261200r.pdf
PDF 31 KB Posted
- Attached to
- Repair Military Taxiway located at the Portland Air National Guard Base, Portland, Oregon
- Solicitation number
- W912JV-09-R-0008
About this file
SECTION 261200 - MEDIUM-VOLTAGE TRANSFORMERS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-153.pdf | ||
| 014-C-061.pdf | ||
| 01500.pdf | ||
| 024-C-652.pdf | ||
| 018-C-204.pdf | ||
| L-110.pdf | ||
| 003-G-021.pdf | ||
| 031-E-401.pdf | ||
| 033-E-602.pdf | ||
| 015-C-201.pdf | ||
| P-406.pdf | ||
| 01420.pdf | ||
| P-610.pdf | ||
| 013-C-055.pdf | ||
| 027-E-001.pdf | ||
| 011-C-053.pdf | ||
| 01310.pdf | ||
| 01350.pdf | ||
| 006-G-083.pdf | ||
| 004-G-081.pdf | ||
| 007-C-021.pdf | ||
| 010-C-052.pdf | ||
| 01320.pdf | ||
| 005-G-082.pdf | ||
| L-109.pdf | ||
| 32 12 15.pdf | ||
| 022-C-301.pdf | ||
| 002-G-002.pdf | ||
| 01340.pdf | ||
| 021-C-211.pdf | ||
| 32 92 19.pdf | ||
| 009-C-051.pdf | ||
| 01700.pdf | ||
| 019-C-205.pdf | ||
| 01782.pdf | ||
| 01781.pdf | ||
| 017-C-203.pdf | ||
| 020-C-206.pdf | ||
| 025-C-653.pdf | ||
| 32 05 33.pdf | ||
| 026-C-671.pdf | ||
| 001-G-001.pdf | ||
| 01330.pdf | ||
| 32 17 24.00 10.pdf | ||
| 32 12 10.pdf | ||
| 030-E-203.pdf | ||
| 01162.pdf | ||
| L-108.pdf | ||
| SpecCover_TOC.pdf | ||
| 01600.pdf |
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
261200 - 1 MEAD & HUNT, Inc.
SECTION 261200 - MEDIUM-VOLTAGE TRANSFORMERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 DEFINITIONS
A. NETA ATS: Acceptance Testing Specification.
1.3 SUBMITTALS
A. Product Data: Include rated nameplate data, capacities, weights, dimensions, minimum clearances, installed devices and features, location of each field connection, and performance for each type and size of transformer indicated.
B. Shop Drawings: Diagram power signal and control wiring.
C. Coordination Drawings: Floor plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:
1. Underground primary and secondary conduit stub-up location.
2. Dimensioned concrete base, outline of transformer, and required clearances.
3. Ground rod and grounding cable locations.
D. Qualification Data: For testing agency.
E. Source quality-control test reports.
F. Field quality-control test reports.
G. Follow-up service reports.
H. Operation and Maintenance Data: For transformer and accessories to include in emergency, operation, and maintenance manuals.
1.4 QUALITY ASSURANCE
A. Product Options: Drawings indicate size, profiles, and dimensional requirements of transformers and are based on the specific system indicated. Refer to Division 01 Section "Product Requirements."
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
261200 - 2 MEAD & HUNT, Inc.
C. Comply with IEEE C2.
D. Comply with ANSI C57.12.10, ANSI C57.12.28, IEEE C57.12.70, and IEEE C57.12.80.
E. Comply with NFPA 70.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store transformers protected from weather and so condensation will not form on or in units.
Provide temporary heating according to manufacturer's written instructions.
1.6 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.
B. Coordinate installation of louvers, doors, spill retention areas, and sumps. Coordinate installation so no piping or conduits are installed in space allocated for medium-voltage transformers except those directly associated with transformers.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Acme Electric Corporation; Power Distribution Products Division.
2. Cooper Industries; Cooper Power Systems Division.
3. Cutler-Hammer.
4. Federal Pacific Transformer Company; Division of Electro-Mechanical Corp.
5. GE Electrical Distribution & Control.
6. Hammond Manufacturing; Transformer Group.
7. Kuhlman Electric Corporation.
8. Pauwels Transformers.
9. Pioneer Transformers.
10. Siemens Energy & Automation, Inc.
11. Square D; Schneider Electric.
12. Uptegraff, R. E. Mfg. Co.
13. Virginia Transformer Corp.
2.2 PAD-MOUNTED, LIQUID-FILLED TRANSFORMERS
A. Description: ANSI C57.12.13, ANSI C57.12.26, IEEE C57.12.00, pad-mounted, 2-winding transformers. Stainless-steel tank base, cabinet, and sills.
B. Insulating Liquid: Mineral oil, complying with ASTM D 3487, Type II, and tested according to
ASTM D 117.
261200 - 3 MEAD & HUNT, Inc.
C. Insulating Liquid: Less flammable, edible-seed-oil based, and UL listed as complying with NFPA 70 requirements for fire point of not less than 300 deg C when tested according to ASTM D 92. Liquid shall be biodegradable and nontoxic.
D. Basic Impulse Level: 30 kV.
E. Full-Capacity Voltage Taps: Four 2.5 percent taps, 2 above and 2 below rated high voltage;
with externally operable tap changer for de-energized use and with position indicator and padlock hasp.
F. High-Voltage Switch: 200 A, make-and-latch rating of 10-kA RMS, symmetrical, arranged for radial feed with 3-phase, 2-position, gang-operated, load-break switch that is oil immersed in transformer tank with hook-stick operating handle in primary compartment.
G. Primary Fuses: 150-kV fuse assembly with fuses complying with IEEE C37.47. Rating of current-limiting fuses shall be 50-kA RMS at specified system voltage.
1. Current-limiting type in dry-fuse holder wells, mechanically interlocked with liquid-immersed switch in transformer tank to prevent disconnect under load.
2. Internal liquid-immersed cartridge fuses.
3. Bay-O-Net liquid-immersed fuses that are externally replaceable without opening transformer tank.
4. Bay-O-Net liquid-immersed fuses in series with liquid-immersed current-limiting fuses.
Bay-O-Net fuses shall be externally replaceable without opening transformer tank.
5. Bay-O-Net liquid-immersed current-limiting fuses that are externally replaceable without opening transformer tank.
H. High-Voltage Terminations and Equipment: Dead front with universal-type bushing wells for dead-front bushing-well inserts, complying with IEEE 386 and including the following:
1. Bushing-Well Inserts: One for each high-voltage bushing well.
2. Surge Arresters: Dead-front, elbow-type, metal-oxide-varistor units.
3. Parking Stands: One for each high-voltage bushing well.
4. Portable Insulated Bushings: Arranged for parking insulated, high-voltage, load-break cable terminators; one for each primary feeder conductor terminating at transformer.
2.3 IDENTIFICATION DEVICES
A. Nameplates: Engraved, laminated-plastic or metal nameplate for each transformer, mounted with corrosion-resistant screws..
2.4 SOURCE QUALITY CONTROL
A. Factory Tests: Perform design and routine tests according to standards specified for components. Conduct transformer tests according to ANSI C57.12.50.
B. Factory Tests: Perform the following factory-certified tests on each transformer:
1. Resistance measurements of all windings on rated-voltage connection and on tap extreme connections.
2. Ratios on rated-voltage connection and on tap extreme connections.
3. Polarity and phase relation on rated-voltage connection.
4. No-load loss at rated voltage on rated-voltage connection.
261200 - 4 MEAD & HUNT, Inc.
5. Excitation current at rated voltage on rated-voltage connection.
6. Impedance and load loss at rated current on rated-voltage connection and on tap extreme connections.
7. Applied potential.
8. Induced potential.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions for compliance with requirements for medium-voltage transformers.
B. Examine roughing-in of conduits and grounding systems to verify the following:
1. Wiring entries comply with layout requirements.
2. Entries are within conduit-entry tolerances specified by manufacturer and no feeders will have to cross section barriers to reach load or line lugs.
C. Examine walls, floors, roofs, and concrete bases for suitable mounting conditions where transformers will be installed.
D. Verify that ground connections are in place. Maximum ground resistance shall be 5 ohms at location of transformer.
E. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Install transformers on concrete bases.
1. Anchor transformers to concrete bases according to manufacturer's written instructions, seismic codes at Project, and requirements in Division 26 Section "Hangers and Supports for Electrical Systems."
2. Construct concrete bases of dimensions indicated, but not less than 6 inches (100 mm) larger in both directions than supported unit and 4 inches (100 mm) high.
3. Use 3000-psi (20.7-MPa), 28-day compressive-strength concrete and reinforcement ."
4. Install dowel rods to connect concrete bases to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around full perimeter of base.
5. Install epoxy-coated anchor bolts, for supported equipment, that extend through concrete base and anchor into structural concrete floor.
6. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
7. Tack-weld or bolt transformers to channel-iron sills embedded in concrete bases. Install sills level and grout flush with floor or base.
B. Maintain minimum clearances and workspace at equipment according to manufacturer's written instructions and NFPA 70.
261200 - 5 MEAD & HUNT, Inc.
3.3 IDENTIFICATION
A. Identify field-installed wiring and components and provide warning signs.
3.4 FIELD QUALITY CONTROL
A. Perform the following field tests and inspections and prepare test reports:
1. After installing transformers but before primary is energized, verify that grounding system at substation is tested at specified value or less.
2. After installing transformers and after electrical circuitry has been energized, test for compliance with requirements.
3. Perform visual and mechanical inspection and electrical test stated in NETA ATS. Certify compliance with test parameters.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
B. Remove and replace malfunctioning units and retest as specified above.
C. Test Reports: Prepare written reports to record the following:
1. Test procedures used.
2. Test results that comply with requirements.
3. Test results that do not comply with requirements and corrective actions taken to achieve compliance with requirements.
3.5 FOLLOW-UP SERVICE
A. Voltage Monitoring and Adjusting: If requested by Owner, perform the following voltage monitoring after Substantial Completion but not more than six months after Final Acceptance:
1. During a period of normal load cycles as evaluated by Owner, perform seven days of three-phase voltage recording at secondary terminals of each transformer. Use voltmeters with calibration traceable to National Institute of Science and Technology standards and with a chart speed of not less than 1 inch (25 mm) per hour. Voltage unbalance greater than 1 percent between phases, or deviation of any phase voltage from nominal value by more than plus or minus 5 percent during test period, is unacceptable.
2. Corrective Actions: If test results are unacceptable, perform the following corrective actions, as appropriate:
a. Adjust transformer taps.
b. Prepare written request for voltage adjustment by electric utility.
3. Retests: After corrective actions have been performed, repeat monitoring until satisfactory results are obtained.
4. Report: Prepare written report covering monitoring and corrective actions performed.
END OF SECTION
File details come from the government source that posted it. Updated .