Bond & Earth Testing –
Site:
Date: __________ Condition: __________ Testing Criteria: Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω, Bond Testing DA PAM 385-64 ≤1.0Ω Floor – TB 385-4 min 1 megohm/kilovolt Test Equipment: __________
Room 301 Ground Point:
Use a high-resistance measuring instrument.
Connect one electrode of the measuring instrument to the facility ground.
Connect the other electrode to a five-pound weight that has a contact surface of five square inches of good conducting material.
Attach a non-conductive strap or handle to the block.
Apply voltage Pull the block along all points of the floor or work surface under test to verify that the complete surface meets the minimum resistance requirement of one megohm per kilovolt.
Building Ground Resistance:
Locate and test one of the exterior grounding rods around the exterior of the building near the control tower.
Test Results:
Room 301: ____Pass _____ Fail
Ground Resistance: ____________
Notes:
Bond & Earth Testing -
Site: AP-01 Description of Site: Building 6050 Aircraft Maintenance Hanger Date: _________ Condition: ___________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω, Bond Testing DA PAM 385-64 ≤1.0Ω Test Equipment: ____________
6-1 Ω
6-2 Ω
6-3 Ω
6-4 Ω
6-5 Ω
6-7 Ω
6-8 Ω
6-9 Ω
6-10 Ω
10-Building Ground Ω
Ground Resistance: __________ Ω
Pass/Fail _______
Site: ASP-03 Description of Site:
Date: __________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: ________________
REF PT-1 REF PT-2 REF PT-3 REF PT-4 REF PT-5 REF PT-6
Ground Resistance: N/A
ASP-03 Interior Bonding Points
Site: ASP-04 Description of Site:
Date: ___________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: ______________
REF PT-1 REF PT-2 REF PT-3 REF PT-4 REF PT-5 REF PT-6 REF PT-7 REF PT-8
ASP-04 Front View
Site: ASP-07 Description of Site:
Date: ____________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: _______________
1-2
Ground Resistance: ____________ Ω
Site: ASP-09 Description of Site:
Date: ____________ Weather Conditions: _________________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Reference Point-1
Reference Point-2
Reference Point-3
Reference Point-4
Reference Point-5
Reference Point-6
Reference Point-7
Reference Point-8
ASP-09 Front View
Site: ASP-13 Description of Site:
Date: ____________ Weather Conditions: _______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: ___________________
Ground Wire-1 Ground Wire-2 Ground Wire-3 Ground Wire-4 Ground Wire-5 Ground Wire-6 Ground Wire-7 Ground Wire-8
Ground Resistance: _________ Ω
ASP-13 Front View
Site: ASP-14 Description of Site:
Date: ____________ Weather Conditions: ________________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
1-2 1-3 1-4 1-5 1-6 1-7 1-8
Ground Resistance: _______ Ω
ASP-14 Front View
Site: ASP-15 Description of Site:
Date: __________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Wire-
Ground Resistance: ________ Ω
ASP-15 Front View
Site: ASP-16 Description of Site:
Date: _________ Weather Conditions: _______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: _____________________
Door Hinge-1 Door Hinge-2 Door Hinge-3 Door Hinge-4 Door Hinge-5 Door Hinge-6 Door Hinge-7 Door Hinge-8 Door Hinge-9 Door Hinge-
Ground Resistance: _______ Ω
ASP-16 Front View
Site: CF-03 Description of Site:
Date: _______________ Weather Conditions: _______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
1-2 1-3 of Site:
Condition: __________ Testing Criteria: Per NFPA70B, TM5-684 - Ground Resistance ≤25.0 Ω, Bond Testing DA PAM 385-64 ≤1.0Ω Floor – TB 385-4 min 1 megohm/kilovolt Test Equipment: __________
Room 145 Floor:
Use a high-resistance measuring instrument.
Connect one electrode of the measuring instrument to the facility ground.
Connect the other electrode to a five-pound weight that has a contact surface of five square inches of good conducting material.
Attach a non-conductive strap or handle to the block.
Apply voltage Pull the block along all points of the floor or work surface under test to verify that the complete surface meets the minimum resistance requirement of one megohm per kilovolt.
Building Ground Resistance:
Locate and test one of the exterior grounding rods around the exterior of the building.
Room 145: ____Pass _____ Fail
Ground Resistance: ____________
Site: AP-03 Description of Site:
Date: _________ Weather Conditions: ____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
NFPA 407 - <25 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω.
Test Results
Ground Resistance (Point A-GROUND): DISP1_________ DISP2_________ DISP3__________ DISP4__________
Notes:
DISP1 DISP1 DISP1 DISP2 DISP2 DISP2 DISP3 DISP3 DISP3 DISP4 DISP4 DISP4
A-B B-C D-E A-B B-C D-E A-B B-C D-E A-B B-C D-E
Site: AP-05 Description of Site: U-Fuel Tank Date: __________ Weather Conditions: ____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Ground Resistance: __________
Note:
Site: ASP-01 Description of Site:
Date: __________ Weather Conditions: ____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: ___________
1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12
Ground Resistance: _______
ASP-01 Front View
Site: ASP-03 Description of Site:
Date: ____________ Weather Conditions: ______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: _________________
1-2 1-3 1-4
Ground Resistance: __________________
Site: ASP-05 Description of Site:
Date: ____________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Ground Resistance: ______ Ω
Site: ASP-06 Description of Site:
Date: _____________ Weather Conditions: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: _____________
1-2 1-3 1-4 1-5
Site: ASP-08 Description of Site:
Date: ___________ Weather Conditions: ________________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: __________________
Site: ASP-10 Description of Site:
Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
ASP-10 Front View
Site: ASP-12 Description of Site:
Date: ____________ Weather Conditions: ______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: ____________________
Ground Wire-1 Ground Wire-2 Ground Wire-3 Ground Wire-4 Ground Wire-5 Ground Wire-6 Ground Wire-7 Ground Wire-8
ASP-11 Front View
Site: ASP-12 Description of Site:
Date: _____________ Weather Conditions: ________________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: _________________
Ground Resistance: ________ Ω
ASP-12 Front View
Site: AP-02 Description of Site: Building 6050 Tanker Points Date: ___________ Weather Conditions: ________________________ Testing Criteria: Per NFPA 780 – Ground Resistance ≤25.0 Ω, Ground Resistance:
1 2 3 4 5 6 N/A
Note:
Site: CF-01 Description of Site:
Date: __________ Weather Conditions: ______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Bond Testing DA PAM 385-64 ≤1.0Ω Test Equipment: ______________
Test Results:
Ground Resistance (10 – Ground): _______ Ω
Ground Resistance (19 - Ground): _______ Ω
Ground Resistance (31 - Ground): _______ Ω
Notes:
1-2 1-3 4-5 4-6 7-8 7-9 11-10 11- 12 16-17 16-18 19-20 19-21 22-23
22-24 22-19 19-16 7-4 4-1 25-26 27-28 29-30 31-32 21-6 26-27 30-31 28-29
Site: CF-02 Description of Site:
Date: ____________ Weather Conditions: ____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
1-2 1-3 4-5 4-6
Site: SPC-01 Description of Site: Building #6250 Date: _______________ Weather Conditions: ______________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Ground Resistance: ___________ Ω
Site: AP‐04
Description of Site: Building 6058
Weather Conditions: ____________
R ‐ Reference point connected to building steel near Point 1 Test Results (ohms):
R‐1 R‐2 R‐3 R‐4 R‐5 R‐6 R‐7 R‐8 R‐9 R‐10 R‐11 R‐12 R‐13 R‐14 R‐15 R‐16 R‐17 R‐18
NA NA NA NA NA NA
Site: AP-06 Description of Site:
Date: ___________ Weather Condition: _____________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
NFPA 407 - <25 Ω
Building ground-
Building ground-
Building ground-
Building ground-
Building ground-
Building ground-
Building ground-
Building ground-
Building ground-
Ground Resistance: ________
Site: ASP-02 Description of Site:
Date: ___________ Weather Conditions: _________________ Testing Criteria: Per NFPA 780 - Ground Resistance ≤25.0 Ω
Test Equipment: __________________
Door Hinge-1 Door Hinge-2 Door Hinge-3 Door Hinge-4 Door Hinge-5 Door Hinge-6 Door Hinge-7 Door Hinge-8 Door Hinge-9 Door Hinge-
Ground Resistance: ______ Ω
ASP-02 Front View
| 02 TL 5-2.10 Earth Bond 29_Testing Report - Building 6058 Control Tower |
| 02 TL 5-2.10 Earth Bond 1_01 Airport 6050 |
| 02 TL 5-2.10 Earth Bond 10_03 Testing Report - ASP 9005 Inside |
| 02 TL 5-2.10 Earth Bond 11_04 Testing Report - ASP 9004 |
| 02 TL 5-2.10 Earth Bond 13_07 Testing Report - ASP 9016 |
| 02 TL 5-2.10 Earth Bond 15_09 Testing Report - ASP 9011 |
| 02 TL 5-2.10 Earth Bond 19_13 Testing Report - ASP 9013 |
| 02 TL 5-2.10 Earth Bond 20_14 Testing Report - ASP 9026 |
| 02 TL 5-2.10 Earth Bond 21_15 Testing Report - ASP 9014 |
| 02 TL 5-2.10 Earth Bond 22_16 Testing Report - ASP 9007 |
| 02 TL 5-2.10 Earth Bond 25_03 Testing Report - Tank Farm Area |
| 02 TL 5-2.10 Earth Bond 26_01 Testing Report - NDB |
| 02 TL 5-2.10 Earth Bond 28_Testing Report - Building 200 |
| 02 TL 5-2.10 Earth Bond 3_03 Testing Report - Airport 6050 Refueling |
| 02 TL 5-2.10 Earth Bond 5_05 Testing Report - Airport 6058 UFuel |
| 02 TL 5-2.10 Earth Bond 7_01 Testing Report - ASP 9003 |
| 02 TL 5-2.10 Earth Bond 9_03 Testing Report - ASP 9005 Outside |
| 02 TL 5-2.10 Earth Bond 11_05 Testing Report - ASP 9015 |
| 02 TL 5-2.10 Earth Bond 12_06 Testing Report - ASP 9018 |
| 02 TL 5-2.10 Earth Bond 14_08 Testing Report - ASP 9017 |
| 02 TL 5-2.10 Earth Bond 16_10 Testing Report - ASP 9024 |
| 02 TL 5-2.10 Earth Bond 17_11 Testing Report - ASP 9012 |
| 02 TL 5-2.10 Earth Bond 18_12 Testing Report - ASP 9025 |
| 02 TL 5-2.10 Earth Bond 2_02 Report - Airport 6050 Tanker |
| 02 TL 5-2.10 Earth Bond 23_01 Testing Report - Fuel Dispensing Area |
| 02 TL 5-2.10 Earth Bond 24_02 Testing Report - Track Vehicle Refuling |
| 02 TL 5-2.10 Earth Bond 27_01 Testing Report - SPC 6250 |
| 02 TL 5-2.10 Earth Bond 4_04 Testing Report - Airport 6058-Hanger |
| 02 TL 5-2.10 Earth Bond 6_06 Testing Report - Airport 6010 |
| 02 TL 5-2.10 Earth Bond 8_02 Testing Report - ASP 9006 |
File details come from the government source that posted it. Updated .