AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update PWS sections (1.6.15; 1.6.16; 5.3; 5.3.1.1; 5.4 (table)), delete FAR 52.211-18, and include a list of buildings w ith square footage.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-17-R-0002
X 9B. DATED (SEE ITEM 11)
10-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2016
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
AMENDMENT 2
-- PWS, Section 1.6.15 Phase-in Period, replace wording as the following:
1.6.15 Phase-In Period: The contractor shall take all actions necessary for a smooth transition of the contracted operations during Phase-In. The Government will make facilities available to the contractor for a maximum of 30 calendar days prior to the contract full performance start date for observation and for the Phase-In of full performance requirements of this contract. The contractor shall submit a site-specific Phase-In Plan within 14 calendar days after contract award, which includes comprehensive procedures for attaining full PWS performance within the time allowed herein. The Phase-In Plan shall establish procedures by which the contractor shall prepare to assume full responsibility for all areas outlined in the PWS at the end of the Phase-In Period.
-- PWS, Section 1.6.16 Phase-Out Period, replace wording as the following:
1.6.16 Phase-Out Period: The contractor shall develop a Phase-Out Plan to affect a smooth and orderly transfer of responsibility to a successor contractor and provide the plan to the Contracting Officer within six months prior to the end of the contract. The Phase-Out Plan shall, at a minimum, establish procedures to accomplish the following:
Transfer of control of Government-furnished property to the successor contractor.
Turn-in GFF.
Clean up of contractor work areas.
Security debriefings in accordance with AR 380-5 and AR 380-40, for personnel holding clearances.
Procedures notifying contractor personnel that the contractor is being replaced.
Procedures for removal of all incumbent contractor property.
Procedures for data and information transfer to the successor or the COR.
Other actions required for continuity of operations, as requested by the Government.
-- PWS, Section 5.3 Service Orders, include the following:
A SO that exceeds $2,500.00 of combined, labor, materials, and or subcontractor costs will require KO approval.
-- PWS, Section 5.3.1.1 Request for Proposal (RFP) Service Order (SO):
Replace
W912ES-17-R-0002
Water main, lateral, and sewer breaks (historical workload: approximately 5- 10 per year)
With Infrastructure repairs; railroad, secondary electrical services, water main, lateral, and sewer breaks (historical workload: approximately 5-10 per year)
-- PWS, Section 5.4 Preventive Maintenance, update Reduction In Payment (RIP) or Impact on CPARS table with the following:
26-A: The percentage of incomplete PMs will be deducted from the monthly invoiced amount for CLIN X006. Results will be reported in CPARS.
26-B: The percentage of incomplete PMs will be deducted from the monthly invoiced amount for CLIN X006. Results will be reported in CPARS.
26-E: 1% of the monthly invoiced amount for CLIN X006. Results will be reported in
CPARS.
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.211-18 Variation in Estimated Quantity APR 1984
(End of Summary of Changes)