W912ER-16-R-0008-0004.pdf

PDF 19 KB Posted

Attached to
Kuwait Air Defense Improvements Federal contract opportunity
Solicitation number
W912ER-16-R-0008
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Kuwait Air Defense Improvements, newest first.
File Type Posted
Exhibit_1.pdf PDF
AM_8_Specifications_ _Attachment.pdf PDF
AM_8_VOLUME_2_DRAWING.pdf PDF
AM_8_VOLUME_3_DRAWING_.pdf PDF
W912ER-16-R-0008-0008.pdf PDF
AM_7_Proposal_Schedule_.pdf PDF
ATTACHMENT_3_Relevancy_Matrix.pdf PDF
W912ER-16-R-0008-0007.pdf PDF
AM_6_Specifications_19_Aug_16.pdf PDF
AM_6_VOLUME_2_DRAWINGS_19_Aug_16.pdf PDF
AM_6_VOLUME_1_DRAWINGS_19_Aug_16.pdf PDF
AM_6_VOLUME_4_DRAWINGS_19_Aug_16.pdf PDF
W912ER-16-R-0008-0006.pdf PDF
AM_6_Cost_Breakdown_19_Aug_16.pdf PDF
AM_6_VOLUME_3_DRAWINGS_19_Aug_16.pdf PDF
W912ER-16-R-0008-0005.pdf PDF
AM_4_Cost_Breakdown.pdf PDF
AM_4_VOLUME_2_DRAWING.pdf PDF
AM_4_Proposal_Schedule_.pdf PDF
Exhibit_1.pdf PDF
AM_4_Specifications.pdf PDF
AM_4_VOLUME_3_DRAWING.pdf PDF
AM_3_VOLUME_1_DRAWING.pdf PDF
AM_3_VOLUME_2_DRAWING.pdf PDF
Exhibit_1.pdf PDF
AM_3_Specifications_28_Jul_16.pdf PDF
AM_3_VOLUME_4_DRAWING.pdf PDF
W912ER-16-R-0008-0003.pdf PDF
AM_3_VOLUME_3_DRAWING.pdf PDF
W912ER-16-R-0008-0002.pdf PDF
Appendix_D_Attachment.pdf PDF
Attachment_2_Prime_Construction_Experience_Form.pdf PDF
Attachment_1_Experience_Overview_Sheet.pdf PDF
Amendment_W912ER-16-R-0008-0001.pdf PDF
Attachment_3_Relevancy_Matrix.pdf PDF
Volume_1_Specifications.pdf PDF
Proposal_Schedule.pdf PDF
Volume_3_Specifications.pdf PDF
W912ER-16-R-0008.pdf PDF
Volume_3_Drawings.pdf PDF
Volume_4_Drawings.pdf PDF
Volume_2_Specifications.pdf PDF
Volume_2_Drawings.pdf PDF
Volume_1_Drawings.pdf PDF
DRAFT_443309_-_VOLUME_3_03-31-16.pdf PDF
DRAFT_CDC_Vol_2_of_3_11-Jan-15.pdf PDF
DRAFT_443309_-_VOLUME_4_03-31-16.pdf PDF
DRAFT_CDC_Vol_3_of_3_11-Jan-15.pdf PDF
DRAFT_443309_-_VOLUME_1_03-31-16.pdf PDF
DRAFT_443309_-_VOLUME_2_03-31-16.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0004 is to revise; (1) Specifications, (2) Draw ings, (3) Proposal Schedule, (4) Exhibit 1, and (5) Delete 52.232-12 Alt I.

SEE CONTINUATION PAGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER-16-R-0008

X 9B. DATED (SEE ITEM 11)

29-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2016

CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER-16-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The purpose of Amendment 0004 is to revise; (1) Specifications, (2) Drawings, (3) Proposal Schedule,

(4) Exhibit 1, and (5) Delete 52.232-12 Alt I.

1.Proposal Schedule and Cost Breakdown – Replaced in their entirety

2. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.

The following has been revised/added:

Section 01 11 00 Paragraph 1.1.3 – page 4

Section 01 15 00.12 10 Paragraph 1.9 – page 5 Paragraph 1.17 – page 7 Attachment A – Added in its entirety Section 01 80 05.12 10 Paragraph 1.1.1 – page 2 Paragraph 2.5 – page 3 Paragraph 3 – page 4 Paragraph 5.1 – page 5 Paragraph 6 – page 5 Appendix B – Added in its entirety

Section 03 30 00.00 10 Paragraph 2.1.6 – page 14

Section 26 20 00 Paragraph 2.18.1 – page 19

Section 26 41 01.00 10 Paragraph 2.2.4 – page 4

3. Drawings. Revisions to the following drawings are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.

Volume 2 G-012 Index of Drawings Volume 2 Sheet 1 G-013 Index of Drawings Volume 2 Sheet 2 Site Design: XT-101, XT-102, XT-103, XT-504, XT-507 and XT-601 443309A Engagement Control Station – Site 06: S-401, E-106, E-107 and T-102 443309B Headquarters Building – Site 06: T-101 and T-401 443309H Storage Facility: E-101

W912ER-16-R-0008

443309I Frequency Converter – PDU Shelter: E-101 Volume 3 G-014 Index of Drawings Volume 3 Sheet 1 G-015 Index of Drawings Volume 3 Sheet 2 Site Design: XT-601 443309A Engagement Control Station – Site 07: S-411, E-114 and T-112 443309B Headquarters Building – Site 07: T-121 and T-411 443309H Storage Facility: E-101 443309I Frequency Converter – PDU Shelter: E-101