TL 5.4 PM TASK-FREQ
| SECTION B - PM PRICING | |||||||||
| Updated 12/05/2016 | |||||||||
| PREVENTIVE MAINTENANCE - (Includes all labor, travel, clean up and any other support necessary to complete preventive maintenance IAW this TL 5-4.1 Task & Frequency Chart and as indicated in manufacturers recommendations. (Provide costs by equipment type. Assumes 1 person and .25 hr travel time.) | |||||||||
| NOTE: Some tasks shown below may be performed during more than one PM frequency. This will affect the PM Task/Year count by Frequency. (i.e. "Change filters and belts." may appear under Bi-Monthly as a task for that frequency and then appear again under Annually as a task for that frequency. Because this Bi-monthly task is being accomplished under the Annual frequency, one less PM Task/Year will be counted under the Bi-Monthly. | |||||||||
| NOTE: While performing Preventive Maintenance, report to the Government Work Reception Center at the time of discovery any deficiency requiring repair that is not part of the scheduled PM or that cannot be corrected at the time of the PM. | |||||||||
| CLIN XXXX | DESCRIPTION | TASK | FREQUENCY | EQUIP QTY | PM'S / YEAR | TYPE | |||
| (= FREQ COL) | # EQUIPMENT PM'S | EQUIP TOTALS | |||||||
| AIR HANDLING AND VENTILATION EQUIPMENT | |||||||||
| EQUIP TYPE | |||||||||
| AHU | AIR HANDLER UNDER 5,000 CFM to 50,000 CFM | 217 | 217 | ||||||
| OUTSIDE AIR UNIT (OAU) | Quarterly | 217 | 3 | Quarterly | 651 | ||||
| 1. Check and record water inlet and outlet water temperature and air inlet and outlet temperature on Operating Log. | Quarterly | ||||||||
| 2. Check all controls and thermostats for proper operation. | Quarterly | ||||||||
| 3. Check to ensure that Occupied/Unoccupied mode is set correctly. | Quarterly | ||||||||
| 4. Change filters/ check belts. | Quarterly | ||||||||
| 5. Check bearings and lubricate. | Quarterly | ||||||||
| 6. Ensure all dampers operate correctly with controls. | Quarterly | ||||||||
| 7. Clean outside air intake screens and louvers of debris. | Quarterly | ||||||||
| 8. Lubricate louvers and linkages. | Quarterly | ||||||||
| 9. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable. | Quarterly | ||||||||
| 10. Clean and secure mechanical room. | Quarterly | ||||||||
| 11. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly | ||||||||
| Annually | 217 | 1 | Annually | 217 | |||||
| 1. Check and record water inlet and outlet water temperature and air inlet and outlet temperature on Operating Log. | Annually | ||||||||
| 2. Check all controls and thermostats for proper operation. | Annually | ||||||||
| 3. Check to ensure that Occupied/Unoccupied mode is set correctly. | Annually | ||||||||
| 4. Change filters, if necessary. | Annually | ||||||||
| 5. Replace belts. | Annually | ||||||||
| 6.. Check bearings and lubricate. | Annually | ||||||||
| 7. Ensure all dampers operate correctly with controls. | Annually | ||||||||
| 8. Clean outside air intake screens and louvers of debris. | Annually | ||||||||
| 9. Lubricate louvers and linkages. | Annually | ||||||||
| 10. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable. | Annually | ||||||||
| 11. Clean heating and cooling coil and all other interior and exterior components. | Annually | ||||||||
| 12. Clean and secure mechanical room. | Annually | ||||||||
| 13. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| DHUMID | DEHUMIDIFIER | 3 | 1 | Annually | 3 | 3 | |||
| 1. Check operating controls for proper operation. | Annually | ||||||||
| (ONLY 1 IN ARMS VAULT B2197) | 2. Clean filters, replace if necessary. | Annually | |||||||
| 3. Clean desiccant media or replace if necessary. | Annually | ||||||||
| 4. Inspect rotor,drive belt, and motors. Clean if necessary. | Annually | ||||||||
| 5. Check to insure all seals are functioning as required. | Annually | ||||||||
| 6. Clean all unit components, interior and exterior. | Annually | ||||||||
| 7. Clean up work area. | Annually | ||||||||
| 8. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| ERV | ENERGY/HEAT RECOVERY VENTILATOR | 50 | 50 | ||||||
| Quarterly | 50 | 3 | Quarterly | 150 | |||||
| 1. Clean or replace filters. | Quarterly | ||||||||
| 2. Check fan and motor for proper operation. | Quarterly | ||||||||
| 3. Clear debris from outdoor intake and exhaust screens/louvers/hoods. | Quarterly | ||||||||
| 4. Clean up work area. | Quarterly | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly | ||||||||
| Annually | 50 | 1 | Annually | 50 | |||||
| 1. Clean or replace filters. | Annually | ||||||||
| 2. Check fan and motor for proper operation. | Annually | ||||||||
| 3. Clear debris from outdoor intake and exhaust screens/louvers/hoods. | Annually | ||||||||
| 4. Clean exterior and interior of cabinet and all components of the unit. | Annually | ||||||||
| 5. Clean condensate drain if applicable. | Annually | ||||||||
| 6. Clean up work area. | Annually | ||||||||
| 7. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| FILTER | AHU/FURNACE/AC FILTERS | 220 | 220 | ||||||
| 220 | 24 | Weekly | 5280 | ||||||
| FOBS-Weekly (April thru September) | 1. Check/replace filters | Weekly | |||||||
| 2. Clean up work area. | |||||||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Weekly | ||||||||
| AHU/FURNACE/AC FILTERS | 42 | Monthly | 42 | ||||||
| 42 | 12 | 504 | |||||||
| B 207 and 1792 | 1. Check/replace filters | Monthly | |||||||
| 2. Clean up work area. | Monthly | ||||||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly | ||||||||
| HRV | HEAT RECOVERY UNIT | 2 | 2 | ||||||
| Quarterly | 2 | 3 | Quarterly | 6 | |||||
| 1. Clean or replace filters. | Quarterly | ||||||||
| 2. Check fan and motor for proper operation. | Quarterly | ||||||||
| 3. Clear debris from outdoor intake and exhaust screens/louvers/hoods. | Quarterly | ||||||||
| 4. Clean up work area. | Quarterly | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly | ||||||||
| Annually | 2 | 1 | Annually | 2 | |||||
| 1. Clean or replace filters. | Annually | ||||||||
| 2. Check fan and motor for proper operation. | Annually | ||||||||
| 3. Clear debris from outdoor intake and exhaust screens/louvers/hoods. | Annually | ||||||||
| 4. Clean exterior and interior of cabinet and all components of the unit. | Annually | ||||||||
| 5. Clean condensate drain if applicable. | Annually | ||||||||
| 6. Clean up work area. | Annually | ||||||||
| 7. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| EXF | FAN (EXHAUST, RETURN, OR SUPPLY) | 663 | 663 | ||||||
| Semi-Annually | 663 | 1 | Semi-Annually | 663 | |||||
| 1. Check bearings and motor. Lubricate. | Semi-Annually | ||||||||
| 2. Check louvers, lubricate linkage and actuators for proper operation if applicable. | Semi-Annually | ||||||||
| 3. Check for proper operation of controls. | Semi-Annually | ||||||||
| 4. Clean up work area. | Semi-Annually | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Semi-Annually | ||||||||
| Annually | 663 | 1 | Annually | 663 | |||||
| 1. Grease bearings/ oil motor. | Annually | ||||||||
| 2. Check louvers, lubricate linkage and actuators for proper operation if applicable. | Annually | ||||||||
| 3. Check for proper operation of controls. | Annually | ||||||||
| 4. Check belts/ bearings. | Annually | ||||||||
| 5. Clean all unit components, interior and exterior. | Annually | ||||||||
| 6. Clean up work area. | Annually | ||||||||
| 7. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| HUMIDIFIER | HUMIDIFIER | 12 | 0 | 12 | |||||
| 12 | 1 | Annually | 12 | ||||||
| 1. Check humidifier for proper operation. | Annually | ||||||||
| 2. Clean inside of humidifier and drain hose. | Annually | ||||||||
| 3. Change evaporation media (evaporator pad). | Annually | ||||||||
| 4. Check solenoid valve for proper operation. | Annually | ||||||||
| 5. Check to ensure water is flowing properly over the evaporator pad. | Annually | ||||||||
| 6. Check for leaks. | Annually | ||||||||
| 7. Clean up work area. | Annually | ||||||||
| HVAC DRIVE | UH HVAC DRIVES | 1 | 1 | ||||||
| B 207 | 1. Check replace R7/R8enclosure inlet air filter | Semi Annual | 1 | 2 | Semi Annual | 2 | |||
| 2. Check/replace R7/R8 enclosure exhaust air filter | Semi Annual | ||||||||
| 3. Check and clean heatsink | Semi Annual | ||||||||
| 4. Check cable connections are secure and tighten as specified | Semi Annual | ||||||||
| 5. Clean up work area. | Semi Annual | ||||||||
| 6. COMPLETE AND SIGN MAINTENANCE TAG. | Semi Annual | ||||||||
| HYDSYS | HYDRONIC SYSTEM FEEDER | 2 | 2 | ||||||
| B 207, B 1792 | 1. Check the fluid level in the storage tank for the correct level | Monthly | 2 | 12 | Monthly | 24 | |||
| 2. Visually examine the SF 100 to ensure it is clean and all joints are tight | Monthly | ||||||||
| 3. Check the strainer on the bottom of the suction hose inside the tank | Monthly | ||||||||
| 4. Clean up work area. | Monthly | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly | ||||||||
| COOLING EQUIPMENT | |||||||||
| MINICOMP | AC IN COMPUTER/SRVR RM, FREE STANDING |
(Air or water cooled, split & non-split)
| (example: Bldgs 1564, 1941) | 5 | 5 | |||||||
| Quarterly | 5 | 3 | Quarterly | 15 | |||||
| 1. Change filters. | Quarterly | ||||||||
| 2. Check belts for wear, appropriate tension and alignment as applicable. Replace if necessary. | Quarterly | ||||||||
| 3. Check blower motor. | Quarterly | ||||||||
| 4. Check safety features. | Quarterly | ||||||||
| 5. Check for proper operation. | Quarterly | ||||||||
| 6. Clean up work area. | Quarterly | ||||||||
| 7. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly | ||||||||
| Annually | 5 | 1 | Annually | 5 | |||||
| 1. Change filters. | Annually | ||||||||
| 2. Check belts for wear, appropriate tension and alignment as applicable. Replace if necessary. | Annually | ||||||||
| 3. Check blower motor. | Annually | ||||||||
| 4. Check safety features. | Annually | ||||||||
| 5. Check for proper operation. | Annually | ||||||||
| 6. Clean condenser and evaporator coils. | Annually | ||||||||
| 7. Straighten fin tubes with fin comb. | Annually | ||||||||
| 8. Check electrical connections for tightness. | Annually | ||||||||
| 9. Check mounting for tightness. | Annually | ||||||||
| 10. Check contactors for burnt contacts. | Annually | ||||||||
| 11. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary. | Annually | ||||||||
| 12. Check fan blade(s) and/or wheel(s) as applicable. | Annually | ||||||||
| 13. Check wires at condenser electrical fused safety switches for tightness and burned insulation. | Annually | ||||||||
| 14. Lubricate bearings (if applicable) and motor(s). | Annually | ||||||||
| 15. Check refrigerant charge. | Annually | ||||||||
| 16. Check condensate pans and drains. | Annually | ||||||||
| 17. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable-replace as needed. | Annually | ||||||||
| 18. Run unit, check action of controls, relays, switches, TXV valve (if applicable), etc. | Annually | ||||||||
| 19. Check and clean strainers, if applicable. | Annually | ||||||||
| 20. Clean unit components, interior and exterior. | Annually | ||||||||
| 21. Clean up work area. | Annually | ||||||||
| 22. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| ACON | AC UNIT, WINDOW, WALL, OR CEILING MOUNTED (MINI SPLIT SYSTEMS W/COND ON PAD) | 73 | 73 | ||||||
| Semi-Annually | Typical timeframe: April & July | 73 | 1 | Semi-Annually | 73 | ||||
| 1. Clean filter or replace if necessary. | Semi-Annually | ||||||||
| 2. Remove debris from air screen and condenser unit, and clean underneath and around unit. | Semi-Annually | ||||||||
| 3. Clean up work area. | Semi-Annually | ||||||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Semi-Annually | ||||||||
| Annually-spring | Typical timeframe: | ||||||||
| April - June | 73 | 1 | Annually | 73 | |||||
| 1. Clean filter or replace if necessary. | Annually | ||||||||
| 2. Remove debris from air screen and condenser unit, and clean underneath and around unit. | Annually | ||||||||
| 3. Clean condenser and evaporator coils. | Annually | ||||||||
| 4. Straighten fin tubes with fin comb. | Annually | ||||||||
| 5. Check electrical connections for tightness. | Annually | ||||||||
| 6. Check mounting for tightness. | Annually | ||||||||
| 7. Check contactors for burnt contacts. | Annually | ||||||||
| 8. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary. | Annually | ||||||||
| 9. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary. | Annually | ||||||||
| 10. Check wires at condenser electrical fused safety switches for tightness and burned insulation. | Annually | ||||||||
| 11. Lubricate bearings (if applicable) and motor(s). | Annually | ||||||||
| 12. Check refrigerant charge. | Annually | ||||||||
| 13. Check condensate pans and drains. | Annually | ||||||||
| 14. Visually inspect for proper insulation on refrigerant lines and water lines. | Annually | ||||||||
| 15. Check compresser crank case heater for proper operation (if applicable). | Annually | ||||||||
| 16. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable). | Annually | ||||||||
| 17. Clean unit components, interior and exterior. | Annually | ||||||||
| 18. Clean up work area. | Annually | ||||||||
| 19. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| CHILR | CHILLER, CENTRAL PKG, WATER UNIT 30-150 Tons | 20 | 20 | ||||||
| Typical timeframe: |
April - October (7 months)
| Weekly | 20 | 28 | Months | 560 | |||||
| 1. Check oil level and/or pressure. Record on Operating Log. | Weekly | ||||||||
| 2. Check refrigerant charge. Record on Operating Log. | Weekly | ||||||||
| 3. Check temperature and pressure gauges for proper operation. | Weekly | ||||||||
| 4. Check return air and supply air temperatures, and record readings on Operating Log. | Weekly | ||||||||
| 5. Check suction and discharge pressures in accordance with manufacturer's recommended levels. | Weekly | ||||||||
| 6. Clean exterior debris screen and condenser coils of leaves, grass, and other debris. | Weekly | ||||||||
| 7. Check bearings and fan blades on condenser unit motor. | Weekly | ||||||||
| 8. Check water pressure of entering evaporator water and leaving evaporator water, and record on Operating Log. Should be operating within the manufacturer's suggested range. | Weekly | ||||||||
| 9. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable. | Weekly | ||||||||
| 10. Perform visual check of any fluid or gas leaks. | Weekly | ||||||||
| 11. Complete Maintenance Log to reflect any repairs that are made. | Weekly | ||||||||
| 12. Clean and secure mechanical room. | Weekly | ||||||||
| 13. COMPLETE AND SIGN MAINTENANCE TAG. | Weekly | ||||||||
| Annually (Chiller Activation) | Typical Timeframe: April | 20 | 1 | Annually (when activated) / Typical Timeframe: April | 20 | ||||
| 1. Follow manufacturer's start-up procedures and complete start-up and operating logs as applicable at time system is first activated for the cooling season. If any system operating deficiencies are discovered at start-up, report corrective actions needed to the Government Work Reception Center immediately. | Annually (when activated) | ||||||||
| 2. Clean condenser and evaporator coils (fins) or chiller bundle, if applicable, with coil cleaner. | Annually (when activated) | ||||||||
| 3. Check for system leaks using dye or electronic leak detector. | Annually (when activated) | ||||||||
| 4. Conduct acid test of refrigerent oil, change oil and filter dryer if acidic. Record on Operating Log. | Annually (when activated) | ||||||||
| 5. Lube all bearings and motors if applicable. | Annually (when activated) | ||||||||
| 6. Check for proper operation in accordance with maunufacturer's recommended levels. | Annually (when activated) | ||||||||
| 7. Check all wiring connections for tightness. | Annually (when activated) | ||||||||
| 8. Check all contactors for burned contacts. | Annually (when activated) | ||||||||
| 9. Check loop pumps. | Annually (when activated) | ||||||||
| 10. Clean all in-line strainers. | Annually (when activated) | ||||||||
| 11. For closed loop chilled water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) closed cooling loop. Test for ph, nitrates, oxygen, bacteria, and conductivity (total dissolved solids) and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government. | Annually (when activated) | ||||||||
| 12. Inspect flow switches for proper operation. | Annually (when activated) | ||||||||
| 13. Check oil level and/or pressure. Record on Operating Log. | Annually (when activated) | ||||||||
| 14. Check refrigerant charge. Record on Operating Log. | Annually (when activated) | ||||||||
| 15. Check temperature and pressure gauges for proper operation. | Annually (when activated) | ||||||||
| 16. Check return air and supply air temperatures, and record readings on Operating Log. | Annually (when activated) | ||||||||
| 17. Check suction and discharge pressures in accordance with manufacturer's recommended levels. | Annually (when activated) | ||||||||
| 18. Clean exterior debris screen and condenser coils of leaves, grass, and other debris. | Annually (when activated) | ||||||||
| 19. Check bearings and fan blades on condenser unit motor. | Annually (when activated) | ||||||||
| 20. Check water pressure of entering evaporator water and leaving evaporator water, and record on Operating Log. Should be operating within the manufacturer's suggested range. | Annually (when activated) | ||||||||
| 21. Check compresser crank case heater for proper operation (if applicable). | |||||||||
| 22. Visually inspect for proper insulation on ductwork, refrigerant lines, and water lines if applicable. | Annually (when activated) | ||||||||
| 23. Perform visual check of any fluid or gas leaks. | Annually (when activated) | ||||||||
| 24. Complete Maintenance Log to reflect any repairs that are made. | Annually (when activated) | ||||||||
| 25. Clean unit components, interior and exterior. | Annually (when activated) | ||||||||
| 26. Clean and secure mechanical room. | Annually (when activated) | ||||||||
| 27. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (when activated) | ||||||||
| Annually (Chiller Deactivation) | Typical Timeframe: October | 20 | 1 | Annually (when deactivated) / Typical Timeframe: October | 20 | ||||
| 1. Follow manufacturer's shut-down procedures at time system is deactivated at the end of the cooling season. If any system operating deficiencies are discovered at shut-down, report corrective actions needed to the Government Work Reception Center immediately. | Annually (when deactivated) | ||||||||
| 2. Complete Operating Log. | Annually (when deactivated) | ||||||||
| 3. Clean and secure mechanical room. | Annually (when deactivated) | ||||||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (when deactivated) | ||||||||
| COND | CONDENSING UNIT 20 TONS OR LESS | ||||||||
| (connected to a separate furnace unit) | 716 | 716 | |||||||
| Annually-spring | Typical timeframe: | ||||||||
| April - June | 716 | 1 | Annually | 716 | |||||
| 1. Remove debris from air screen and condenser unit, and clean underneath and around unit. | Annually | ||||||||
| 2. Clean condenser and evaporator coils. | Annually | ||||||||
| 3. Straighten fin tubes with fin comb. | Annually | ||||||||
| 4. Check electrical connections for tightness. | Annually | ||||||||
| 5. Check mounting for tightness. | Annually | ||||||||
| 6. Check contactors for burnt contacts. | Annually | ||||||||
| 7. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary. | Annually | ||||||||
| 8. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary. | Annually | ||||||||
| 9. Check wires at condenser electrical fused safety switches for tightness and burned insulation. | Annually | ||||||||
| 10. Lubricate bearings (if applicable) and motor(s). | Annually | ||||||||
| 11. Check refrigerant charge. | Annually | ||||||||
| 12. Check condensate pans and drains. | Annually | ||||||||
| 13. Visually inspect for proper insulation on refrigerant lines. | Annually | ||||||||
| 14. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable). | Annually | ||||||||
| 15. Clean unit components, interior and exterior. | Annually | ||||||||
| 16. Clean up work area. | Annually | ||||||||
| 17. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| HEATPUMP | HEAT PUMP <= 5 TONS | ||||||||
| (connected to a separate furnace unit) | 74 | 74 | |||||||
| Semi-Annually-fall | Typical timeframe: October | 74 | 1 | Semi-Annually | 74 | ||||
| 1. Remove debris from air screen and condenser unit, and clean underneath and around unit. | Semi-Annually | ||||||||
| 2. Check condenser and evaporator coils. | Semi-Annually | ||||||||
| 3. Check operation of solenoid valves (refrigerant). | Semi-Annually | ||||||||
| 4. Clean up work area. | Semi-Annually | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Semi-Annually | ||||||||
| Annually-spring | Typical timeframe: | ||||||||
| April - June | 74 | 1 | Annually | 74 | |||||
| 1. Remove debris from air screen and condenser unit, and clean underneath and around unit. | Annually | ||||||||
| 2. Clean condenser and evaporator coils. | Annually | ||||||||
| 3. Check operation of solenoid valves (refrigerant). | Annually | ||||||||
| 4. Straighten fin tubes with fin comb. | Annually | ||||||||
| 5. Check electrical connections for tightness. | Annually | ||||||||
| 6. Check mounting for tightness. | Annually | ||||||||
| 7. Check contactors for burnt contacts. | Annually | ||||||||
| 8. Check for and remove all corrosion or rust from unit and supporting steel, prime and paint as necessary. | Annually | ||||||||
| 9. Check fan blade(s) or wheel(s) as applicable. Check belts for wear, appropriate tension and alignment as applicable, and replace if necessary. | Annually | ||||||||
| 10. Check wires at condenser electrical fused safety switches for tightness and burned insulation. | Annually | ||||||||
| 11. Lubricate bearings (if applicable) and motor(s). | Annually | ||||||||
| 12. Check refrigerant charge. | Annually | ||||||||
| 13. Check condensate pans and drains. | Annually | ||||||||
| 14. Visually inspect for proper insulation on refrigerant lines. | Annually | ||||||||
| 15. Check compresser crank case heater for proper operation (if applicable). | Annually | ||||||||
| 16. Run unit, check action of controls, relays, switches, and TXV valve and solenoid valves (if applicable). | Annually | ||||||||
| 17. Clean unit components, interior and exterior. | Annually | ||||||||
| 18. Clean up work area. | Annually | ||||||||
| 19. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | ||||||||
| VAV | VARIABLE AIR VOLUME BOXES | 99 | 99 | ||||||
| Semi-Annually | Typical timeframe: April and October. | 99 | 2 | Semi-Annually | 198 | ||||
| 1. Test and check operation of control valves, sensors, and air dampers. | Semi-Annual | ||||||||
| 2. Adjust controls as necessary to ensure proper operation. | Semi-Annual | ||||||||
| 3. Clean unit components, interior and exterior. | Semi-Annual | ||||||||
| 4. Clean up work area. | Semi-Annual | ||||||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Semi-Annual | ||||||||
| HEATING EQUIPMENT | |||||||||
| GBOIL | BOILER, GAS, HOT WATER, W/ML, 701 to 1,000 MBTUH | 6 | 6 | ||||||
| (MUD/WATER LEGS ACCESSIBLE = W/ML) | |||||||||
| Typical timeframe: |
September-April (8 months)
| Bi-Weekly | 6 | 16 | Bi-Weekly - Typical timeframe: Sept - Apr (8 mos) | 96 | ||||
| 1. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Bi-Weekly | |||||||
| 2. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Bi-Weekly | |||||||
| 3. Inspect all limit and operating controls to ensure proper operation. | Bi-Weekly | |||||||
| 4. Inspect circulating pumps on boiler. | Bi-Weekly | |||||||
| 5. Inspect for proper combustion air. | Bi-Weekly | |||||||
| 6. Visually inspect for proper insulation on water lines. | Bi-Weekly | |||||||
| 7. Clean and secure mechanical room. | Bi-Weekly | |||||||
| 8. COMPLETE AND SIGN MAINTENANCE TAG. | Bi-Weekly | |||||||
| Annually | 6 | 1 | Annually | 6 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Annually | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Annually | |||||||
| 3. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Annually | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Annually | |||||||
| 5. Inspect circulating pumps on boiler. | Annually | |||||||
| 6. Inspect for proper combustion air. | Annually | |||||||
| 7. Visually inspect for proper insulation on water lines. | Annually | |||||||
| 8. Inspect burner and flue door gaskets. | Annually | |||||||
| 9. Inspect and clean cross and T fittings and piping. | Annually | |||||||
| 10. Inspect vent pipe and barometric damper. | Annually | |||||||
| 11. Inspect automatic/manual air vents for proper operation. | Annually | |||||||
| 12. Inspect condensate traps for proper operation (combustion chamber). | Annually | |||||||
| 13. Inspect and clean boiler flues, tubes, and combustion chamber. | Annually | |||||||
| 14. Clean pilot and burner. | Annually | |||||||
| 15. For closed loop hot water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems. Test for ph, alkalinity, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government. | Annually | |||||||
| 16. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion. | Annually | |||||||
| 17. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function. | Annually | |||||||
| 18. Inspect boiler drain valves for proper operation. | Annually | |||||||
| 19. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation. | Annually | |||||||
| 20. Check and grease gas cocks, check gas piping for leaks from cock to appliance. | Annually | |||||||
| 21. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log. | Annually | |||||||
| 22. Inspect and clean the low water sensing probe. | Annually | |||||||
| 23. Check for proper operation of expansion tank. | Annually | |||||||
| 24. Inspect flow switches for proper operation. | Annually | |||||||
| 25. Clean unit components, interior and exterior. | Annually | |||||||
| 26. Clean and secure mechanical room. | Annually | |||||||
| 27. Clean and flush mud/water legs. | Annually | |||||||
| 28. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| GBOIL | BOILER, GAS, HOT WATER, NO ML, 121 to 300 MBTUH | 11 | ||||||
| GBOIL | BOILER, GAS, HOT WATER, NO ML, 0 to 300 MBTUH | 34 | ||||||
| GBOIL | BOILER, GAS, HOT WATER, NO ML, 301 to 500 MBTUH | 5 | ||||||
| GBOIL | BOILER, GAS, HOT WATER, NO ML, 501 to 700 MBTUH | 13 | ||||||
| GBOIL | BOILER, GAS, HOT WATER, NO ML, 701 to 1,000 MBTUH | 13 | ||||||
| GBOIL | BOILER, GAS, HOT WATER, W/ ML, 701 to 1,000 MBTUH | 16 | ||||||
| (MUD/WATER LEGS NOT ACCESSIBLE = NO ML) | 92 | 92 | ||||||
| Typical timeframe: |
September-April (8 months)
| Bi-Weekly | 92 | 16 | Bi-Weekly | 1472 | ||||
| 1. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Bi-Weekly | |||||||
| 2. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Bi-Weekly | |||||||
| 3. Inspect all limit and operating controls to ensure proper operation. | Bi-Weekly | |||||||
| 4. Inspect circulating pumps on boiler. | Bi-Weekly | |||||||
| 5. Inspect for proper combustion air. | Bi-Weekly | |||||||
| 6. Visually inspect for proper insulation on water lines. | Bi-Weekly | |||||||
| 7. Clean and secure mechanical room. | Bi-Weekly | |||||||
| 8. COMPLETE AND SIGN MAINTENANCE TAG. | Bi-Weekly | |||||||
| Annually | 92 | 1 | Annually | 92 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Annually | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Annually | |||||||
| 3. Check water level, boiler pressure and temperature, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Annually | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Annually | |||||||
| 5. Inspect circulating pumps on boiler. | Annually | |||||||
| 6. Inspect for proper combustion air. | Annually | |||||||
| 7. Visually inspect for proper insulation on water lines. | Annually | |||||||
| 8. Inspect burner and flue door gaskets. | Annually | |||||||
| 9. Inspect and clean cross and T fittings and piping. | Annually | |||||||
| 10. Inspect vent pipe and barometric damper. | Annually | |||||||
| 11. Inspect automatic/manual air vents for proper operation. | Annually | |||||||
| 12. Inspect condensate traps for proper operation (combustion chamber). | Annually | |||||||
| 13. Inspect and clean boiler flues, tubes, and combustion chamber. | Annually | |||||||
| 14. Clean pilot and burner. | Annually | |||||||
| 15. For closed loop hot water systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems. Test for ph, alkalinity, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Test and treat systems with propylene glycol for freeze and burst protection (no less than 35% mix by volume). Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government. | Annually | |||||||
| 16. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion. | Annually | |||||||
| 17. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function. | Annually | |||||||
| 18. Inspect boiler drain valves for proper operation. | Annually | |||||||
| 19. Bottom blow mud/water legs. | Annually | |||||||
| 20. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation. | Annually | |||||||
| 21. Check and grease gas cocks, check gas piping for leaks from cock to appliance. | Annually | |||||||
| 22. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log. | Annually | |||||||
| 23. Inspect and clean the low water sensing probe. | Annually | |||||||
| 24. Check for proper operation of expansion tank. | Annually | |||||||
| 25. Inspect flow switches for proper operation. | Annually | |||||||
| 26. Clean unit components, interior and exterior. | Annually | |||||||
| 27. Clean and secure mechanical room. | Annually | |||||||
| 28. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| GBOIL | BOILER, GAS, STEAM, W/ML, 500 to 700 MBTUH | 6 | ||||||
| GBOIL | BOILER, GAS, STEAM, W/ML, 701 to 1,000 MBTUH | 7 | ||||||
| GBOIL | BOILER, GAS, STEAM, W/ML, over 1,000 MBTUH | 1 | ||||||
| (MUD/WATER LEGS ACCESSIBLE = W/ML) | 14 | 14 | ||||||
| Typical timeframe: |
September-April (8 months)
| Bi-Weekly | 14 | 16 | Bi-Weekly (Typical timeframe: Sept - Apr) 8 months | 224 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Bi-Weekly | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Bi-Weekly | |||||||
| 3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Bi-Weekly | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Bi-Weekly | |||||||
| 5. Inspect condensate return pumps on boiler. | Bi-Weekly | |||||||
| 6. Inspect for proper combustion air. | Bi-Weekly | |||||||
| 7. Visually inspect for proper insulation on steam and water lines. | Bi-Weekly | |||||||
| 8. Clean and secure mechanical room. | Bi-Weekly | |||||||
| 9. COMPLETE AND SIGN MAINTENANCE TAG. | Bi-Weekly | |||||||
| Annually | 14 | 1 | Annually | 14 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Annually | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Annually | |||||||
| 3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Annually | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Annually | |||||||
| 5. Inspect condensate return pumps on boiler. | Annually | |||||||
| 6. Inspect for proper combustion air. | Annually | |||||||
| 7. Visually inspect for proper insulation on steam and water lines. | Annually | |||||||
| 8. Inspect burner and flue door gaskets. | Annually | |||||||
| 9. Inspect and clean syphon tubes for pressuretrols and gauges. | Annually | |||||||
| 10. Inspect and clean cross and T fittings and piping. | Annually | |||||||
| 11. Inspect vent pipe and barometric damper. | Annually | |||||||
| 12. Inspect automatic/manual air vents for proper operation. | Annually | |||||||
| 13. Inspect condensate traps for proper operation (combustion chamber). | Annually | |||||||
| 14. Inspect and clean boiler flues, tubes, and combustion chamber. | Annually | |||||||
| 15. Clean pilot and burner. | Annually | |||||||
| 16. For steam systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems (heating loop). Test for alkalinity, ph, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government. | Annually | |||||||
| 17. Inspect proper operation of steam trap and clean strainers. | Annually | |||||||
| 18. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion. | Annually | |||||||
| 19. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function. | Annually | |||||||
| 20. Inspect boiler drain valves for proper operation. | Annually | |||||||
| 21. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation. | Annually | |||||||
| 22. Check and grease gas cocks, check gas piping for leaks from cock to appliance. | Annually | |||||||
| 23. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log. | Annually | |||||||
| 24. Inspect and clean the low water sensing probe. | Annually | |||||||
| 25. Check for proper operation of water feed control valve and clean strainer. | ||||||||
| 26. Clean unit components, interior and exterior. | Annually | |||||||
| 27. Clean and secure mechanical room. | Annually | |||||||
| 28. Clean and flush mud/water legs. | Annually | |||||||
| 29. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| GBOIL | BOILER, GAS, STEAM, NO ML, 501 to 700 MBTUH | 5 | ||||||
| GBOIL | BOILER, GAS, STEAM, NO ML, 701 to 1,000 MBTUH | 4 | ||||||
| GBOIL | BOILER, GAS, STEAM, NO ML, over 1,000 MBTUH | 16 | ||||||
| (MUD/WATER LEGS NOT ACCESSIBLE = NO ML) | 25 | 25 | ||||||
| Typical timeframe: |
September-April (8 months)
| Bi-Weekly | 25 | 16 | Bi-Weekly (Typical timeframe: Sept - Apr) 8 months | 400 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Bi-Weekly | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Bi-Weekly | |||||||
| 3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Bi-Weekly | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Bi-Weekly | |||||||
| 5. Inspect condensate return pumps on boiler. | Bi-Weekly | |||||||
| 6. Inspect for proper combustion air. | Bi-Weekly | |||||||
| 7. Visually inspect for proper insulation on steam and water lines. | Bi-Weekly | |||||||
| 8. Clean and secure mechanical room. | Bi-Weekly | |||||||
| 9. COMPLETE AND SIGN MAINTENANCE TAG. | Bi-Weekly | |||||||
| Annually | 25 | 1 | Annually | 25 | ||||
| 1. Blow down primary and secondary (if applicable) low water cut-off(s) to ensure proper operation. | Annually | |||||||
| 2. Test and reset probe-type low water cut-off if applicable and record on boiler operating log. | Annually | |||||||
| 3. Check water level, boiler pressure, flue gas temperature, flame condition, and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Annually | |||||||
| 4. Inspect all limit and operating controls to ensure proper operation. | Annually | |||||||
| 5. Inspect condensate return pumps on boiler. | Annually | |||||||
| 6. Inspect for proper combustion air. | Annually | |||||||
| 7. Visually inspect for proper insulation on steam and water lines. | Annually | |||||||
| 8. Inspect burner and flue door gaskets. | Annually | |||||||
| 9. Inspect and clean syphon tubes for pressuretrols and gauges. | Annually | |||||||
| 10. Inspect and clean cross and T fittings and piping. | Annually | |||||||
| 11. Inspect vent pipe and barometric damper. | Annually | |||||||
| 12. Inspect automatic/manual air vents for proper operation. | Annually | |||||||
| 13. Inspect condensate traps for proper operation (combustion chamber). | Annually | |||||||
| 14. Inspect and clean boiler flues, tubes, and combustion chamber. | Annually | |||||||
| 15. Clean pilot and burner. | Annually | |||||||
| 16. For steam systems -- Test, treat as necessary, and retest (to ensure the treatment is adequate) boiler water and distribution systems (heating loop). Test for alkalinity, ph, phosphate, nitrates, hardness, oxygen, conductivity (total dissolved solids), and treat to control oxygen level, and to prevent the formation of scale, corrosion, and the growth of any bacteria. Record test and treatment type on Test and Treament Log, and provide a copy of the log to the Government. | Annually | |||||||
| 17. Inspect proper operation of steam trap and clean strainers. | Annually | |||||||
| 18. Check operation of the check valves. Manually lift safety relief valve and ensure that it lifts and reseats. Replace if leaking or showing any sign of corrosion. | Annually | |||||||
| 19. Inspect ignitor, flame sensor, pilot, thermocouple and burner. Ensure pilot safety function. | Annually | |||||||
| 20. Inspect boiler drain valves for proper operation. | Annually | |||||||
| 21. Bottom blow mud/water legs. | Annually | |||||||
| 22. Perform maintenance on low water cutoff IAW manufacturer's recommendations and test for proper operation. | Annually | |||||||
| 23. Check and grease gas cocks, check gas piping for leaks from cock to appliance. | Annually | |||||||
| 24. Perform efficiency test and set burner for optimum operation. Record test results on Operating Log. | Annually | |||||||
| 25. Inspect and clean the low water sensing probe. | Annually | |||||||
| 26. Check for proper operation of water feed control valve and clean strainer. | ||||||||
| 27. Clean unit components, interior and exterior. | Annually | |||||||
| 28. Clean and secure mechanical room. | Annually | |||||||
| 29. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| EBOIL | BOILER, ELECTRIC, HOT WATER, NO ML | 1 | 1 | |||||
| Bi-Weekly | 1 | 16 | Bi-Weekly (Typical timeframe: Sept - Apr) 8 months | 16 | ||||
| 1. Inspect all limit and operating controls to ensure proper operation. | Bi-Weekly | |||||||
| 2. Check boiler water pressure and temperature and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Bi-Weekly | |||||||
| 3. Visually inspect for proper insulation on water lines. | Bi-Weekly | |||||||
| 4. Inspect circulating pump and safety relief valve on boiler. | Bi-Weekly | |||||||
| 5. Clean and secure mechanical room. | Bi-Weekly | |||||||
| 6. COMPLETE AND SIGN MAINTENANCE TAG. | Bi-Weekly | |||||||
| Annually | 1 | 1 | Annually | 1 | ||||
| 1. Inspect all limit and operating controls to ensure proper operation. | Annually | |||||||
| 2. Check boiler water pressure and temperature and any other applicable items shown on the boiler operating log. Record results on boiler operating log. | Annually | |||||||
| 3. Visually inspect for proper insulation on water lines. | Annually | |||||||
| 4. Inspect circulating pump and safety relief valve on boiler. | Annually | |||||||
| 5. Inspect heating element and clean any scale built up on the elements. | Annually | |||||||
| 6. Check operation of the check valves. Manually lift safety relief valve. Check safety relief valve for any signs of leaking or corrosion. | Annually | |||||||
| 7. Check all electrical connections to ensure that they are tight. | Annually | |||||||
| 8. Clean unit components, interior and exterior. | Annually | |||||||
| 9. Clean and secure mechanical room. | Annually | |||||||
| 10. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| GFAC | COMBINATION HTG/COOLING UNIT <= 5 TON - WALL, ROOF, OR PAD MTD, ELECTRIC-at COLs | HEATING AND COOLING | 8 | 8 | ||||
| HEATING | Typical timeframe: |
October - March (6 months)
| Monthly | 8 | 5 | Monthly-Heating (Typical timeframe: Oct - Mar) 6 months | 40 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Monthly-Heating | ||||
| 2. Clean up work area. | Monthly-Heating | ||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly-Heating | ||||
| COOLING | Typical timeframe: |
April - September (6 months)
| Monthly | 8 | 6 | Monthly-Cooling (Typical timeframe: Apr - Sep) 6 months | 48 | ||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Monthly-Cooling | |||||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Monthly-Cooling | |||||||
| 3. Clean up work area. | Monthly-Cooling | |||||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly-Cooling | |||||||
| Annually | 8 | 1 | Annually | 8 | ||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually | |||||||
| 2. Inspect heating element. | Annually | |||||||
| 3. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually | |||||||
| 4. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually | |||||||
| 5. Remove debris from exterior screens and grilles, clean around unit. | Annually | |||||||
| 6. Clean condenser, evaporator coil, drain pan, drain pipe, and traps. | Annually | |||||||
| 7. Straighten and comb fins. | Annually | |||||||
| 8. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually | |||||||
| 9. Remove dirt or rust from all interior parts, repaint as necessary. | Annually | |||||||
| 10. Inspect and adjust fresh air damper and clean external screens, if applicable. | Annually | |||||||
| 11. Lubricate motor and fan bearings. | Annually | |||||||
| 12. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear. | Annually | |||||||
| 13. Check unit and ductwork for proper insulation. | Annually | |||||||
| 14. Check for proper refrigerant charge. | Annually | |||||||
| 15. Clean unit components, interior and exterior. | Annually | |||||||
| 16. Clean up work area. | Annually | |||||||
| 17. COMPLETE AND SIGN MAINTENANCE TAG. | Annually | |||||||
| PTAC | COMBINATION HTG/COOLING UNIT <= 5 TON - WALL, ROOF, OR PAD MTD, HEAT PUMP (packaged unit)-not COLs | HEATING AND COOLING | 180 | 180 | ||||
| HEATING | Typical timeframe: |
October - March (6 months)
| Quarterly | 180 | 3 | Quarterly-Heating | 540 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Quarterly-Heating | ||||
| 2. Clean up work area. | Quarterly-Heating | ||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly-Heating | ||||
| Annually | 180 | 1 | Annually (Fall) | 180 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (fall) | ||||
| 2. Inspect heating element. | Annually (fall) | ||||
| 3. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (fall) | ||||
| 4. Clean up work area. | Annually (fall) | ||||
| 5. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (fall) | ||||
| COOLING | Typical timeframe: |
April - September (6 months)
| Quarterly | Quarterly-Cooling | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Quarterly-Cooling | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Quarterly-Cooling | |||||
| 3. Clean up work area. | Quarterly-Cooling | |||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly-Cooling | |||||
| Annually | Annually-(Spring) | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (spring) | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Annually (spring) | |||||
| 3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps. | Annually (spring) | |||||
| 4. Straighten and comb fins. | Annually (spring) | |||||
| 5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (spring) | |||||
| 6. Remove dirt or rust from all interior parts, repaint as necessary. | Annually (spring) | |||||
| 7. Inspect and adjust fresh air damper and clean external screens, if applicable. | Annually (spring) | |||||
| 8. Lubricate motor and fan bearings. | Annually (spring) | |||||
| 9. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear. Check belts (if any) for wear, appropriate tension and alignment, replace if necessary. | Annually (spring) | |||||
| 10. Check unit and ductwork for proper insulation. | Annually (spring) | |||||
| 11. Check for proper refrigerant charge. | Annually (spring) | |||||
| 12. Clean unit components, interior and exterior. | Annually (spring) | |||||
| 13. Clean up work area. | Annually (spring) | |||||
| 14. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (spring) | |||||
| GFAC | COMBINATION HTG/COOLING UNIT <= 5 TON - GAS, WALL, ROOF, OR PAD MTD-at COLS (FOBs) | HEATING AND COOLING | 240 | 240 | ||
| HEATING | Typical timeframe: |
October - March (6 months)
| Bi-Monthly | 240 | 3 | Monthly-Heating (Typical timeframe: Oct - Mar) 6 months | 720 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Monthly-Heating | ||||
| 2. Clean up work area. | Monthly-Heating | ||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly-Heating | ||||
| Annually | 240 | 1 | Annually (Fall) | 240 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (fall) | ||||
| 2. Inspect heat exchanger, gaskets, and venting. | Annually (fall) | ||||
| 3. Inspect exhaust and intake for restrictions. | Annually (fall) | ||||
| 4. Check burner for proper operation. Clean burner. | Annually (fall) | ||||
| 5. Check incoming static gas pressure, the manifold gas pressure, and all gas connections and gas controls for leaks and proper operation. | Annually (fall) | ||||
| 6. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (fall) | ||||
| 7. Inspect ignitor, flame sensor, pilot, and burner. Ensure pilot safety function. Adjust burner for efficiency. | Annually (fall) | ||||
| 8. Clean up work area. | Annually (fall) | ||||
| 9. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (fall) | ||||
| COOLING | Typical timeframe: |
April - September (6 months)
| Monthly | Monthly-Cooling (Typical timeframe: apr - Sep) 6 months | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Monthly-Cooling | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Monthly-Cooling | |||||
| 3. Clean up work area. | Monthly-Cooling | |||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Monthly-Cooling | |||||
| Annually | Annually (Spring) | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (spring) | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Annually (spring) | |||||
| 3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps. | Annually (spring) | |||||
| 4. Straighten and comb fins. | Annually (spring) | |||||
| 5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (spring) | |||||
| 6. Remove dirt or rust from all interior parts, repaint as necessary. | Annually (spring) | |||||
| 7. Check fresh air dampers and actuators for proper operation. | Annually (spring) | |||||
| 8. Lubricate motor and fan bearings. | Annually (spring) | |||||
| 9. Adjust alignment of motor and fan(s) if necessary. Check bearings for excessive wear. Check belts, if any, for wear, appropriate tension and alignment, replace if necessary. | Annually (spring) | |||||
| 10. Check unit and ductwork for proper insulation. | Annually (spring) | |||||
| 11. Check for proper refrigerant charge. | Annually (spring) | |||||
| 12. Clean unit components, interior and exterior. | Annually (spring) | |||||
| 13. Clean up work area. | Annually (spring) | |||||
| 14. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (spring) | |||||
| PTAC | COMBINATION HTG/COOLING UNIT <= 5 TON - GAS, WALL, ROOF, OR PAD MTD-not COLs | HEATING AND COOLING | 112 | 112 | ||
| HEATING | Typical timeframe: |
October - March (6 months)
| Quarterly | 112 | 3 | Quarterly-Heating | 336 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Quarterly-Heating | ||||
| 2. Clean up work area. | Quarterly-Heating | ||||
| 3. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly-Heating | ||||
| Annually | 112 | 1 | Annually (Fall) | 112 | |
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (fall) | ||||
| 2. Inspect heat exchanger, gaskets, and venting. | Annually (fall) | ||||
| 3. Inspect exhaust and intake for restrictions. | Annually (fall) | ||||
| 4. Check burner for proper operation. Clean burner. | Annually (fall) | ||||
| 5. Check incoming static gas pressure, the manifold gas pressure, and all gas connections and gas controls for leaks and proper operation. | Annually (fall) | ||||
| 6. Check heating controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (fall) | ||||
| 7. Inspect ignitor, flame sensor, pilot, and burner. Ensure pilot safety function. Adjust burner for efficiency. | Annually (fall) | ||||
| 8. Clean up work area. | Annually (fall) | ||||
| 9. COMPLETE AND SIGN MAINTENANCE TAG. | Annually (fall) | ||||
| COOLING | Typical timeframe: |
April - September (6 months)
| Quarterly | Quarterly-Cooling | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Quarterly-Cooling | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Quarterly-Cooling | |||||
| 3. Clean up work area. | Quarterly-Cooling | |||||
| 4. COMPLETE AND SIGN MAINTENANCE TAG. | Quarterly-Cooling | |||||
| Annually | Annually (Spring) | |||||
| 1. Inspect and clean or replace filters, if needed. Record date on non-washable filters. | Annually (spring) | |||||
| 2. Remove debris from exterior screens and grilles, clean around unit. | Annually (spring) | |||||
| 3. Clean condenser, evaporator coil, drain pan, drain pipe, and traps. | Annually (spring) | |||||
| 4. Straighten and comb fins. | Annually (spring) | |||||
| 5. Check cooling controls, relays, contactors, and switches for proper operation. Check wire connections for tightness, check for burnt insulation and burnt contacts. | Annually (spring) |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .