02_TL_5.4_PM_Task_and_Freq_Chart_(27_Oct_16).xls

XLS spreadsheet 249 KB Posted

Attached to
Facilities Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES-17-R-0002
Issued by

About this file

02 TL 5.4 PM

View the file

Other files

File Type Posted
Amendment_3_.pdf PDF
02_TL_54_PM_Task_and_Freq_Chart_(18_Nov_16).xls XLS spreadsheet
Equipment_List_12-1-16.xlsx XLSX spreadsheet
BUILDING_LIST___21NOV16.xlsx XLSX spreadsheet
Amendment_2_.pdf PDF
01_TE_1.4.3_Workload_Data_(14_Nov_16).xlsx XLSX spreadsheet
01_TE_3-1_GFE_(29JAN2016).xlsx XLSX spreadsheet
02_TL_5_4_PM_Task_and_Freq_Chart_.xls XLS spreadsheet
Amendment_1_.pdf PDF
Site_Visit_Sign_In_Sheet_.pdf PDF
02_TL_5.4.4_Fire_Supp_(Dry_Pipe)_(18_FEB_16).xlsx XLSX spreadsheet
02_TL_4.7_WI_SALES_TAX_EXEMPT_FORM_.pdf PDF
02_TL_5.4.9_Cathodic_Protection_Testing.pdf PDF
02_TL_5.3.18b__Facility_Deactivation_(16AUG16).docx DOCX document
01_TE_3.2_GFF_(Post_B2108_Renovation).xlsx XLSX spreadsheet
MCC_Form_451.xlsx XLSX spreadsheet
00_PRS_Schedule_(7SEP16).xlsx XLSX spreadsheet
02_TL_5.4.1_Fire_Supp_(Ansul-Chemical).xlsx XLSX spreadsheet
Questionnaire_Attachment_.pdf PDF
01_CBA_FMC_2014-2017.pdf PDF
02_TL_5.4.5_Fire_Alarm_System.docx DOCX document
01_TE_1.4.3_Workload_Data_(31OCT16)_.xlsx XLSX spreadsheet
01_TE_3.2__GFF_(27_Oct_16).doc DOC document
02_TL_5.3.17Generator_Log_9-20-2016.xlsx XLSX spreadsheet
02_TL_1.2_3rd_Qtr_FY16.xlsx XLSX spreadsheet
02_TL_5.5_Ice_Melt_Report.xls XLS spreadsheet
Solicitation_.pdf PDF
01_TE_1.6.5_PRS_Description_FM_(18_Jul_16).doc DOC document
02_TL_5.4.6_Elevators_and_Lifts_(13_JUL_16).xlsx XLSX spreadsheet
02_TL_5.4.7_Water_System.pdf PDF
AR_420_1.pdf PDF
01_TE_3.3_GFP_Automation_(6SEP16).xlsx XLSX spreadsheet
01_TE_1.3_DSL_FM_(27_Oct_16).xlsx XLSX spreadsheet
FAC_MAINT_SCA-CBA_Employees.xlsx XLSX spreadsheet
01_TE_1.4.3_Workload_Table_(24_OCT_16).xls XLS spreadsheet
02_TL_5.4.2_Fire_Supp_(Kitchen_Hood_Cleaning).docx DOCX document
02_TL_1.6.12_HVAC_Qualifier.pdf PDF
02_TL_1.6_DD254_Contract_Security_Class_Spec.pdf PDF
02_TL_5.3.5_Facility_Standards.docx DOCX document
02_TL_5.3.18a_Facility_Activation_(16AUG16).docx DOCX document
02_TL_4.5b_Gen_tank_insp_Form_372.xlsx XLSX spreadsheet
02_TL_5.4.8_Earth_Bond_Testing.pdf PDF
02_TL_4.5a_TR-WM-118.pdf PDF
02_TL_5.4.3_Fire_Supp_(Wet_Pipe)_(13_JUL_16).xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TL 5.4 PM TASK-FREQ

SECTION B - PM PRICING
Updated 10/27/2016
PREVENTIVE MAINTENANCE - (Includes all labor, travel, clean up and any other support necessary to complete preventive maintenance IAW this TL 5-4.1 Task & Frequency Chart and as indicated in manufacturers recommendations. (Provide costs by equipment type. Assumes 1 person and .25 hr travel time.)
NOTE: Some tasks shown below may be performed during more than one PM frequency. This will affect the PM Task/Year count by Frequency. (i.e. "Change filters and belts." may appear under Bi-Monthly as a task for that frequency and then appear again under Annually as a task for that frequency. Because this Bi-monthly task is being accomplished under the Annual frequency, one less PM Task/Year will be counted under the Bi-Monthly.
NOTE: While performing Preventive Maintenance, report to the Government Work Reception Center at the time of discovery any deficiency requiring repair that is not part of the scheduled PM or that cannot be corrected at the time of the PM.
CLIN XXXXDESCRIPTIONTASKFREQUENCYEQUIP QTYPM'S / YEARTYPE
(= FREQ COL)# EQUIPMENT PM'SEQUIP TOTALS
AIR HANDLING AND VENTILATION EQUIPMENT
EQUIP TYPE
AHUAIR HANDLER UNDER 5,000 CFM to 50,000 CFM116116
Quarterly1163Quarterly348
1. Check and record water inlet and outlet water temperature and air inlet and outlet temperature on Operating Log.Quarterly
2. Check all controls and thermostats for proper operation.Quarterly
3. Check to ensure that Occupied/Unoccupied mode is set correctly.Quarterly
4. Change filters/ check belts.Quarterly
5. Check bearings and lubricate.Quarterly
6. Ensure all dampers operate correctly with controls.Quarterly
7. Clean outside air intake screens and louvers of debris.Quarterly
8. Lubricate louvers and linkages.Quarterly
9. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable.Quarterly
10. Clean and secure mechanical room.Quarterly
11. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly
Annually1161Annually116
1. Check and record water inlet and outlet water temperature and air inlet and outlet temperature on Operating Log.Annually
2. Check all controls and thermostats for proper operation.Annually
3. Check to ensure that Occupied/Unoccupied mode is set correctly.Annually
4. Change filters, if necessary.Annually
5. Replace belts.Annually
6.. Check bearings and lubricate.Annually
7. Ensure all dampers operate correctly with controls.Annually
8. Clean outside air intake screens and louvers of debris.Annually
9. Lubricate louvers and linkages.Annually
10. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable.Annually
11. Clean heating and cooling coil and all other interior and exterior components.Annually
12. Clean and secure mechanical room.Annually
13. COMPLETE AND SIGN MAINTENANCE TAG.Annually
DHUMIDDEHUMIDIFIER31Annually33
1. Check operating controls for proper operation.Annually
(ONLY 1 IN ARMS VAULT B2197)2. Clean filters, replace if necessary.Annually
3. Clean desiccant media or replace if necessary.Annually
4. Inspect rotor,drive belt, and motors. Clean if necessary.Annually
5. Check to insure all seals are functioning as required.Annually
6. Clean all unit components, interior and exterior.Annually
7. Clean up work area.Annually
8. COMPLETE AND SIGN MAINTENANCE TAG.Annually
ERVENERGY/HEAT RECOVERY VENTILATOR5050
Quarterly503Quarterly150
1. Clean or replace filters.Quarterly
2. Check fan and motor for proper operation.Quarterly
3. Clear debris from outdoor intake and exhaust screens/louvers/hoods.Quarterly
4. Clean up work area.Quarterly
5. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly
Annually501Annually50
1. Clean or replace filters.Annually
2. Check fan and motor for proper operation.Annually
3. Clear debris from outdoor intake and exhaust screens/louvers/hoods.Annually
4. Clean exterior and interior of cabinet and all components of the unit.Annually
5. Clean condensate drain if applicable.Annually
EXFFAN (EXHAUST, RETURN, OR SUPPLY)585585
Semi-Annually5851Semi-Annually585
1. Check bearings and motor. Lubricate.Semi-Annually
2. Check louvers, lubricate linkage and actuators for proper operation if applicable.Semi-Annually
3. Check for proper operation of controls.Semi-Annually
4. Clean up work area.Semi-Annually
5. COMPLETE AND SIGN MAINTENANCE TAG.Semi-Annually
Annually5851Annually585
1. Grease bearings/ oil motor.Annually
2. Check louvers, lubricate linkage and actuators for proper operation if applicable.Annually
3. Check for proper operation of controls.Annually
4. Check belts/ bearings.Annually
5. Clean all unit components, interior and exterior.Annually
6. Clean up work area.Annually
7. COMPLETE AND SIGN MAINTENANCE TAG.Annually
6. Clean up work area.Annually
FILTERAHU/FURNACE/AC FILTERS22022Weekly4840220
FOBS-Weekly (April thru September)1. Check/replace filtersWeekly
2. Clean up work area.
3. COMPLETE AND SIGN MAINTENANCE TAG.Weekly
AHU/FURNACE/AC FILTERS428Monthly33642
B 207 and 17921. Check/replace filtersMonthly
2. Clean up work area.Monthly
3. COMPLETE AND SIGN MAINTENANCE TAG.Monthly
HRVHEAT RECOVERY UNIT22
Quarterly23Quarterly6
1. Clean or replace filters.Quarterly
2. Check fan and motor for proper operation.Quarterly
3. Clear debris from outdoor intake and exhaust screens/louvers/hoods.Quarterly
4. Clean up work area.Quarterly
5. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly
Annually21Annually2
1. Clean or replace filters.Annually
2. Check fan and motor for proper operation.Annually
3. Clear debris from outdoor intake and exhaust screens/louvers/hoods.Annually
4. Clean exterior and interior of cabinet and all components of the unit.Annually
5. Clean condensate drain if applicable.Annually
6. Clean up work area.Annually
7. COMPLETE AND SIGN MAINTENANCE TAG.Annually
HUMIDIFIERHUMIDIFIER12012
121Annually12
1. Check humidifier for proper operation.Annually
2. Clean inside of humidifier and drain hose.Annually
3. Change evaporation media (evaporator pad).Annually
4. Check solenoid valve for proper operation.Annually
5. Check to ensure water is flowing properly over the evaporator pad.Annually
6. Check for leaks.Annually
7. Clean up work area.Annually
8. COMPLETE AND SIGN MAINTENANCE TAG.Annually
HVAC DRIVEUH HVAC DRIVES12Semi Annually21
1. Check replace R7/R8enclosure inlet air filterSemi Annual
2. Check/replace R7/R8 enclosure exhaust air filterSemi Annual
3. Check and clean heatsinkSemi Annual
4. Check cable connections are secure and tighten as specifiedSemi Annual
5. Clean up work area.Semi Annual
6. COMPLETE AND SIGN MAINTENANCE TAG.Semi Annual
HYDSYSHYDRONIC SYSTEM FEEDER112Monthly121
B 2071. Check the fluid level in the storage tank for the correct levelMonthly
2. Visually examine the SF 100 to ensure it is clean and all joints are tightMonthly
3. Check the strainer on the bottom of the suction hose inside the tankMonthly
4. Clean up work area.Monthly
5. COMPLETE AND SIGN MAINTENANCE TAG.Monthly
COOLING EQUIPMENT
MINICOMPAC IN COMPUTER/SRVR RM, FREE STANDING

(Air or water cooled, split & non-split)

(example: Bldgs 1564, 1941)55
Quarterly53Quarterly15
1. Change filters.Quarterly
2. Check belts for wear, appropriate tension and alignment as applicable. Replace if necessary.Quarterly
3. Check blower motor.Quarterly
4. Check safety features.Quarterly
5. Check for proper operation.Quarterly
6. Clean up work area.Quarterly
7. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly
Annually51Annually5
1. Change filters.Annually
2. Check belts for wear, appropriate tension and alignment as applicable. Replace if necessary.Annually
3. Check blower motor.Annually
4. Check safety features.Annually
5. Check for proper operation.Annually
6. Clean condenser and evaporator coils.Annually
7. Straighten fin tubes with fin comb.Annually
8. Check electrical connections for tightness.Annually
9. Check mounting for tightness.Annually
10. Check contactors for burnt contacts.Annually
11. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.Annually
12. Check fan blade(s) and/or wheel(s) as applicable.Annually
13. Check wires at condenser electrical fused safety switches for tightness and burned insulation.Annually
14. Lubricate bearings (if applicable) and motor(s).Annually
15. Check refrigerant charge.Annually
16. Check condensate pans and drains.Annually
17. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable-replace as needed.Annually
18. Run unit, check action of controls, relays, switches, TXV valve (if applicable), etc.Annually
19. Check and clean strainers, if applicable.Annually
20. Clean unit components, interior and exterior.Annually
21. Clean up work area.Annually
22. COMPLETE AND SIGN MAINTENANCE TAG.Annually
ACONAC UNIT, WINDOW, WALL, OR CEILING MOUNTED (MINI SPLIT SYSTEMS W/COND ON PAD)7373
Semi-AnnuallyTypical timeframe: April & July731Semi-Annually73
1. Clean filter or replace if necessary.Semi-Annually
2. Remove debris from air screen and condenser unit, and clean underneath and around unit.Semi-Annually
3. Clean up work area.Semi-Annually
4. COMPLETE AND SIGN MAINTENANCE TAG.Semi-Annually
Annually-springTypical timeframe:
April - June731Annually73
1. Clean filter or replace if necessary.Annually
2. Remove debris from air screen and condenser unit, and clean underneath and around unit.Annually
3. Clean condenser and evaporator coils.Annually
4. Straighten fin tubes with fin comb.Annually
5. Check electrical connections for tightness.Annually
6. Check mounting for tightness.Annually
7. Check contactors for burnt contacts.Annually
8. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.Annually
9. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary.Annually
10. Check wires at condenser electrical fused safety switches for tightness and burned insulation.Annually
11. Lubricate bearings (if applicable) and motor(s).Annually
12. Check refrigerant charge.Annually
13. Check condensate pans and drains.Annually
14. Visually inspect for proper insulation on refrigerant lines and water lines.Annually
15. Check compresser crank case heater for proper operation (if applicable).Annually
16. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable).Annually
17. Clean unit components, interior and exterior.Annually
18. Clean up work area.Annually
19. COMPLETE AND SIGN MAINTENANCE TAG.Annually
CHILRCHILLER, CENTRAL PKG, WATER UNIT 30-150 Tons44
Typical timeframe:

April - October (7 months)

Weekly46Months24
1. Check oil level and/or pressure. Record on Operating Log.Weekly
2. Check refrigerant charge. Record on Operating Log.Weekly
3. Check temperature and pressure gauges for proper operation.Weekly
4. Check return air and supply air temperatures, and record readings on Operating Log.Weekly
5. Check suction and discharge pressures in accordance with manufacturer's recommended levels.Weekly
6. Clean exterior debris screen and condenser coils of leaves, grass, and other debris.Weekly
7. Check bearings and fan blades on condenser unit motor.Weekly
8. Check water pressure of entering evaporator water and leaving evaporator water, and record on Operating Log. Should be operating within the manufacturer's suggested range.Weekly
9. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable.Weekly
10. Perform visual check of any fluid or gas leaks.Weekly
11. Complete Maintenance Log to reflect any repairs that are made.Weekly
12. Clean and secure mechanical room.Weekly
13. COMPLETE AND SIGN MAINTENANCE TAG.Weekly
Annually (Chiller Activation)Typical Timeframe: April41Annually (when activated) / Typical Timeframe: April4
1. Follow manufacturer's start-up procedures and complete start-up and operating logs as applicable at time system is first activated for the cooling season. If any system operating deficiencies are discovered at start-up, report corrective actions needed to the Government Work Reception Center immediately.Annually (when activated)
2. Clean condenser and evaporator coils (fins) or chiller bundle, if applicable, with coil cleaner.Annually (when activated)
3. Check for system leaks using dye or electronic leak detector.Annually (when activated)
4. Conduct acid test of refrigerent oil, change oil and filter dryer if acidic. Record on Operating Log.Annually (when activated)
5. Lube all bearings and motors if applicable.Annually (when activated)
6. Check for proper operation in accordance with maunufacturer's recommended levels.Annually (when activated)
7. Check all wiring connections for tightness.Annually (when activated)
8. Check all contactors for burned contacts.Annually (when activated)
9. Check loop pumps.Annually (when activated)
10. Clean all in-line strainers.Annually (when activated)
11. For closed loop chilled water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) closed cooling loop. Test for ph, nitrates, oxygen, bacteria, and conductivity (total dissolved solids) and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government.Annually (when activated)
12. Inspect flow switches for proper operation.Annually (when activated)
13. Check oil level and/or pressure. Record on Operating Log.Annually (when activated)
14. Check refrigerant charge. Record on Operating Log.Annually (when activated)
15. Check temperature and pressure gauges for proper operation.Annually (when activated)
16. Check return air and supply air temperatures, and record readings on Operating Log.Annually (when activated)
17. Check suction and discharge pressures in accordance with manufacturer's recommended levels.Annually (when activated)
18. Clean exterior debris screen and condenser coils of leaves, grass, and other debris.Annually (when activated)
19. Check bearings and fan blades on condenser unit motor.Annually (when activated)
20. Check water pressure of entering evaporator water and leaving evaporator water, and record on Operating Log. Should be operating within the manufacturer's suggested range.Annually (when activated)
21. Check compresser crank case heater for proper operation (if applicable).
22. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable.Annually (when activated)
23. Perform visual check of any fluid or gas leaks.Annually (when activated)
24. Complete Maintenance Log to reflect any repairs that are made.Annually (when activated)
25. Clean unit components, interior and exterior.Annually (when activated)
26. Clean and secure mechanical room.Annually (when activated)
27. COMPLETE AND SIGN MAINTENANCE TAG.Annually (when activated)
Annually (Chiller Deactivation)Typical Timeframe: October41Annually (when deactivated) / Typical Timeframe: October4
1. Follow manufacturer's shut-down procedures at time system is deactivated at the end of the cooling season. If any system operating deficiencies are discovered at shut-down, report corrective actions needed to the Government Work Reception Center immediately.Annually (when deactivated)
2. Complete Operating Log.Annually (when deactivated)
3. Clean and secure mechanical room.Annually (when deactivated)
4. COMPLETE AND SIGN MAINTENANCE TAG.Annually (when deactivated)
CONDCONDENSING UNIT 20 TONS OR LESS
(connected to a separate furnace unit)686686
Annually-springTypical timeframe:
April - June6861Annually686
1. Remove debris from air screen and condenser unit, and clean underneath and around unit.Annually
2. Clean condenser and evaporator coils.Annually
3. Straighten fin tubes with fin comb.Annually
4. Check electrical connections for tightness.Annually
5. Check mounting for tightness.Annually
6. Check contactors for burnt contacts.Annually
7. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.Annually
8. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary.Annually
9. Check wires at condenser electrical fused safety switches for tightness and burned insulation.Annually
10. Lubricate bearings (if applicable) and motor(s).Annually
11. Check refrigerant charge.Annually
12. Check condensate pans and drains.Annually
13. Visually inspect for proper insulation on refrigerant lines.Annually
14. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable).Annually
15. Clean unit components, interior and exterior.Annually
16. Clean up work area.Annually
17. COMPLETE AND SIGN MAINTENANCE TAG.Annually
HEATPUMPHEAT PUMP <= 5 TONS
(connected to a separate furnace unit)7474
Semi-Annually-fallTypical timeframe: October741Semi-Annually74
1. Remove debris from air screen and condenser unit, and clean underneath and around unit.Semi-Annually
2. Check condenser and evaporator coils.Semi-Annually
3. Check operation of solenoid valves (refrigerant).Semi-Annually
4. Clean up work area.Semi-Annually
5. COMPLETE AND SIGN MAINTENANCE TAG.Semi-Annually
Annually-springTypical timeframe:
April - June741Annually74
1. Remove debris from air screen and condenser unit, and clean underneath and around unit.Annually
2. Clean condenser and evaporator coils.Annually
3. Check operation of solenoid valves (refrigerant).Annually
4. Straighten fin tubes with fin comb.Annually
5. Check electrical connections for tightness.Annually
6. Check mounting for tightness.Annually
7. Check contactors for burnt contacts.Annually
8. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary.Annually
9. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary.Annually
10. Check wires at condenser electrical fused safety switches for tightness and burned insulation.Annually
11. Lubricate bearings (if applicable) and motor(s).Annually
12. Check refrigerant charge.Annually
13. Check condensate pans and drains.Annually
14. Visually inspect for proper insulation on refrigerant lines.Annually
15. Check compresser crank case heater for proper operation (if applicable).Annually
16. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable).Annually
17. Clean unit components, interior and exterior.Annually
18. Clean up work area.Annually
19. COMPLETE AND SIGN MAINTENANCE TAG.Annually
VAVVARIABLE AIR VOLUME BOXES7979
Semi-AnnuallyTypical timeframe: April and October.792Semi-Annually158
1. Test and check operation of control valves, sensors, and air dampers.Semi-Annual
2. Adjust controls as necessary to ensure proper operation.Semi-Annual
3. Clean unit components, interior and exterior.Semi-Annual
4. Clean up work area.Semi-Annual
5. COMPLETE AND SIGN MAINTENANCE TAG.Semi-Annual
HEATING EQUIPMENT
GBOILBOILER, GAS, HOT WATER, W/ML, 701 to 1,000 MBTUH66
(MUD/WATER LEGS ACCESSIBLE = W/ML)
Bi-WeeklyTypical timeframe:
September-April (8 months)614Monthly - Typical timeframe: Sept - Apr (8 mos)84
1. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Bi-Weekly
2. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Bi-Weekly
3. Inspect all limit and operating controls to ensure proper operation.Bi-Weekly
4. Inspect circulating pumps on boiler.Bi-Weekly
5. Inspect for proper combustion air.Bi-Weekly
6. Visually inspect for proper insulation on water lines.Bi-Weekly
7. Clean and secure mechanical room.Bi-Weekly
8. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Weekly
Annually61Annually6
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Annually
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Annually
3. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Annually
4. Inspect all limit and operating controls to ensure proper operation.Annually
5. Inspect circulating pumps on boiler.Annually
6. Inspect for proper combustion air.Annually
7. Visually inspect for proper insulation on water lines.Annually
8. Inspect burner and flue door gaskets.Annually
9. Inspect and clean cross and T fittings and piping.Annually
10. Inspect vent pipe and barometric damper.Annually
11. Inspect automatic/manual air vents for proper operation.Annually
12. Inspect condensate traps for proper operation (combustion chamber).Annually
13. Inspect and clean boiler flues, tubes, and combustion chamber.Annually
14. Clean pilot and burner.Annually
15. For closed loop hot water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems. Test for ph, alkalinity, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government.Annually
16. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion.Annually
17. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function.Annually
18. Inspect boiler drain valves for proper operation.Annually
19. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation.Annually
20. Check and grease gas cocks, check gas piping for leaks from cock to appliance.Annually
21. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log.Annually
22. Inspect and clean the low water sensing probe.Annually
23. Check for proper operation of expansion tank.Annually
24. Inspect flow switches for proper operation.Annually
25. Clean unit components, interior and exterior.Annually
26. Clean and secure mechanical room.Annually
27. Clean and flush mud/water legs.Annually
28. COMPLETE AND SIGN MAINTENANCE TAG.Annually
GBOILBOILER, GAS, HOT WATER, NO ML, 121 to 300 MBTUH12
GBOILBOILER, GAS, HOT WATER, NO ML, 0 to 300 MBTUH35
GBOILBOILER, GAS, HOT WATER, NO ML, 301 to 500 MBTUH5
GBOILBOILER, GAS, HOT WATER, NO ML, 501 to 700 MBTUH7
GBOILBOILER, GAS, HOT WATER, NO ML, 701 to 1,000 MBTUH7
GBOILBOILER, GAS, HOT WATER, W/ ML, 701 to 1,000 MBTUH8
(MUD/WATER LEGS NOT ACCESSIBLE = NO ML)7474
Typical timeframe:

September-April (8 months)

Bi-Weekly7414Bi-Weekly1036
1. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Bi-Weekly
2. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Bi-Weekly
3. Inspect all limit and operating controls to ensure proper operation.Bi-Weekly
4. Inspect circulating pumps on boiler.Bi-Weekly
5. Inspect for proper combustion air.Bi-Weekly
6. Visually inspect for proper insulation on water lines.Bi-Weekly
7. Clean and secure mechanical room.Bi-Weekly
8. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Weekly
Annually741Annually74
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Annually
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Annually
3. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Annually
4. Inspect all limit and operating controls to ensure proper operation.Annually
5. Inspect circulating pumps on boiler.Annually
6. Inspect for proper combustion air.Annually
7. Visually inspect for proper insulation on water lines.Annually
8. Inspect burner and flue door gaskets.Annually
9. Inspect and clean cross and T fittings and piping.Annually
10. Inspect vent pipe and barometric damper.Annually
11. Inspect automatic/manual air vents for proper operation.Annually
12. Inspect condensate traps for proper operation (combustion chamber).Annually
13. Inspect and clean boiler flues, tubes, and combustion chamber.Annually
14. Clean pilot and burner.Annually
15. For closed loop hot water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems. Test for ph, alkalinity, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government.Annually
16. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion.Annually
17. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function.Annually
18. Inspect boiler drain valves for proper operation.Annually
19. Bottom blow mud/water legs.Annually
20. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation.Annually
21. Check and grease gas cocks, check gas piping for leaks from cock to appliance.Annually
22. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log.Annually
23. Inspect and clean the low water sensing probe.Annually
24. Check for proper operation of expansion tank.Annually
25. Inspect flow switches for proper operation.Annually
26. Clean unit components, interior and exterior.Annually
27. Clean and secure mechanical room.Annually
28. COMPLETE AND SIGN MAINTENANCE TAG.Annually
GBOILBOILER, GAS, STEAM, W/ML, 500 to 700 MBTUH6
GBOILBOILER, GAS, STEAM, W/ML, 701 to 1,000 MBTUH7
GBOILBOILER, GAS, STEAM, W/ML, over 1,000 MBTUH1
(MUD/WATER LEGS ACCESSIBLE = W/ML)1414
Typical timeframe:

September-April (8 months)

Bi-Weekly1414Bi-Weekly (Typical timeframe: Sept - Apr) 8 months196
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Bi-Weekly
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Bi-Weekly
3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Bi-Weekly
4. Inspect all limit and operating controls to ensure proper operation.Bi-Weekly
5. Inspect condensate return pumps on boiler.Bi-Weekly
6. Inspect for proper combustion air.Bi-Weekly
7. Visually inspect for proper insulation on steam and water lines.Bi-Weekly
8. Clean and secure mechanical room.Bi-Weekly
9. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Weekly
Annually141Annually14
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Annually
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Annually
3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Annually
4. Inspect all limit and operating controls to ensure proper operation.Annually
5. Inspect condensate return pumps on boiler.Annually
6. Inspect for proper combustion air.Annually
7. Visually inspect for proper insulation on steam and water lines.Annually
8. Inspect burner and flue door gaskets.Annually
9. Inspect and clean syphon tubes for pressuretrols and gauges.Annually
10. Inspect and clean cross and T fittings and piping.Annually
11. Inspect vent pipe and barometric damper.Annually
12. Inspect automatic/manual air vents for proper operation.Annually
13. Inspect condensate traps for proper operation (combustion chamber).Annually
14. Inspect and clean boiler flues, tubes, and combustion chamber.Annually
15. Clean pilot and burner.Annually
16. For steam systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems (heating loop). Test for alkalinity, ph, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government.Annually
17. Inspect proper operation of steam trap and clean strainers.Annually
18. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion.Annually
19. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function.Annually
20. Inspect boiler drain valves for proper operation.Annually
21. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation.Annually
22. Check and grease gas cocks, check gas piping for leaks from cock to appliance.Annually
23. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log.Annually
24. Inspect and clean the low water sensing probe.Annually
25. Check for proper operation of water feed control valve and clean strainer.
26. Clean unit components, interior and exterior.Annually
27. Clean and secure mechanical room.Annually
28. Clean and flush mud/water legs.Annually
29. COMPLETE AND SIGN MAINTENANCE TAG.Annually
GBOILBOILER, GAS, STEAM, NO ML, 501 to 700 MBTUH5
GBOILBOILER, GAS, STEAM, NO ML, 701 to 1,000 MBTUH4
GBOILBOILER, GAS, STEAM, NO ML, over 1,000 MBTUH16
(MUD/WATER LEGS NOT ACCESSIBLE = NO ML)2525
Typical timeframe:

September-April (8 months)

Bi-Weekly2514Bi-Weekly (Typical timeframe: Sept - Apr) 8 months350
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Bi-Weekly
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Bi-Weekly
3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Bi-Weekly
4. Inspect all limit and operating controls to ensure proper operation.Bi-Weekly
5. Inspect condensate return pumps on boiler.Bi-Weekly
6. Inspect for proper combustion air.Bi-Weekly
7. Visually inspect for proper insulation on steam and water lines.Bi-Weekly
8. Clean and secure mechanical room.Bi-Weekly
9. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Weekly
Annually251Annually25
1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation.Annually
2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log.Annually
3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Annually
4. Inspect all limit and operating controls to ensure proper operation.Annually
5. Inspect condensate return pumps on boiler.Annually
6. Inspect for proper combustion air.Annually
7. Visually inspect for proper insulation on steam and water lines.Annually
8. Inspect burner and flue door gaskets.Annually
9. Inspect and clean syphon tubes for pressuretrols and gauges.Annually
10. Inspect and clean cross and T fittings and piping.Annually
11. Inspect vent pipe and barometric damper.Annually
12. Inspect automatic/manual air vents for proper operation.Annually
13. Inspect condensate traps for proper operation (combustion chamber).Annually
14. Inspect and clean boiler flues, tubes, and combustion chamber.Annually
15. Clean pilot and burner.Annually
16. For steam systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems (heating loop). Test for alkalinity, ph, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government.Annually
17. Inspect proper operation of steam trap and clean strainers.Annually
18. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion.Annually
19. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function.Annually
20. Inspect boiler drain valves for proper operation.Annually
21. Bottom blow mud/water legs.Annually
22. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation.Annually
23. Check and grease gas cocks, check gas piping for leaks from cock to appliance.Annually
24. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log.Annually
25. Inspect and clean the low water sensing probe.Annually
26. Check for proper operation of water feed control valve and clean strainer.
27. Clean unit components, interior and exterior.Annually
28. Clean and secure mechanical room.Annually
29. COMPLETE AND SIGN MAINTENANCE TAG.Annually
EBOILBOILER, ELECTRIC, HOT WATER, NO ML11
(MUD/WATER LEGS NOT ACCESSIBLE = NO ML)Typical timeframe:

September-April (8 months)

Bi-Weekly114Bi-Weekly (Typical timeframe: Sept - Apr) 8 months14
1. Inspect all limit and operating controls to ensure proper operation.Bi-Weekly
2. Check boiler water pressure and temperature and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Bi-Weekly
3. Visually inspect for proper insulation on water lines.Bi-Weekly
4. Inspect circulating pump and safety relief valve on boiler.Bi-Weekly
5. Clean and secure mechanical room.Bi-Weekly
6. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Weekly
Annually11Annually1
1. Inspect all limit and operating controls to ensure proper operation.Annually
2. Check boiler water pressure and temperature and any other applicable items shown on the boiler operating log. Record results on boiler operating log.Annually
3. Visually inspect for proper insulation on water lines.Annually
4. Inspect circulating pump and safety relief valve on boiler.Annually
5. Inspect heating element and clean any scale built up on the elements.Annually
6. Check operation of the check valves. Manually lift safety relief valve. Check safety relief valve for any signs of leaking or corrosion.Annually
7. Check all electrical connections to ensure that they are tight.Annually
8. Clean unit components, interior and exterior.Annually
9. Clean and secure mechanical room.Annually
10. COMPLETE AND SIGN MAINTENANCE TAG.Annually
GFACCOMBINATION HTG/COOLING UNIT <= 5 TON - WALL, ROOF, OR PAD MTD, ELECTRIC-at COLs88
HEATING
MonthlyTypical timeframe:
October - March (6 months)85Monthly-Heating (Typical timeframe: Oct - Mar) 6 months40
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Monthly-Heating
2. Clean up work area.Monthly-Heating
3. COMPLETE AND SIGN MAINTENANCE TAG.Monthly-Heating
Annually81Annually (Fall)8
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (fall)
2. Inspect heating element.Annually (fall)
3. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (fall)
4. Clean up work area.Annually (fall)
5. COMPLETE AND SIGN MAINTENANCE TAG.Annually (fall)
COOLING
MonthlyTypical timeframe:
April - September (6 months)85Monthly-Cooling (Typical timeframe: Apr - Sep) 6 months40
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Monthly-Cooling
2. Remove debris from exterior screens and grilles, clean around unit.Monthly-Cooling
3. Clean up work area.Monthly-Cooling
4. COMPLETE AND SIGN MAINTENANCE TAG.Monthly-Cooling
Annually81Annually-Spring8
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (spring)
2. Remove debris from exterior screens and grilles, clean around unit.Annually (spring)
3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps.Annually (spring)
4. Straighten and comb fins.Annually (spring)
5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (spring)
6. Remove dirt or rust from all interior parts, repaint as necessary.Annually (spring)
7. Inspect and adjust fresh air damper and clean external screens, if applicable.Annually (spring)
8. Lubricate motor and fan bearings.Annually (spring)
9. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear.Annually (spring)
10. Check unit and ductwork for proper insulation.Annually (spring)
11. Check for proper refrigerant charge.Annually (spring)
12. Clean unit components, interior and exterior.Annually (spring)
13. Clean up work area.Annually (spring)
14. COMPLETE AND SIGN MAINTENANCE TAG.Annually (spring)
PTACCOMBINATION HTG/COOLING UNIT <= 5 TON - WALL, ROOF, OR PAD MTD, HEAT PUMP (packaged unit)-not COLs275275
HEATINGTypical timeframe:

October - March (6 months)

Quarterly2753Quarterly-Heating825
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Quarterly-Heating
2. Clean up work area.Quarterly-Heating
3. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly-Heating
Annually2751Annually (Fall)275
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (fall)
2. Inspect heating element.Annually (fall)
3. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (fall)
4. Clean up work area.Annually (fall)
5. COMPLETE AND SIGN MAINTENANCE TAG.Annually (fall)
COOLINGTypical timeframe:

April - September (6 months)

Quarterly2753Quarterly-Cooling825
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Quarterly-Cooling
2. Remove debris from exterior screens and grilles, clean around unit.Quarterly-Cooling
3. Clean up work area.Quarterly-Cooling
4. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly-Cooling
Annually2751Annually-(Spring)275
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (spring)
2. Remove debris from exterior screens and grilles, clean around unit.Annually (spring)
3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps.Annually (spring)
4. Straighten and comb fins.Annually (spring)
5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (spring)
6. Remove dirt or rust from all interior parts, repaint as necessary.Annually (spring)
7. Inspect and adjust fresh air damper and clean external screens, if applicable.Annually (spring)
8. Lubricate motor and fan bearings.Annually (spring)
9. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear. Check belts (if any) for wear, appropriate tension and alignment, replace if necessary.Annually (spring)
10. Check unit and ductwork for proper insulation.Annually (spring)
11. Check for proper refrigerant charge.Annually (spring)
12. Clean unit components, interior and exterior.Annually (spring)
13. Clean up work area.Annually (spring)
14. COMPLETE AND SIGN MAINTENANCE TAG.Annually (spring)
GFACCOMBINATION HTG/COOLING UNIT <= 5 TON - GAS, WALL, ROOF, OR PAD MTD-at COLS (FOBs)209209
HEATING
Bi-MonthlyTypical timeframe:
October - March (6 months)2093Bi-Monthly-Heating (Typical timeframe: Oct - Mar) 6 months627
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Bi-Monthly-Heating
2. Clean up work area.Bi-Monthly-Heating
3. COMPLETE AND SIGN MAINTENANCE TAG.Bi-Monthly-Heating
Annually2091Annually (Fall)209
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (fall)
2. Inspect heat exchanger, gaskets, and venting.Annually (fall)
3. Inspect exhaust and intake for restrictions.Annually (fall)
4. Check burner for proper operation. Clean burner.Annually (fall)
5. Check incoming static gas pressure, the manifold gas pressure, and all gas connections and gas controls for leaks and proper operation.Annually (fall)
6. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (fall)
7. Inspect ignitor, flame sensor, pilot, and burner. Ensure pilot safety function. Adjust burner for efficiency.Annually (fall)
8. Clean up work area.Annually (fall)
9. COMPLETE AND SIGN MAINTENANCE TAG.Annually (fall)
COOLING
MonthlyTypical timeframe:
April - September (6 months)2095Monthly-Cooling (Typical timeframe: apr - Sep) 6 months1045
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Monthly-Cooling
2. Remove debris from exterior screens and grilles, clean around unit.Monthly-Cooling
3. Clean up work area.Monthly-Cooling
4. COMPLETE AND SIGN MAINTENANCE TAG.Monthly-Cooling
Annually2091Annually (Spring)209
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (spring)
2. Remove debris from exterior screens and grilles, clean around unit.Annually (spring)
3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps.Annually (spring)
4. Straighten and comb fins.Annually (spring)
5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (spring)
6. Remove dirt or rust from all interior parts, repaint as necessary.Annually (spring)
7. Check fresh air dampers and actuators for proper operation.Annually (spring)
8. Lubricate motor and fan bearings.Annually (spring)
9. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear. Check belts, if any, for wear, appropriate tension and alignment, replace if necessary.Annually (spring)
10. Check unit and ductwork for proper insulation.Annually (spring)
11. Check for proper refrigerant charge.Annually (spring)
12. Clean unit components, interior and exterior.Annually (spring)
13. Clean up work area.Annually (spring)
14. COMPLETE AND SIGN MAINTENANCE TAG.Annually (spring)
PTACCOMBINATION HTG/COOLING UNIT <= 5 TON - GAS, WALL, ROOF, OR PAD MTD-not COLs138138
HEATINGTypical timeframe:

October - March (6 months)

Quarterly1383Quarterly-Heating414
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Quarterly-Heating
2. Clean up work area.Quarterly-Heating
3. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly-Heating
Annually1381Annually (Fall)138
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Annually (fall)
2. Inspect heat exchanger, gaskets, and venting.Annually (fall)
3. Inspect exhaust and intake for restrictions.Annually (fall)
4. Check burner for proper operation. Clean burner.Annually (fall)
5. Check incoming static gas pressure, the manifold gas pressure, and all gas connections and gas controls for leaks and proper operation.Annually (fall)
6. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts.Annually (fall)
7. Inspect ignitor, flame sensor, pilot, and burner. Ensure pilot safety function. Adjust burner for efficiency.Annually (fall)
8. Clean up work area.Annually (fall)
9. COMPLETE AND SIGN MAINTENANCE TAG.Annually (fall)
COOLINGTypical timeframe:

April - September (6 months)

Quarterly1383Quarterly-Cooling414
1. Inspect and clean or replace filters, if needed. Record date on non-washable filters.Quarterly-Cooling
2. Remove debris from exterior screens and grilles, clean around unit.Quarterly-Cooling
3. Clean up work area.Quarterly-Cooling
4. COMPLETE AND SIGN MAINTENANCE TAG.Quarterly-Cooling