W912ER-16-R-0008.pdf

PDF 572 KB Posted

Attached to
Kuwait Air Defense Improvements Federal contract opportunity
Solicitation number
W912ER-16-R-0008
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Solicitation W912ER-16-R-0008

View the file

Other files for this federal contract opportunity

Other files attached to Kuwait Air Defense Improvements, newest first.
File Type Posted
Exhibit_1.pdf PDF
AM_8_VOLUME_3_DRAWING_.pdf PDF
W912ER-16-R-0008-0008.pdf PDF
AM_8_Specifications_ _Attachment.pdf PDF
AM_8_VOLUME_2_DRAWING.pdf PDF
W912ER-16-R-0008-0007.pdf PDF
AM_7_Proposal_Schedule_.pdf PDF
ATTACHMENT_3_Relevancy_Matrix.pdf PDF
AM_6_VOLUME_4_DRAWINGS_19_Aug_16.pdf PDF
W912ER-16-R-0008-0006.pdf PDF
AM_6_Cost_Breakdown_19_Aug_16.pdf PDF
AM_6_VOLUME_3_DRAWINGS_19_Aug_16.pdf PDF
AM_6_Specifications_19_Aug_16.pdf PDF
AM_6_VOLUME_2_DRAWINGS_19_Aug_16.pdf PDF
AM_6_VOLUME_1_DRAWINGS_19_Aug_16.pdf PDF
W912ER-16-R-0008-0005.pdf PDF
AM_4_Proposal_Schedule_.pdf PDF
Exhibit_1.pdf PDF
AM_4_Specifications.pdf PDF
AM_4_VOLUME_3_DRAWING.pdf PDF
W912ER-16-R-0008-0004.pdf PDF
AM_4_Cost_Breakdown.pdf PDF
AM_4_VOLUME_2_DRAWING.pdf PDF
AM_3_VOLUME_4_DRAWING.pdf PDF
AM_3_VOLUME_1_DRAWING.pdf PDF
W912ER-16-R-0008-0003.pdf PDF
AM_3_VOLUME_3_DRAWING.pdf PDF
AM_3_VOLUME_2_DRAWING.pdf PDF
Exhibit_1.pdf PDF
AM_3_Specifications_28_Jul_16.pdf PDF
W912ER-16-R-0008-0002.pdf PDF
Attachment_2_Prime_Construction_Experience_Form.pdf PDF
Attachment_1_Experience_Overview_Sheet.pdf PDF
Amendment_W912ER-16-R-0008-0001.pdf PDF
Attachment_3_Relevancy_Matrix.pdf PDF
Appendix_D_Attachment.pdf PDF
Volume_4_Drawings.pdf PDF
Volume_2_Specifications.pdf PDF
Volume_1_Specifications.pdf PDF
Proposal_Schedule.pdf PDF
Volume_3_Specifications.pdf PDF
Volume_2_Drawings.pdf PDF
Volume_1_Drawings.pdf PDF
Volume_3_Drawings.pdf PDF
DRAFT_443309_-_VOLUME_3_03-31-16.pdf PDF
DRAFT_CDC_Vol_2_of_3_11-Jan-15.pdf PDF
DRAFT_443309_-_VOLUME_4_03-31-16.pdf PDF
DRAFT_CDC_Vol_3_of_3_11-Jan-15.pdf PDF
DRAFT_443309_-_VOLUME_1_03-31-16.pdf PDF
DRAFT_443309_-_VOLUME_2_03-31-16.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Foreign Military Sales (FMS) project consists of the construction of two (2) Air Defense Improvements Fire Unit sites (Fire Unit #6 & Fire Unit #7) and an Information Coordination Central (ICC) building located in Kuwait. In addition to the construction of two Air Defense Improvements Fire Unit Sites and ICC building, this project includes operation and maintenance services for three years. The contractor shall provide all management, administration, quality control, labor, transportation, equipment, materials, vehicles, heavy equipment, supplies and other items as necessary to perform the services contained in the Scope of Work.

Magnitude of Projects: Betw een $25,000,000 and $100,000,000; Note: (a) The Government reserves the right to incorporate the proposal into the contract and distribute the proposal as deemed necessary. Any deviations from the proposal must be approved by the Contracting Off icer; (b) The contractor is required to provide all documentation requested in this solicitation (tender) to include Defense Base Act (DBA) Insurance after contract aw ard and prior to Notice to Proceed (NTP); (c) Performance and Payment Bonds (30%) are required.

MARISSA LOUDEN 540-665-5324

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jun-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________515 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________08 Aug 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS-CETAM-CT

MIDDLE EAST DISTRICT, CETAM-CT

PO BOX 2250

WINCHESTER VA 22604-1450

W912ER

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912ER-16-R-0008 114

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912ER-16-R-0008

Section 00 11 00 - Standard Form (SF) 1442 and CLIN Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Site Topographical/Geotech Survey

FFP

Site Topographical and Geotech Survey for ALL THREE PROJECT sites in accordance with the contract documents FOB: Destination

NET AMT

0002 1 Job AIR DEFENSE ICC - Mob and Demob

FFP

Mobilization and Demobilization in accordance with the contract documents

0003 1 Job AIR DEFENSE ICC - Investigative Analysis

FFP

Investigative Analysis/Reports in accordance with the contract documents

0004 1 Job AIR DEFENSE ICC - Screen Room Bldg

FFP

Construct a Screen Room Building in accordance with the contract documents

0005 1 Job AIR DEFENSE ICC -Renovate Air Operations

FFP

Renovate Air Operations Center Improvements in accordance with the contract documents

0006 1 Job AIR DEFENSE ICC - Elect Dist System

FFP

Construct Electrical Distribution System in accordance with the contract

0007 1 Job AIR DEFENSE ICC - Data and Tel Com Dist

FFP

Construct Data and Telephone Communication Distribution System in accordance with the contract documents

0008 1 Job AIR DEFENSE SITE 6 - Mob and Demob

FFP

0009 1 Job AIR DEFENSE SITE 6 -Hqt Bldg

FFP

Construct a Headquarters Building in accordance with the contract documents

0010 1 Job AIR DEFENSE SITE 6 - Toilet Bldg

FFP

Construct a Toilet Building in accordance with the contract documents

0011 1 Job AIR DEFENSE SITE 6 - Guard House Bldg

FFP

Construct a Guard House Building in accordance with the contract documents

0012 1 Job AIR DEFENSE SITE 6 - Engage Control St

FFP

Construct Engagement Control Station (ECS) in accordance with the contract

0013 1 Job AIR DEFENSE SITE 6 - Guard Towers

FFP

Construct Guard Towers in accordance with the contract documents

0014 1 Job AIR DEFENSE SITE 6- Freq Converter Bldgs

FFP

Construct Frequency Converter Buildings in accordance with the contract

0015 1 Job AIR DEFENSE SITE 6 - Equip Pads/Alaska

FFP

Construct Equipment Pads and Alaska Barriers in accordance with the contract

0016 1 Job AIR DEFENSE SITE 6 - Storage Facility

FFP

Construct Storage Facility and Storage Pad in accordance with the contract

0017 1 Job AIR DEFENSE SITE 6 - Parking w/Sunshade

FFP

Construct Car Parking with Sunshade in accordance with the contract documents

0018 1 Job AIR DEFENSE SITE 6 -Truck Parking w/ Sun

FFP

Construct Truck Parking with Sunshade in accordance with the contract documents

0019 1 Job AIR DEFENSE SITE 6 - Fuel Truck Parking

FFP

Construct Fuel Truck Parking and Fuel Tank Storage with the Sunshades in

0020 1 Job AIR DEFENSE SITE 6 - Telecom Tower

FFP

Construct Telecommunication Tower in accordance with the contract documents

0021 1 Job AIR DEFENSE SITE 6- Power Plant Facility

FFP

Construct Power Plant Facility including but not limited to Generators, Transformers, Controls, Switchgears, etc., in accordance with the contract

0022 1 Job AIR DEFENSE SITE 6 - Roads and Sidewalks

FFP

Construct Roads and Sidewalks in accordance with the contract documents

0023 1 Job AIR DEFENSE SITE 6 - Security Fence, ECP

FFP

Construct Security Fence, Entry Control Points and Force Protection Systems in

0024 1 Job AIR DEFENSE SITE 6- Demolition/Site Work

FFP

Perform Demolition, Site Work, Site Development, Storm Drainage in accordance

0025 1 Job AIR DEFENSE SITE 6-Sewer Collection/Dist

FFP

Construct Sewer Collection and Distribution System including Leach Field in

0026 1 Job AIR DEFENSE SITE 6 - Power and Lighting

FFP

Construct Power and Lighting Distribution System including outside pole lighting in accordance with the contract documents

0027 1 Job AIR DEFENSE SITE 6- CCTV Security System

FFP

Construct CCTV Security System in accordance with the contract documents

0028 1 Job AIR DEFENSE SITE 6- Data and Tele Com

FFP

Construct Data and Telephone Communication Distribution System in accordance

0029 1 Job AIR DEFENSE SITE 7 - Mob and Demob

FFP

0030 1 Job AIR DEFENSE SITE 7 - Headquarters Bldg

FFP

Construct a Headquarters Building in accordance with the contract documents

0031 1 Job AIR DEFENSE SITE 7 - Toilet Building

FFP

Construct a Toilet Building in accordance with the contract documents

0032 1 Job AIR DEFENSE SITE 7 - Guard House Bldg

FFP

Construct a Guard House Building in accordance with the contract documents

0033 1 Job AIR DEFENSE SITE 7 - Engagement Control

FFP

Construct Engagement Control Station (ECS) with Concrete Ramps in accordance

0034 1 Job AIR DEFENSE 7 - Guard Towers

FFP

Construct Guard Towers in accordance with the contract documents

0035 1 Job AIR DEFENSE SITE 7- Freq Converter Bldgs

FFP

Construct Frequency Converter Buildings in accordance with the contract

0036 1 Job AIR DEFENSE SITE 7 - Equip Pads/Alaska

FFP

Construct Equipment Pads and Alaska Barriers in accordance with the contract

0037 1 Job AIR DEFENSE SITE 7- Storage Facility/Pad

FFP

Construct Storage Facility and Storage Pad in accordance with the contract

0038 1 Job AIR DEFENSE SITE 7 - Car Park w/Sunshade

FFP

Construct Car Parking with Sunshade in accordance with the contract documents

0039 1 Job AIR DEFENSE SITE 7 - Truck Park Sunshade

FFP

Construct Truck Parking with Sunshade in accordance with the contract documents

0040 1 Job AIR DEFENSE SITE 7- Fuel Truck Parking

FFP

Construct Fuel Truck Parking and Fuel Tank Storage with the Sunshade in

0041 1 Job AIR DEFENSE SITE 7- Telecomm Tower

FFP

Construct Telecommunication Tower in accordance with the contract documents

0042 1 Job AIR DEFENSE SITE 7-Power Plant Facility

FFP

Construct Power Plant Facility including but not limited to Generators, Transformers, Controls, Switchgears, etc., in accordance with the contract

0043 1 Job AIR DEFENSE SITE 7- Roads and Sidewalks

FFP

Construct Roads and Sidewalks in accordance with the contract document.

0044 1 Job AIR DEFENSE SITE 7- Security Fence, ECP

FFP

Construct Security Fence, Entry Control Points and Force Protection Systems in

0045 1 Job AIR DEFENSE SITE 7-Demolition, Site Work

FFP

Perform Demolition, Site Work, Site Development, Storm Drainage in accordance

0046 1 Job AIR DEFENSE SITE 7-Sewer Collection/Dist

FFP

Construct Sewer Collection and Distribution System including Leach Field in

0047 1 Job AIR DEFENSE SITE 7- Power/ Lighting Dist

FFP

Construct Power and Lighting Distribution System including outside pole lighting in accordance with the contract documents

0048 1 Job AIR DEFENSE SITE 7- CCTV Security System

FFP

Construct CCTV Security System in accordance with the contract documents

0049 1 Job AIR DEFENSE SITE 7 - Data/Telephone Com

FFP

Construct Data and Telephone Communication Distribution System in accordance

0050 1 Job OPTION AIR DEFENSE ICC - Replace Raised Access

FFP

OPTION 1: Replace Raised Access Flooring System in accordance with the contract documents

0051 1 Job OPTION AIR DEFENSE ICC - Replace HVAC Units

FFP

OPTION 2: Replace HVAC Units in accordance with the contract documents

0052 1 Job OPTION AIR DEFENSE SITE 6- Prayer Gathering Bld

FFP

OPTION 3: Construct Prayer Gathering Building in accordance with the contract

0053 1 Job OPTION AIR DEFENSE SITE 6- Car Parking/Shelter

FFP

OPTION 4: Construct Car Parking and Shelter in accordance with the contract

0054 1 Job OPTION AIR DEFENSE SITE 6 - Maint High-bay Fac

FFP

OPTION 5: Construct Maintenance High-bay Facility in accordance with the

0055 1 Job OPTION AIR DEFENSE SITE 6- Add Cost to Paved

FFP

OPTION 6: Additional Construct Cost to Paved Gravel Perimeter Patrol Road and Service Drive in accordance with the contract documents

0056 1 Job OPTION AIR DEFENSE SITE 7 - Hqts Bldg

FFP

OPTION 7: Construct Headquarters Building Additional Wing in accordance with the contract documents

0057 1 Job OPTION AIR DEFENSE SITE 7-Prayer Gathering Bldg

FFP

OPTION 8: Construct Prayer Gathering Building in accordance with the contract

0058 1 Job OPTION AIR DEFENSE SITE 7 - Car Parking/Shelter

FFP

OPTION 9: Construct Car Parking and Shelter in accordance with the contract

0059 1 Job OPTION AIR DEFENSE SITE 7 - Main High-bay Fac

FFP

OPTION 10: Construct Maintenance High-bay Facility in accordance with the

0060 1 Job OPTION AIR DEFENSE SITE 7 - Anti-Vehicle Ditch

FFP

OPTION 11: Construct Anti-Vehicle Ditch and Berm around exterior fence in

0061 1 Job OPTION Operation and Maintenance Services

FFP

OPTION 12: Operation and Maintenance Services for ALL Three Sites for the First (1st) year in accordance with the contract documents

0062 1 Job OPTION Operation and Maintenance Services

FFP

OPTION 13: Operation and Maintenance Services for ALL Three Sites for the Second (2nd) year in accordance with the contract documents

0063 1 Job OPTION Operation and Maintenance Services

FFP

OPTION 14: Operation and Maintenance Services for ALL Three Sites for the Third (3rd) year in accordance with the contract documents

Section 00 21 00 - Instructions, Conditions and Notices to Offerors

INDEX

ITEM DESCRIPTION

A BASIS FOR AWARD

B FACTORS TO BE EVALUATED

C EVALUATION APPROACH

D PROPOSAL SUBMISSION

E DISCUSSIONS

CLAUSES INCORPORATED BY REFERENCE

52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY

52.215-1 INSTRUCTIONS TO OFFERORS – COMPETITIVE

ACQUISITION

52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA – MODIFICATIONS

52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

OR INFORMATION OTHER THAN CERTIFIED COST OR

PRICING DATA

252.215-7007 NOTICE OF INTENT TO RESOLOCIT

252.215-7008 ONLY ONE OFFEROR

252.236-7008 CONTRACT PRICES – BIDDING SCHEDULES

CLAUSES INCORPORATED BY FULL TEXT

52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995) -- EFARS

52.216-1 TYPE OF CONTRACT

52.217-5 EVALUATION OF OPTIONS

52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY

PRICED LINE ITEM

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR

CONSTRUCTION

52.233-2 SERVICE OF PROTEST

52.236-27 SITE VISIT (CONSTRUCTION)

52.236-28 PREPARATION OF PROPOSALS – CONSTRUCTION

A. BASIS FOR AWARD

Award will be made to the responsible offeror whose proposal represents the best value to the Government as determined by the evaluations described in this section. The Government reserves the right to award a contract to other than the low price offeror or offeror with the highest technical rating after consideration of all factors as described in FAR Subpart 15.101-1. Selection of the successful offeror will be made based on the evaluation criteria stated below. However, any proposal that is unrealistic, in terms of technical approach, schedule commitments, and or costs (high or low) will be deemed to have an inherent lack of technical competence or to have failed to comprehend the complexity and risk of the Government’s requirement stated in the solicitation.

Evaluation Factors. There will be four factors used for contractor selection. Factor 1, Technical Approach, Factor 2, Experience, Factor 3, Past Performance, and Factor 4, Price.

The Technical Approach and Experience factors shall be evaluated using reasoned judgment that results in the assignment of a combined technical/risk rating as follows: Outstanding with Very Low risk, Good with Low risk, Acceptable with Moderate risk, Marginal with High risk, or Unacceptable encompassing a proposal that is unawardable.

For Factor 3, Past Performance, there are two aspects to the evaluation. The first is to evaluate the offeror’s past performance to determine how relevant a recent effort accomplished by the offeror is in relation to the effort for this acquisition. The evaluation will result in the assignment of a Past Performance Relevancy Rating as follows: Very Relevant; Relevant; Somewhat Relevant; Not Relevant, as the source selection requires a greater level of relevance discrimination. The second aspect of the past performance evaluation is to determine how well the offeror performed on the contracts. Past performance information will be evaluated to determine the quality and usefulness as it applies to a performance confidence assessment. The evaluation will result in the assignment of a Performance Confidence Assessment as follows: Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence, and Unknown Confidence (Neutral). In those circumstances where an offeror does not have a relevant record of past performance or for whom past performance information is not available, that offeror may not be evaluated favorably or unfavorably on its past performance. In situations of this kind, the adjective rating of Unknown Confidence (Neutral) will be assigned to the evaluation factor of Past Performance. The Government may seek and obtain past performance information pertaining to an offeror from governmental and non-government sources and databases.

Price proposals will be evaluated for completeness, balance, and reasonableness. The determination of completeness involves review of the Proposal Schedule and the degree to which an Offeror has priced all aspects of the work to be performed. Balance evaluations include, but are not be limited to, a review of offerors’ price proposals for comparison with the Independent Government Estimate (IGE) and the proposed prices submitted by the other offerors. Unbalanced prices may increase performance risk and could result in payment of unreasonably high prices.

Unbalanced pricing exists, when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by application of price or price analysis techniques. The determination of price reasonableness will be performed using various price analysis techniques such as comparison of proposed prices received in response to the solicitation, and comparison of proposed prices with the IGE. The successful offeror’s price proposal must be determined to be complete, balanced, and reasonable by the PET and that determination sustained by the SSA in making a price reasonableness determination.

There may be contained within the evaluation factors certain mandatory or minimum requirements to be met for evaluation. There are also contained within the described factors certain documents for required submission. Failure to satisfy any mandatory or minimum requirement may result in a determination that an offer is unacceptable. (A final determination that an offer is unacceptable means that an award to the offeror involved cannot be made.) Use of the words “will,” “shall” or “must” indicates a mandatory requirement for which failure to comply, at the time and date for submission of proposals, shall result in the proposal being disqualified from consideration for award, unless the Government elects to initiate discussions with some or all of the offerors in accordance with appropriate provisions of the FAR thereby providing a means by which appropriate corrections by the offerors involved can be made. Failure to comply with non-pricing requirements that are annotated with the words such as “should” or “may” might result in a lowering of an offeror’s non-pricing ratings involved and may have significant effect upon an offeror being selected for the contract award.

In accordance with FAR Provision 52.215-1(f)(4), the Government intends to award a contract without discussions but reserves the right to hold discussions if determined by the Government to be in its best interest. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a technical standpoint.

The technical evaluation team shall identify significant strengths, strengths, significant weakness, weaknesses and deficiencies in each proposal and assign a rating of Outstanding/Very Low Risk, Good/Low Risk, Acceptable/No Worse than Moderate Risk, Marginal/High Risk, or Unacceptable in response to the “Technical Approach” and Experience factors. A Relevancy and Confidence Assessment rating will be assigned to the “Past Performance” factor. Evaluations under the Past Performance Factor will result in the assignment of a single Performance Confidence Rating for each offeror. A significant strength is an aspect of an offeror’s proposal that, when judged against the evaluation criteria, appreciably enhances the merit of that offeror’s proposal or appreciably increases the probability of successful contract performance by that offeror. A strength is an aspect of the offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. A significant weakness in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. A weakness is a flaw that increases the risk of unsuccessful performance. A deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. A risk as it pertains to source selection is the potential for unsuccessful contract performance.

Each proposal should be submitted in a format that is representative of the items to be evaluated in the order that they are described below.

Relative Importance: To determine the best value offeror, a source selection process will be used that involves evaluation of both non-price and price factors. Factor 1 (Technical Approach), Factor 2 (Experience), and Factor 3 (Past Performance) are approximately equal in weight. When Factor 1, Factor 2, and Factor 3 are combined, they are given significantly more weight than Factor 4 (Price) in the evaluation process for this acquisition.

B. FACTORS TO BE EVALUATED

EVALUATION PROCESS

EVALUATION OF FACTORS: In accordance with FAR 15.101-1, the following factors will be considered when evaluating the proposals:

Factor 1 - Technical Approach

Factor 2 - Experience

Factor 3 – Past Performance

Factor 4 – Price

FACTOR 1 – TECHNICAL APPROACH

Technical Approach: This factor will be evaluated based on the completeness and feasibility of the offeror’s approach, the offeror’s ability to demonstrate their understanding of the contractual requirements, the level of risk of their proposed approach, and how well the offeror addresses their licensing, and organization. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph D of this section.

During evaluations of each proposal, the Technical Evaluation Team (TET) will assign an adjectival rating and write a narrative evaluation reflecting the identified findings.

FACTOR 2 – EXPERIENCE

Experience: This factor will be evaluated based upon the geographic location, cost magnitude, and relevancy of demonstrated experience in managing and executing projects that are of a similar complexity and scope of work as described for this solicitation. During evaluation of each proposal, the TET will assign an adjectival rating for this factor, supported by a comprehensive narrative.

FACTOR 3 – PAST PERFORMANCE

Past Performance: This factor will be evaluated on the quality of product and service, cost management, schedule management, safety and customer satisfaction. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph D of this section. During evaluation of each proposal, the TET will assign an adjectival rating for this factor, supported by a comprehensive narrative.

FACTOR 4 – PRICE

Price: The resultant award will be a firm fixed price contract and will be evaluated for balanced pricing, completeness and reasonableness. A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph D of this section.

C. EVALUATION APPROACH. All proposals shall be submitted in accordance with the proposal instructions provided in the solicitation and shall be subject to evaluation by a team of Government personnel.

PROPOSAL EVALUATION

The TET will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the offerors’ initial proposals, clarifications, or revised proposals if discussions are conducted. For the past performance factor, the TET may consider information obtained from other sources as provided in the Past Performance Information Retrieval System (PPIRS), the Federal Awardee Performance and the Integrity Information System (FAPIIS), the Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. The Source Selection Evaluation Board (SSEB) will not consider any documents Incorporated by reference, except as expressly allowed by this solicitation.

Each member of the TET will independently evaluate and rate all proposals against the evaluation factors. Upon completion of the independent evaluation, the TET will meet as a team to discuss the individual ratings and arrive at a consensus rating for each evaluation factor. It is the responsibility of each member of the TET to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor.

Comments are required for all ratings.

The SSEB will prepare and submit comprehensive evaluation reports to the Source Selection Evaluation Authority (SSA). The TET report shall contain a summary of each offeror’s proposal, the rating for each evaluation factor, and a comprehensive narrative in support of each rating, to include a discussion of the associated strengths, weaknesses, deficiencies, risks and uncertainties. The Price Evaluation Team (PET) report shall include a detailed price analysis that examine not only the total price, including any options, but also the prices for the individual CLINS to ensure they are not unbalanced.

Instructions to Prospective Offerors:

General. Electronic or faxed proposal submissions will not be considered. Proposals shall be clearly marked on the outside of the package with the solicitation number. The closing date annotated on the pre-solicitation notice via FedBizOpps is for FedBizOpps archiving purpose only. The following FAR are applicable to this acquisition and may be viewed at: http://farsite.hill.af.mil/vffara.htm.

FAR Clause 52.215-1, Instructions to Offerors-Competitive Acquisition

Summary of Submission Requirements

Volume I- Proposal Format: The proposal must be in the following order with tabs dividing each section.

Technical Proposal shall include: (do not include pricing information in Volume I)

TAB A - Cover Letter (see content instructions below)

TAB B - Factor 1: Technical Approach as described in Section D. PROPOSAL SUBMISSION

TAB C - Subcontractor/ Letters of Commitment (if applicable).

TAB D – Factor 2: Experience as described in Section D. PROPOSAL SUBMISSION, and Attachments (Attachment 1Experience Overview Sheet) (Attachment 2 Offeror’s Prime Construction Experience), and (Attachment 3 Relevancy Matrix)

TAB E - Factor 3: Past Performance as described in Section D. PROPOSAL SUBMISSION, and Appendix D (Past Performance Questionnaires, CPARS reports, etc.).

NOTE: It is the offeror’s responsibility to ensure that all past performance questionnaire surveys are completed on or before the closing date and time of the Request for Proposal.

Volume II-Proposal Format: The proposal must be in the following order with tabs dividing each section.

Price Proposal shall include: The proposal must be in the following order with tabs dividing each section:

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture.

TAB B – Proposal Pricing Schedule, Section 00 10 00

TAB C - Completed Representation and Certifications (Section 00 45 00). The offeror shall complete all items contained in the Representation and Certifications, Completed Corporate Certificate/Authority to Bind Partnership (Section 00 45 00):

- If the offeror is a corporation, completed Corporate Certificate, OR

- If the offeror is a partnership, completed Authority to Bind Partnership and provide a copy of the Partnership Agreement, OR

- If the offeror is a joint venture, completed Corporate Certificate for each member of the joint venture and provide a copy of the Joint Venture Agreement.

TAB D - Responsibility documentation. Please submit all of the following information with Volume II; Price Proposal: The name of your banking firm, telephone number and the name of the individual to contact (including email address) for a line-of-credit reference. Please ensure you authorize your banking firm to release general information regarding your accounts to USACE.

TAB E – In accordance with FAR Clause 52.228-1, Bid Guarantee, Offerors are required to submit an original bid bond in accordance with these instructions by the time and date established for the receipt of proposals. The Bid Guarantee shall be 20% of the proposal price or $3,000,000, whichever is less. Bid bonds must be submitted in original form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond shall be cause for rejection of an Offeror's proposal.

ELECTRONIC BID BOND SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE TRANSMISSIONS IS

NOT AUTHORIZED.

HANDCARRIED BID BOND SUBMISSIONS, except for delivery by Federal Express and United Parcel Service, IS NOT AUTHORIZED.

Bonds must be delivered by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel with the contractor's name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Request For Proposal Number: W912ER-16-R-0008 Due Date of Proposal: August 8, 2016 Time by which Proposals are due: 4:00 PM (Eastern Time) Title of Project: Kuwait Air Defense Improvements, Kuwait

Bid Bonds must be addressed:

U.S. Army Engineer District, Middle East District CETAM-CT-M: Marissa Louden (W912ER-16-R-0008) 201 Prince Frederick Drive Winchester, VA 22602

The date and time of delivery established by commercial carriers is not the official time of receipt by the Government. Security Guards posted at the entry for the building do not receive bid bonds and will contact Mailroom personnel. Once Mailroom personnel are available, the bid bonds will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid bonds. Completion of these actions will constitute delivery of the bid bonds by the date and time designated for receipt of the bid bonds.

Offerors that use U.S. Mail or U.S. Express Mail must allow sufficient time for the bid bonds to be received by Mailroom personnel by the time specified. Offerors are responsible for allowing sufficient time for the bid bonds to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated. The Government will not be responsible for bid bonds delivered to any location or to anyone other than those designated. Offerors are responsible for ensuring that bid bonds are submitted so as to reach the office designated for receipt. Offerors are responsible for allowing sufficient time for the bid bonds to be physically received and processed by Mailroom personnel in accordance with the information provided.

Proposal Preparation.

Cover Letter of the proposal should include:

a. Solicitation number

b. The name, addresses, telephone number, and email address of the prospective Offeror

c. The DUNS number, CAGE Code, and TIN of the prospective Offeror

1. All offerors are required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be determined non-responsive.

2. The request for proposal should contain a master "Table of Contents" for the total proposal. This master index should identify major areas by title, as well as page numbers and volume location. A copy of this master "Table of Contents” should be placed in front of each volume making up the total proposal.

3. The proposal should include an (1) original and two (2) copies of both proposal volumes along with one (1) CD which contains all files in an Adobe portable document format (pdf). The Original and Each Copy must be individually bound, typically in a standard three ring binder or similar book. Each section of the volume must be individually tabbed and labeled.

4. The proposal must be prepared on 8-1/2" x 11" paper (11”X17” for drawings), A-4, bond paper and include a Title Page and a Table of Contents unless otherwise stated under each Factor. Margins should be no smaller than a half inch (1/2”) and font face is Times New Roman and font size should be no smaller than 10 size. Page is defined as a single sheet of paper with text on both sides. The Government will not evaluate any material that exceeds the page limits specified herein. The proposal must be tabbed and bound or presented in a three-ring binder. Elaborately prepared proposals are not required.

5. The Offeror shall place the following notification on the bottom of each page of its proposal: “Source Selection Information – See FAR 2.101 and 3.104. Do not disclose any source selection information to any unauthorized person.”

6. Time periods, if stated as a number of days, are calendar days unless otherwise specified.

7. Lack of applicable Letter(s) of Commitment is considered a deficiency and submissions lacking the applicable Letter(s) of Commitment may not be considered.

Proposal Submission Requirements.

1. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The Government may reject incomplete proposals after initial evaluation without further consideration. Therefore, the proposal shall meet the following basic requirements:

a. The Proposal must be typed and submitted in English.

b. Proposal must be organized, concise, and submitted in the volumes and in the order indicated below paragraph “e”. Volumes must be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.

c. Proposals must be sent in two separate volumes. Each volume must be contained within a separate binder. Each volume must be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the binder cover. Each volume must contain a Table of Contents and include at the bottom left side of each page the volume and page number.

d. Offerors shall verify that the information for all forms submitted are current, correct and complete including names of the points of contact, email address, fax number, and telephone number.

e. Pricing Schedule(s), Volume II, shall be completed in full, including all option items.

f. Offerors shall submit a signed Standard Form 1442 in Volume II for this solicitation, including verification of all amendments received.

g. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc. are not necessary. Proposals must completely and adequately address the requirements of this solicitation.

h. If additional information is provided, it shall be in regard to the solicitation requirements, only.

i. Failure to submit, or to completely fill out attachments properly, may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and raise questions through the Bidder Inquiry System (See Section 00 21 00 of the solicitation), if instructions are not understood.

j. All questions and concerns shall be addressed to the Contracting Officer or his/her point of contact through the Bidder Inquiry System.

Responsibility documentation.

Please submit all of the following information with Volume II; Price Proposal:

1. The name of your banking firm, telephone number and the name of the individual to contact (including email address) for a line-of-credit reference. Please ensure you authorize your banking firm to release general information regarding your accounts to USACE.

All questions and concerns shall be addressed to the Contracting Officer or his/her point of contact through the Bidder Inquiry System.

Addressing/Proposal Submission.

Electronic proposals (facsimile, email, etc.) are not authorized. Proposals may be delivered via U.S. Mail, Commercial Carrier (FedEx, UPS, etc.) or delivered by hand to:

U.S. ARMY CORPS OF ENGINEERS

or

U.S. ARMY CORPS OF ENGINEERS

MIDDLE EAST DISTRICT CETAM-CT-M MIDDLE EAST DISTRICT CETAM-CT-M

ATTN: Marissa M. Louden

W912ER-16-R-0008

ATTN: Marissa M. Louden

W912ER-16-R-0008

201 PRINCE FREDERICK DRIVE P.O. BOX 2250

WINCHESTER, VA 22602 WINCHESTER, VA 22604

Your proposal is due no later than August 8, 2016, 4:00PM Eastern Standard Time (EST), Winchester, VA time to the above address. It is the Offeror’s responsibility to ensure that the proposal is received on or before the closing date and time of the RFP.

Bidder Inquiries in ProjNet. Inquiries regarding the Request for Proposal shall be submitted as follows:

Inquiries regarding this solicitation shall be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-based program that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at https://www.projnet.org/projnet/.

Offerors shall only submit one question per inquiry. All inquiries containing multiple questions will be rejected.

Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question(s) after it has been processed by our technical team. Offerors may view all bidder inquiries through ProjNet.

Inquiries must be submitted seven days prior to the proposal due date. Offerors will not be able to submit inquiries after this date as the ProjNet system shall be shut down.

To submit and review bid inquiries, prospective offerors will need to use the Bidder Inquiry Key for access:

- The Bidder Inquiry Key is: UYWP9N-CCU34F

Specific Instructions for ProjNet Bid Inquiry Access:

- From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

- Identify the Agency. This should be marked as USACE.

- Key. Enter the Bidder Inquiry Key listed above.

- Email. Enter the email address you would like to use for communication.

- Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

- Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

- Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Submit questions or review questions and answers. A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

For specific step-by-step for POSTING YOUR INQUIRIES, see the Reference link on the Contract Viewer.

For questions about the ProjNet-®, please contact the Call Center help desk toll free at 1- 800-428-HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-® questions can also be emailed to the helpdesk at staff@rcesupport.com.

Amendments to the RFP. Any and all amendments to the RFP will be issued electronically and be available via www.fbo.gov. It is the Offeror’s responsibility to continuously check for any amendments to this RFP and acknowledge any and all amendments in the text of the cover letter (amendment number and date acknowledged by Offeror) sent with their proposal package in response to this RFP.

Pre-proposal Conference/Site Visit. A pre-proposal conference and site visit will be conducted.

Joint Ventures (JV). A joint venture is defined as follows: a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance,” which are not recognized as bona fide joint ventures for the purposes of this solicitation. Offerors proposing as joint ventures shall provide evidence that the Joint Venture as a legal entity has been duly formed. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified.. If submitting a proposal as a joint venture, the experience, and past performance of any of the joint venture partners can be submitted for the joint venture entity. The experience for any joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole. Prospective Offerors that submit proposals may not change their firm (which includes changing subcontractors for which LOC’s were submitted, or any other proposed subcontractor) or their Joint Venture firms, if selected for award. If the offeror proposes to change subcontractors after award, they may not change subcontractors without the Contracting Officer’s approval. Approval will not be given unless the Contracting Officer considers the proposed substitute to be equal in all respects to the originally proposed subcontractor and that the substitution is in the best interests of the Government.

Subcontractors. The Government recognizes that completion of a project is often a team effort. Therefore, if an Offeror wishes to be credited with experience and past performance of a subcontractor (i.e., a firm that is not a member of the Joint Venture), then a firm, unequivocal letter of commitment signed by the firm must be submitted.

The letter of commitment must be submitted even if the firm is in some way related to a Joint Venture partner (for example, the subcontractor is a subsidiary of a Joint Venture partner, or a subsidiary of a firm to which a Joint Venture partner is also a subsidiary). If such a letter of commitment is not submitted, the experience and past performance of subcontractor firms may not be considered. If the Offeror’s proposal includes the use of subcontractors, the Offeror may not change subcontractors without the Contracting Officer’s approval. If the offeror proposes to change subcontractors or Letter of Commitment after award, the offeror may not change subcontractors or Letter of Commitment without the Contracting Officer’s approval. Approval will not be given unless the Contracting Officer considers the proposed substitute to be equal in all respects to the originally proposed subcontractor and that the substitution is in the best interests of the Government.

System for Award Management (SAM). Offerors (including Joint Venture entities) shall be registered in the System for Award Management (SAM) and determined to be responsible prior to Award. For more information, see the SAM website at https://www.sam.gov/portal/public/SAM/

- Please ensure that NAICS code 236220 (Commercial and Institutional Building Construction) is listed in your SAM registration.

Expenses Incurred. The Government will not reimburse any costs incurred or associated with preparation and submission of any response(s) to this solicitation.

Discussions. The Government intends to award without conducting discussions, however, the Government reserves the right to conduct discussions as determined necessary by the Procuring Contracting Officer.

Obtaining a D.U.N.S. Number. Data Universal Numbering System (D-U-N-S) Number. The Data Universal Numbering System (D-U-N-S) Number is a unique nine- character identification number provided by the commercial company Dun & Bradstreet (D&B). Call D&B at 1-866-705-5711 or access their website if you do not have a D-U-N-S number. The site addresses are http://fedgov.dnb.com/webform OR http://www.dnb.com/. The process to request a D-U-N-S number via phone takes about 10 minutes and is free of charge. Internet requests are fulfilled within 24 hours. You must have a different nine-digit D-U-N-S number for each physical location or different address for your company as well as for each legal division that may be co-located.

Late Proposals. Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be accepted unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and (1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 4:00 p.m. one working day prior to the date specified for receipt of proposals; or (2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or (3) It is the only proposal received. However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted. Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

Point of Contact (POC):

U.S. ARMY, CORPS OF ENGINEERS

MIDDLE EAST DISTRICT

Mr. Joe Libbey 201 Prince Frederick Drive Winchester, VA 22602

(540) 665-1532 joe.l.libbey@usace.army.mil

U.S. ARMY, CORPS OF ENGINEERS

MIDDLE EAST DISTRICT

Ms. Marissa Louden 201 Prince Frederick Drive Winchester, VA 22602

(540) 665-5324 marissa.m.louden@usace.army.mil

D. PROPOSAL SUBMISSION

VOLUME I - TECHNICAL REQUIREMENTS

Factor 1 - Technical Approach Factor 2 - Experience Factor 3 - Past Performance

FACTOR 1 – TECHNICAL APPROACH

The evaluation for the Factor 1 Technical Approach consist of two components: 1 - Management Approach, and 2 - Preliminary schedule. These are not sub-factors or elements. The two components are approximately equal in importance to each other and the entire Factor 1 will be evaluated in its entirety, resulting in an assignment of a single Technical Approach rating for each Offeror.

1 – Management Approach

Proposal Submission Requirements:

The offeror shall provide a detailed narrative that demonstrates the Offeror’s understanding of the overall scope of work for the project and describes the Offeror’s approach to completing the work. The Offeror’s narrative should identify all major scope components of the project, including the critical components of the project. Additionally, the Offeror’s narrative should include a discussion of a planned technical approach to the project that not only demonstrates an understanding of the phasing, local labor market, laws, base access, and other anticipated challenges, but that also provides benefit to the Government. The Offeror should demonstrate a clear understanding of shipping and logistics (air, land, and sea), local labor and subcontractor markets, and the unique requirements associated with this project such as constructing concrete structures that support vehicle loading, constructing masonry buildings, pre-engineering buildings, free standing commercial antenna supporting towers and elevated concrete slabs.

The narrative should specifically address the following:

a. Licensing: The Offeror should…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .