01162.pdf
PDF 24 KB Posted
- Attached to
- Repair Military Taxiway located at the Portland Air National Guard Base, Portland, Oregon
- Solicitation number
- W912JV-09-R-0008
About this file
SECTION 01162 HAZARDOUS MATERIAL USAGE REQUIREMENTS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-153.pdf | ||
| 014-C-061.pdf | ||
| 01500.pdf | ||
| 261200r.pdf | ||
| 024-C-652.pdf | ||
| 018-C-204.pdf | ||
| L-110.pdf | ||
| 003-G-021.pdf | ||
| 031-E-401.pdf | ||
| 033-E-602.pdf | ||
| 015-C-201.pdf | ||
| P-406.pdf | ||
| 01420.pdf | ||
| P-610.pdf | ||
| 013-C-055.pdf | ||
| 027-E-001.pdf | ||
| 011-C-053.pdf | ||
| 01310.pdf | ||
| 01350.pdf | ||
| 006-G-083.pdf | ||
| 004-G-081.pdf | ||
| 007-C-021.pdf | ||
| 010-C-052.pdf | ||
| 01320.pdf | ||
| 005-G-082.pdf | ||
| L-109.pdf | ||
| 32 12 15.pdf | ||
| 022-C-301.pdf | ||
| 002-G-002.pdf | ||
| 01340.pdf | ||
| 021-C-211.pdf | ||
| 32 92 19.pdf | ||
| 009-C-051.pdf | ||
| 01700.pdf | ||
| 019-C-205.pdf | ||
| 01782.pdf | ||
| 01781.pdf | ||
| 017-C-203.pdf | ||
| 020-C-206.pdf | ||
| 025-C-653.pdf | ||
| 32 05 33.pdf | ||
| 026-C-671.pdf | ||
| 001-G-001.pdf | ||
| 01330.pdf | ||
| 32 17 24.00 10.pdf | ||
| 32 12 10.pdf | ||
| 030-E-203.pdf | ||
| L-108.pdf | ||
| SpecCover_TOC.pdf | ||
| 01600.pdf |
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01162 - 1 MEAD & HUNT, Inc.
SECTION 01162 – HAZARDOUS MATERIAL USAGE REQUIREMENTS
PART 1 - GENERAL
1.1. DESCRIPTION
A. Conditions of the Contract and Division 1 apply to this Section.
1.2 HAZARDOUS MATERIAL USAGE
A. The contractor shall establish a Hazardous Material (HM) storage and distribution system when HM is to be used. All HM required to support the contract shall be reported to the Hazardous Material Pharmacy (HMP) using the Contractor HM Identification Form. The Contractor HM Identification Form will be provided to the Contractor at or prior to the Pre-Construction meeting.
Additional HM needed by the contractor shall be identified to the Contracting Officer’s Representative (COR) for approval by the HMP. Reference Attachment 01162A.
B. The contractor planning to use HM for the work shall register with the base HMP prior to start of work in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with the Right-To-Know Laws and Pollution Prevention Requirements.
C. The contractor shall maintain Contractor HM Identification Form for HM on the job site for inspection/verification.
D. The COR will verify that the HM identified to HMP is the only HM in use on the job site.
E. The contractor shall be responsible for the following items:
a. Provide a list of each material and quantity of material for all proposed Hazardous Material (HM). HM shall be construed to mean any item that is:
1) A health hazard or physical hazard as defined in 29 CFR, 1910.1200(c).
2) Regulated in its disposal by EPA under 40 CFR.
3) Hazardous as defined by DOT regulations under 49 CFR.
4) Hazardous as defined by the Dangerous Goods Regulations of the International Air Transport Association.
F. Provide a material safety data sheet (MSDS) for each item on the HM list.
G. The contractor shall establish a construction specific HM storage and issue location that fully complies with Federal, State and Local environmental regulations. Materials issued shall be tracked for quantities used. Unused materials shall be inventoried and removed from the ANG installation prior to close out of the contract or expiration date of the HM. Reports of materials delivered, used and removed from the installation shall be submitted to the COR monthly and prior to contract close-out.
H. The contractor shall comply with all Federal, State, and Local environmental.
01162 - 2 MEAD & HUNT, Inc.
I. The contractor shall accompany the Bio-environmental Engineering Representative (BEE) and the (COR) on project close-out inspection to ensure all used/unused HM is removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the Government accepting beneficial occupancy of the facility or construction item. Reference Attachment 01162B.
01162 - 3 MEAD & HUNT, Inc.
ATTACHMENT 01162A
Contractor Hazardous Material Identification Form
Part I Date
This part is to be completed by Contractor prior to the construction start date, and shall be maintained on the job site.
Contractor Company: (name) Proposed work term: (date) to (date) Contractor Point of Contact: (full name or names, phone/pager numbers, emergency 24 hour contact number etc.)
HM to be used:
MFG./Product
M.S.D.S.
Attached
Quantity Used
Disposal Procedures
Use/Unused material removed from ANG installation
Note: This form is good for a one-month period and is to be submitted to the Hazardous Material Pharmacy. All Hazardous Material used thereafter will be identified to the Contracting Officer’s Representative for approval by the Hazardous Material Pharmacy. See Part II for Contractor close-out procedures. The Hazardous Material Pharmacy phone number is
(xxx) xxx-xxxx.
Approval Signatures:
COR (Contracting Officer Representative)
BEER (Bio-Environmental Engineering Representative)
EM (Environmental Manager)
SO (Safety Officer)
01162 - 4 MEAD & HUNT, Inc.
ATTACHMENT 01162B
Contractor Hazardous Material Identification Form Close-Out Procedures
Part II Date
Attach this form to Part I
The Contractor shall accompany the Contracting Officer Representative and Environmental Manager on the close-out inspection to ensure all used/unused HM was removed from the installation.
Closeout Approval Signatures:
COR (Contracting Officer Representative)
BEER (Bio-Environmental Engineering Representative)
EM (Environmental Manager)
Contractor
END OF SECTION
File details come from the government source that posted it. Updated .