Question Document 1.0 W912J2-26-R-A011 Repair Airlfield Lighting System 14Jul26.docx

DOCX document 16 KB Posted

Attached to
Repair Airfield Lighting System Volk Field CRTC
Solicitation number
W912J226RA011
Issued by

About this file

This is a Questions and Responses document for Solicitation W912J2-26-R-A011 addressing clarifications on roof insulation specifications for the Repair Airfield Lighting System project at Volk Field Air National Guard Base. The document addresses a single submitted question regarding conflicting insulation requirements noted across multiple drawing details and construction specifications for the standing seam metal roof vault.

The government's response clarifies that the authoritative insulation specification is found on the Overall Roof Plan, Detail 1/AS-101, which requires two layers of 2.6-inch polyisocyanurate insulation for the roof deck. The government indicates that blanket insulation specifications referenced in section 07 61 42 (Steel Standing Seam Roofing) are incorrect and should be disregarded in favor of the polyisocyanurate roof deck insulation detailed on the drawings. The government notes that the latest corrected drawing set labeled "March 6th, 2026 (Revised)" has been uploaded to sam.gov to resolve these inconsistencies. This clarification ensures contractors understand the precise insulation system required for this fixed-price construction contract valued between $10 million and $15 million, with a project duration of 510 calendar days.

View the file

Other files

File Type Posted
Question Document 6.0 W912J2-26-R-A011 Repair Airlfield Lighting System 06 Aug 26.docx DOCX document
Question Document 5.0 W912J2-26-R-A011 Repair Airlfield Lighting System 04 Aug 26.docx DOCX document
Revised CG113 - 073126.pdf PDF
Question Document 4.0 W912J2-26-R-A011 Repair Airlfield Lighting System 31Jul26.docx DOCX document
Solicitation Amendment W50S9H26RA0110001 SF 30.pdf PDF
Question Document 3.0 W912J2-26-R-A011 Repair Airlfield Lighting System 24Jul26.docx DOCX document
Solicitation Amendment - W50S9H26RA0110001.pdf PDF
Question Document 2.0 W912J2-26-R-A011 Repair Airlfield Lighting System 24Jul26.docx DOCX document
MFR Liquidated Damages YAQF192039 Repair Airfield Lighting rev 1.pdf PDF
APPENDIX G - EXHIBITS 22JUL2026.pdf PDF
Site Visit PreProposal Conference Sign In Sheet 15 July 2026.pdf PDF
RFP Pre-proposal slides W912J2-26-R-A011 final.pptx PPTX presentation
ATTACHMENT B - Design Drawings YAQF192039 Volk Field CRTC_Repair Airfield Lighting REVISED Submittal Plans 06-30-26.pdf PDF
APPENDIX G - EXHIBITS.pdf PDF
SFS Form1 - Blank.pdf PDF
ATTACHMENT F - YAQF192039 REPAIR AIRFIELD LIGHTING SYSTEM - Single Source Doc - Cummins Power Generation.pdf PDF
ATTACHMENT E - YAQF192039 REPAIR AIRFIELD LIGHTING SYSTEM - Single Source Doc - Monaco Fire Alarm.pdf PDF
ATTACHMENT G - YAQF192039 REPAIR AIRFIELD LIGHTING SYSTEM - Single Source Doc - Best Access Systems Locks and Cores.pdf PDF
ATTACHMENT B - Design Drawings - YAQF192039 Volk Field CRTC_Repair Airfield Lighting Final Plans 03-06-26.pdf PDF
Solicitation - W50S9H26RA011 Standard Form 1442 8Jul26.pdf PDF
ATTACHMENT C - Hazardous Materials Assessment - 2601801_VolkField-ElectricalVaultBuilding-HMA Report-FINAL_2026_05_04.pdf PDF
APPENDIX G - EXHIBITS.pdf PDF
ATTACHMENT A - General Requirement and Technical Specifications - YAQF192039 Volk Field Repair Airfield Lighting Revised 30Jun26.pdf PDF
ATTACHMENT D - Wage Determination - WD WI20260011 05182026.txt TXT text file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W50S9H-26-R-A011 Repair Air Field Lighting System Questions and Responses dated 7/14/26

1. Please provide clarification regarding the roof insulation for the standing seam metal roof at the vault. Sheet AS-311 Detail 1 calls out (2) layers of 2.6” iso, Detail 2 on AS-311 calls out 6” of rigid insulation. Additionally, the standing seam spec talks about flexible faced blanket mineral wool with R-40. If we do the 2 layers of 2.6” iso, that will give an R30 and will be 5.2” thick and doesn’t align with the other detail or specifications. Can you provide clarification and direction on the desired insulation system at the roof of the vault?

Government Response:

**** the latest drawing set is being uploaded to sam.gov solicitation which is labeled “March 6th, 2026 (Revised)”.

1. Roof deck insulation thickness is not noted on Details 1 & 2/AS-311. Insulation thickness is noted on the Overall Roof Plan, Detail 1/AS-101 which states the insulation shall be (2) layers of 2.6” polyisocyanurate.

2. Blanket insulation specified in section 07 61 42 – Steel Standing Seam Roofing is incorrect. Provide polyisocyanurate roof deck insulation noted on the drawings.

File details come from the government source that posted it. Updated .