00_PRS_Schedule_(7SEP16).xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Facilities Maintenance Services at Fort McCoy, WI
Solicitation number
W912ES-17-R-0002
Issued by

About this file

00 PRS Schedule

View the file

Other files

File Type Posted
Amendment_3_.pdf PDF
02_TL_54_PM_Task_and_Freq_Chart_(18_Nov_16).xls XLS spreadsheet
Equipment_List_12-1-16.xlsx XLSX spreadsheet
BUILDING_LIST___21NOV16.xlsx XLSX spreadsheet
Amendment_2_.pdf PDF
01_TE_1.4.3_Workload_Data_(14_Nov_16).xlsx XLSX spreadsheet
01_TE_3-1_GFE_(29JAN2016).xlsx XLSX spreadsheet
02_TL_5_4_PM_Task_and_Freq_Chart_.xls XLS spreadsheet
Amendment_1_.pdf PDF
Site_Visit_Sign_In_Sheet_.pdf PDF
02_TL_5.4.4_Fire_Supp_(Dry_Pipe)_(18_FEB_16).xlsx XLSX spreadsheet
02_TL_4.7_WI_SALES_TAX_EXEMPT_FORM_.pdf PDF
02_TL_5.4.9_Cathodic_Protection_Testing.pdf PDF
02_TL_5.3.18b__Facility_Deactivation_(16AUG16).docx DOCX document
01_TE_3.2_GFF_(Post_B2108_Renovation).xlsx XLSX spreadsheet
MCC_Form_451.xlsx XLSX spreadsheet
02_TL_5.4.1_Fire_Supp_(Ansul-Chemical).xlsx XLSX spreadsheet
Questionnaire_Attachment_.pdf PDF
01_CBA_FMC_2014-2017.pdf PDF
02_TL_5.4.5_Fire_Alarm_System.docx DOCX document
01_TE_1.4.3_Workload_Data_(31OCT16)_.xlsx XLSX spreadsheet
01_TE_3.2__GFF_(27_Oct_16).doc DOC document
02_TL_5.3.17Generator_Log_9-20-2016.xlsx XLSX spreadsheet
02_TL_1.2_3rd_Qtr_FY16.xlsx XLSX spreadsheet
02_TL_5.5_Ice_Melt_Report.xls XLS spreadsheet
Solicitation_.pdf PDF
01_TE_1.6.5_PRS_Description_FM_(18_Jul_16).doc DOC document
02_TL_5.4_PM_Task_and_Freq_Chart_(27_Oct_16).xls XLS spreadsheet
02_TL_5.4.6_Elevators_and_Lifts_(13_JUL_16).xlsx XLSX spreadsheet
02_TL_5.4.7_Water_System.pdf PDF
AR_420_1.pdf PDF
01_TE_3.3_GFP_Automation_(6SEP16).xlsx XLSX spreadsheet
01_TE_1.3_DSL_FM_(27_Oct_16).xlsx XLSX spreadsheet
FAC_MAINT_SCA-CBA_Employees.xlsx XLSX spreadsheet
01_TE_1.4.3_Workload_Table_(24_OCT_16).xls XLS spreadsheet
02_TL_5.4.2_Fire_Supp_(Kitchen_Hood_Cleaning).docx DOCX document
02_TL_1.6.12_HVAC_Qualifier.pdf PDF
02_TL_1.6_DD254_Contract_Security_Class_Spec.pdf PDF
02_TL_5.3.5_Facility_Standards.docx DOCX document
02_TL_5.3.18a_Facility_Activation_(16AUG16).docx DOCX document
02_TL_4.5b_Gen_tank_insp_Form_372.xlsx XLSX spreadsheet
02_TL_5.4.8_Earth_Bond_Testing.pdf PDF
02_TL_4.5a_TR-WM-118.pdf PDF
02_TL_5.4.3_Fire_Supp_(Wet_Pipe)_(13_JUL_16).xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facility Maintenance and Repair

FORT MCCOY
DPW QASP - PUBLIC WORKS ANNEX A
FACILITY MAINTENANCE AND REPAIR
PERFORMANCE REQUIREMENTS SUMMARY (PRS)SURVEILLANCE SCHEDULESURVEILLANCE ACTIVITY
(DA FORM 5475-R)CHECKLIST (DA FORM 5476-R)
CLIN / SUB ELEMENTPRS #PWS #PWS PARAGRAPH SECTIONSTANDARDAcceptable Quality Level (AQL)METHOD OF SURVEILLANCEFREQUENCYName of
COR / QAEDate and Location of Scheduled InspectionDate and Location Surveillance AccomplishedBatch or Lot SizeSample SizeAccept or Reject LevelNumber Not Con-formingCompliance (Acceptable / Unacceptable)NotesInitialReduction In Payment (RIP) or Impact on CPARS
X00101-A1.6.6Quality Control PlanA. Provide the COR a monthly report showing results of planned quality control inspections, no later than fifth business day of the new month.100%100% InspectionMonthlyResults will be reported in CPARS.
01-BProvide the COR a monthly summary of the Non-conformances recorded in the QC inspection report later than no later than fifth business day of the new month.100%100% InspectionMonthlyMonthly (do not schedule or inspect prior to the 6th business day of the month following the inspected period.)Results will be reported in CPARS.
01-CC. The contractor’s QC Plan shall be updated annually and submitted to the COR no later than 30 days prior to the next option period.100%100% InspectionAnnuallyAnnual Inspection: Inspect during the last month of the option year.Results will be reported in CPARS.
X00102-A1.6.11Key PersonnelA. The contractor has KO approved Key Personnel on staff.100%100% InspectionMonthlyReduce monthly invoice CLIN X001 by the amount of the Key Personnel salary, for any invoice period where the KTR has a position vacancy. Results will be reported in CPARS.
X00103-A1.6.12.2Certifications and Special QualificationsA. All employees are licensed and/or qualified as required.100%100% InspectionAnnually or for New EmployeesResults will be reported in CPARS.
X00204-A5.3.1Service Order PrioritiesA. Emergency service orders require response within 30 minutes and completion within 4 hours.95%Random SamplingMonthly5% of the monthly invoiced amount for CLIN X002. Results will be reported in CPARS.
X00304-BB. Urgent service orders require response within 2 calendar days and completion within 7 calendar days.95%Random SamplingMonthly5% of the monthly invoiced amount for CLIN X003. Results will be reported in CPARS.
X00404-CC. Routine service orders require completion within 30 calendar days.95%Random SamplingMonthly5% of the monthly invoiced amount for CLIN X004. Results will be reported in CPARS.
04-DD. Complete work with zero valid callbacks.0Customer ComplaintMonthlyResults will be reported in CPARS.
X00105-A5.3.2Scheduling, Coordination, Tracking and ReportingA. The contractor shall coordinate actual start date of service order work with the customer.0Customer ComplaintMonthlyResults will be reported in CPARS.
X00105-BB. Work status questions for service orders are answered no later than close of business on the workday following the day of request.0Customer ComplaintMonthlyResults will be reported in CPARS.
X00106-A5.3.3Close out Completed WorkA. All completed service orders are backed-up, documentation is complete, accurate, and submitted within two work days.0Customer ComplaintMonthlyResults will be reported in CPARS.
X006AJ07-A5.3.4Utility LocationA. 100% of underground utilities are located within 72 hours after receipt of request.0Customer ComplaintMonthlyResults will be reported in CPARS
X002-508-A5.3.5Structural RepairA. All structural-in-nature work shall comply with the PWS. All work shall incorporate structural components for its intended use and purpose and be plumb, level and surfaces finished.95%Random SamplingMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-509-A5.3.7Street and Parking Lot StripingA. All street and parking lot striping shall comply with the PWS. All lines shall be straight and proper length and width. All spaces shall be of the proper spacing for vehicle parking. All street striping shall be straight and true and shall meet proper spacing for vehicular traffic. Crosswalks shall be striped to the correct dimensions and in the correct locations. Follow manufacturer’s recommendations for surface application.95%100% InspectionMonthlyMonthly as weather and surface conditions allow.20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X006AL10-A5.3.8Packing and CratingA. All packing and crating work shall comply with the PWS. Construct, crate, block, brace, and tie-down material and equipment within requestor’s timeframe.0Customer ComplaintMonthlyResults will be reported in CPARS
X006AL10-BB. Fabrication of sufficient strength and construction to prevent damage to item being packed/crated or blocked.0Customer ComplaintMonthlyResults will be reported in CPARS
X006AL10-CC. Provide the COR certification for the Wood Packing Material custodian quarterly by the fifth day of the new month.100%100% InspectionQuarterly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-511-A5.3.9SignsA. All traffic and informational signs are repaired and installed IAW the Fort McCoy Installation Design Guide, Sign Policy and other regulatory requirements.95%Random SampleMonthlyResults will be reported in CPARS.
X002-512-A5.3.10Appliances, Commercial and Residential EquipmentA. All work involving equipment shall comply with the PWS. All equipment shall be repaired to function properly for its intended use and capacity.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-513-A5.3.11Plumbing and Pipe FittingA. All plumbing and pipe fitting work shall comply with the PWS. All interior and exterior plumbing shall be installed to UPC standards. All piping repairs are made with compatible materials. Dissimilar piping metals shall be isolated95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-514-A5.3.12Equipment Controls and Alarm SystemsA. All equipment and system repairs shall comply with the PWS. All components shall be installed properly. All component functions shall be programmed and set-up for their intended operation. Alarm system components shall be functionally tested to include detection devices and alarm sending devices. All alarm panel message & indicator lighting shall be functional.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-515-A5.3.13.1Boiler RepairA. All boiler maintenance and repair work shall comply with the PWS. All heating equipment shall function properly at its rated capacity. All gas burners shall be set properly and operate efficiently. All equipment shall be vented properly. All pumps are operational. No obstructions or leaks shall be present in the system.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-516-A5.3.13.2Natural and LP Gas SystemsA. All Natural gas and LP gas system work shall comply with the PWS. All piping shall be plumb, level and follow structural elements. All piping shall be free of obstructions and leaks. All safety devices shall be installed and properly relieved.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-517-A5.3.13.3Forced Air Furnace RepairA. All forced air furnace maintenance and repair work shall comply with the PWS. All heating equipment shall function properly at its rated capacity. All gas burners shall be set properly and operating efficiently. Equipment shall be vented properly. Air handing system shall be functional and shall be balanced to maintain uniform temperatures. All fan belts shall be properly tensioned and lubricate parts as needed.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-518-A5.3.14Water Heater RepairA. All water heater maintenance and repair work shall comply with the PWS. Heater shall function properly at its rated capacity. All gas burners set properly, vented, and pressure relief valve operating efficiently.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-519-A5.3.15Air Conditioning, Ventilation and Refrigeration EquipmentA. All air conditioning, air handlers, ventilation and refrigeration work shall comply with the PWS. All cooling equipment shall function properly at its rated capacity. All refrigeration specialties shall be set properly and operating efficiently. Condenser shall be free of obstructions for maximum heat transfer. All fans shall distribute air volumes at their intended flow rates and pressures. Air handing system shall be functional and shall be balanced to maintain uniform temperatures. All fan belts shall be properly tightened. Refrigeration piping shall contain no leaks.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-520-A5.3.16Metal WorkA. All metal work shall comply with the PWS. When applicable, all metal work shall be installed plumb and/or level. No apparent or noticeable air leakage in duct work and no jagged edges exposed.100%100% InspectionMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-521-A5.3.17Operational Checks and Repairs to Emergency Generators and Transfer SwitchesA All generator work shall comply with the PWS, All operational checks shall be logged in the LOG book for the unit, including any refueling completed and ensure that the generator is ready for the next emergency use.95%100% InspectionMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X006AA-AC-AG22-A5.3.18Facility Activation and Deactivation:Activation – Facility has been readied IAW TL 5.3.18a for intended use by specified date.95%100% InspectionMonthlyMonthly: Inspect monthly completed workloads as near as possible to real-time as soon as possible after KTR completion: continue as needed until all inspected period workload activation inspections are completed.2% of the monthly invoiced amount for CLIN X006AA plus 2% of the monthly invoiced amount of CLIN X006AC. Results will be reported in CPARS.
22-BB. Deactivate energy consuming devices, IAW TL 5.3.18b by specified date.95%Random SampleMonthly1% of the monthly invoiced amount for CLIN X006AG. Results will be reported in CPARS.
X002-523-A5.3.19.1Interior Electrical RepairA. All interior electrical installation and maintenance work shall comply with the PWS. All conduits shall be plumb and level and follow structural elements. Wiring in conduit shall not exceed conduit capacity. All boxes, switches and outlets shall be properly covered.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-524-A5.3.19.2Exterior Electric - 600 Volts and UnderA. All exterior electric work – 600 volts and under shall comply with the PWS and function at complete and full capacity for intended use.95%Random SampleMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X002-525-A5.3.20Airfield Lighting and Associated EquipmentA. All airfield lighting work shall comply with the PWS. Work requests are performed IAW Airfield Operational Standards (work must meet specifications, and all equipment functions as it is intended).1Customer ComplaintMonthly20% of the invoiced amount of each defective SO. Results will be reported in CPARS.
X00726-A5.4Preventive MaintenancePerform scheduled maintenance IAW Preventive Maintenance Task & Frequency Chart (TL 5-4.1). Failure to accomplish any task IAW TL 5-4.1 shall result in a failure for the entire piece of equipment.95%Random SamplingMonthly1% of the monthly invoiced amount for CLIN X007. Results will be reported in CPARS.
26-BPerform scheduled maintenance for each piece of equipment IAW monthly schedule. 100% of scheduled equipment PMs shall be completed.100%100% InspectionMonthly1% of the monthly invoiced amount for CLIN X007. Results will be reported in CPARS.
26-CEmergency generators are maintained and operational.100%Random SampleMonthlyResults will be reported in CPARS.
26-DSubmit Annual Earth and Bond Report and Annual Cathodic Protection report NLT 1 Aug of each year100%100% InspectionAnnual1% of the monthly invoiced amount for CLIN X007. Results will be reported in CPARS.
26-EProvide annual scale calibration certification report to the designated Government official NLT April 15.100%100% InspectionAnnualResults will be reported in CPARS.
26-FProvide annual and semi-annual reports of inoperative street and parking lot lights, NLT 15 MAR and 15 AUG each year.100%100% InspectionAnnualResults will be reported in CPARS.
For Official Use Only&"Arial,Bold"&12ANNEX A – Merged PRS Table, Surveillance Schedule (DA Form 5475-R), And Surveillance Activity Checklist (DA Form 5476-R)