixture base, or mounting stake. The counterpoise wire shall also be securely attached to copper or copper-clad ground rods installed not more than 1,000 feet apart around the entire circuit. The ground rods shall be of the length and diameter specified in the plans, but in no case shall they be less than 8-feet long nor less than 5/8 inch in diameter.

The counterpoise system shall terminate at the transformer vault or at the power source. It shall be securely attached to the vault or equipment grounding system. The connections shall be made as shown in the project plans and specifications.

108-3.10 TESTING. The Contractor shall furnish all necessary equipment and appliances for testing the underground cable circuits after installation. The Contractor shall test and demonstrate to the satisfaction of the COR the following:

a. That all lighting power and control circuits are continuous and free from short circuits.

b. That all circuits are free from unspecified grounds.

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-7

c. That the insulation resistance to ground of all nongrounded series circuits is not less than 50 megohms.

d. That the insulation resistance to ground of all nongrounded conductors of multiple circuits is not less than 50 megohms.

e. That all circuits are properly connected in accordance with applicable wiring diagrams.

f. That all circuits are operable. Tests shall be conducted that include operating each control not less than 10 times and the continuous operation of each lighting and power circuit for not less than 1/2 hour.

METHOD OF MEASUREMENT

108-4.1 Trenching shall be measured by the linear feet of trench, including the excavation, backfill, and reconditioning, completed, measured as excavated, and accepted as satisfactory.

When specified in the proposal, separate measurement shall be made for trenches of various specified widths.

108-4.2 Cable or counterpoise wire installed in trench shall be measured by the number of linear feet of cable or counterpoise wire installed in trenches, ready for operation, and accepted as satisfactory.

Separate measurement shall be made for each cable or counterpoise wire installed in trench.

108-4.3 Cable or counterpoise wire installed in duct or conduit shall be measured by the number of linear feet measured in place, completed, ready for operation, and accepted as satisfactory.

Separate measurement shall be made for each cable or counterpoise wire installed in duct or conduit.

BASIS OF PAYMENT

108-5.1 Payment will be made at the contract unit price for trenching cable and bare counterpoise wire installed in trench or duct in place by the Contractor and accepted by the COR. This price shall be full compensation for furnishing all materials and for all preparation and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item.

Payment will be made under:

Item L-108-5.1 Cable Trench--per linear foot

Item L-108-5.2 Underground Cable, installed in trench--per liner foot

Item L-108-5.3 Underground Cable, installed in duct or conduit--per linear foot

INSTALLATION OF UNDERGROUND CABLE FOR AIRPORTS L-108-8

Item L-108-5.4 Bare Counterpoise Wire, installed in trench, including ground rods and ground connectors--per linear foot

Item L-108-5.5 Bare Counterpoise Wire, installed in duct--per linear foot

MATERIAL REQUIREMENTS

AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport Lighting

Circuits

AC 150/5345-26 Specification for L-823 Plug and Receptacle Cable Connectors

Fed.Spec.J-C-30 Cable and Wire, Electrical Power, Fixed Installation

HH-I-595 Insulation Tape, Electrical, Pressure-Sensitive Adhesive, Plastic, for

Low-Temperature Application

ASTM B 3 Soft or Annealed Copper Wire

ASTM B 8 Concentric-Lay-Stranded Cooper Conductor, Hard, Medium-Hard, or

Soft

MIL-I-3825 Insulation Tape, Electrical, Self-Fusing, For Use in Electronics, Communications, and Allied Equipment

MIL-I-7798 Insulation Tape, Electrical, Pressure-Sensitive Adhesive, Plastic

END OF ITEM L-108