Rectifier Inspection Form
Rectifier Information:
Location: Jet Fuel Storage (Airfield) Type: Air Cooled Manufacturer: Cathodic Protection Rectifiers SN: 990339 Shunt Size: 50mv/15A DC Output: 40 Volts, 12 Amps
Tested by:
Name, NACE#
Rectifier Settings Panel Meter Portable DVM Ground Bed Anodes Output (Amps) Remarks Date: Course/Fine Volts/Amps (Volts/Amps) Tested By (NACE) #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 TOTAL 1/ / 2/ / 3/ / 4/ / 5/ / 6/ / 7/ / 8/ / 9/ / 10/ / 11/ / 12/ /
DATE:__________
Fort McCoy – Jet Fuel Storage Facility Corrosion Control Survey
Testing Procedure and Testing Equipment Used:
Structure-to-Electrolyte Potentials (mV)
LOCATION Native Instant Off Energized
Polarization
East Tank #4 North End
East Tank #4 Center
East Tank #4 South End
Tank #3 North End
Tank #3 Center
Tank #3 South End
Tank #2 North End
Tank #2 Center
Tank #2 South End
West Tank #1 North End
West Tank #1 Center
West Tank #1 South End
Reference Cell in Tank Area
Reference Cell South Side of Road
Reference Cell West Side of Tarmac
Dispensing Area #1
Dispensing Area #2
Dispensing Area #3
Dispensing Area #4
Rectifier Output Setting
Volts
Amps
Anode Output
#1 Amps .01 ohm shunts
#2 Amps
#3 Amps
#4 Amps
#5 Amps
#6 Amps
#7 Amps
#8 Amps
Lines Amps
TOTAL Amps 50mV/15A shunt
Results:
Name and NACE #
DATE:__________
Fort McCoy Oil/Water Separator Tanks Corrosion Control Survey
CENTRAL FUELS
Structure to Electrolyte Potentials (mV) Location End Potential Center Potential End Potential Status
Wheeled Vehicles mV mV mV
Product Tank mV mV mV
Tracked Vehicles mV mV mV
Storage Tanks mV mV mV
IMMA
Location End Potential Center Potential End Potential Status
#2 - East G Street mV mV mV
RTS MEDICAL B10005
Maint Building mV mV mV
RTS MAINTENANCE B1370
Manholes in pkg lot mV mV mV
AIRFIELD
Bldg 6058 Tanks mV mV mV
Bldg 6055 Tanks mV mV mV
Fort McCoy Water Reservoir
South Post Yearly Corrosion Control Survey
Under Tank System Data: (Rectifier Output Volts, Amps)
Native (mV) On Reading (mV) Off Reading (mV) Polarization Reference Cell
Rectifier Inspection Form
Rectifier Information:
Location: South Post Housing Water Tanks Type: Air Cooled ManufacturGoodall Electric SN: C‐97202 Model: tasc vii‐20‐5 AC Input: 120 Volt, Single Phase
DC Output: 20 Volts, 5 Amps Shunt Size: 50mv/15A
Tested by:
Name, NACE#
Rectifier Settings Panel Meter Portable DVM Date: Course/Fine Volts/Amps (Volts/Amps) Tested By (NACE) Remarks 1/ / 2/ / 3/ / 4/ / 5/ / 6/ / 7/ / 8/ / 9/ / 10/ / 11/ / 12/ /
| 02 TL 5-4 LP Gas System test report |
| 02 TL 5-4.11 AF Rectifier Insp |
| 02 TL 5-4.11 Jet fuel storage test report |
| 02 TL 5-4.11 Oil-water sep test report |
| 02 TL 5-4.11 SP Annual Water Res Test |
| 02 TL 5-4.11 SP Water Rectifier Insp |
| 02 TL 5-4.11 Wastewater Points |