CLIN 0001: Site Topographical/Geotech Survey
AIR DEFENSE ICC FACILITIES #3 Performance Period:
Site Topographical/Geotech Survey for ALL THREE PROJECT Sites in accordance with the Contract Documents.
N/A
Chart #1: Air Defense Facilities #3
AIR DEFENSE ICC FACILITIES #3 Performance Period:
0002 Mobilization and Demobilization in Accordance with the Contract Documents 515
0003 Investigative Analysis/Reports in Accordance with the Contract Documents 515
0004 Construct a Screen Room Building in Accordance with the Contract Documents 515
0005 Renovate Air Operations Center Improvements in Accordance with the Contract Documents 515
0006 Construct Electrical Distribution System in Accordance with the Contract Documents 515
Construct Data and Telephone Communication Distribution System in Accordance with the Contract Documents
Chart #2: Air Defense Facilities #3 Optional Bid items
AIR DEFENSE ICC FACILITIES #3 Performance Period
OPTION 1: Replace Raised Access Flooring System in Accordance with the Contract Documents
0051 OPTION 2: Replace HVAC Units in Accordance with the Contract Documents 515
Chart #3: Air Defense Site #6
AIR DEFENSE SITE #6 Performance Period:
0008 Mobilization and Demobilization in Accordance with the Contract Documents 700
0011 Construct a Guard House Building in Accordance with the Contract Documents 515
Construct Engagement Control Station (ECS) with Concrete Ramps in Accordance with the Contract Documents
0013 Construct Guard Towers in Accordance with the Contract Documents 515
0014 Construct Frequency Converter Buildings in Accordance with the Contract Documents 515
0015 Construct Equipment Pads and Alaska Barriers in Accordance with the Contract Documents 515
Construct Fuel Truck Parking and Fuel Tank Storage with the Sunshades in Accordance with the Contract Documents
0020 Construct Telecommunication Tower in Accordance with the Contract Documents 515
Construct Power Plant Facility including but not limited to Generators, Transformers, Controls, Switchgears, etc.; in Accordance with the Contract Documents
Construct Security Fence, Entry Control Points and Force Protection Systems in Accordance with the Contract Documents
Construct Sewer Collection and Distribution System including Leach Field in Accordance with the Contract Documents
Construct Power and Lighting Distribution System including out site pole lighting in Accordance with the Contract Documents
Construct Data and Telephone Communication Distribution System in Accordance with the
Chart #4: Air Defense Site #6
0009 Construct a Headquarters Building in Accordance with the Contract Documents 700
0010 Construct a Toilet Building in Accordance with the Contract Documents 700
0016 Construct Storage Facility and Storage Pad in Accordance with the Contract Documents 700
0017 Construct Car Parking with Sunshade in Accordance with the Contract Documents 700
0018 Construct Truck Parking with Sunshade in Accordance with the Contract Documents 700
0022 Construct Roads and Sidewalks in Accordance with the Contract Documents 700
Perform Demolition, Site Work, Site Development, Strom Drainage in Accordance with the Contract Documents
0027 Construct CCTV Security System in Accordance
Chart #5: Air Defense Site #6 Optional Bid Items
0052 OPTION 3: Construct Prayer Gathering Building in Accordance with the Contract Documents 700
0053 OPTION 4: Construct Car Parking and Shelter in Accordance with the Contract Documents 700
OPTION 5: Construct Maintenance High-bay Facility in Accordance with the Contract Documents
OPTION 6: Additional Construct Cost to Paved Gravel Perimeter Patrol Road and Service Drive in Accordance with the Contract Documents
Chart #6: Air Defense Site #7
AIR DEFENSE SITE #7 Performance Period:
0029 Mobilization and Demobilization in Accordance with the Contract Documents 700
0032 Construct a Guard House Building in Accordance with the Contract Documents 515
Construct Engagement Control Station (ECS) with Concrete Ramps in Accordance with the Contract Documents
0034 Construct Guard Towers in Accordance with the Contract Documents 515
0035 Construct Frequency Converter Buildings in Accordance with the Contract Documents 515
0036 Construct Equipment Pads and Alaska Barriers in Accordance with the Contract Documents 515
Construct Fuel Truck Parking and Fuel Tank Storage with the Sunshades in Accordance with the Contract Documents
0041 Construct Telecommunication Tower in Accordance with the Contract Documents 515
Construct Power Plant Facility including but not limited to Generators, Transformers, Controls, Switchgears, etc.; in Accordance with the Contract Documents
Construct Security Fence, Entry Control Points and Force Protection Systems in Accordance with the Contract Documents
Construct Sewer Collection and Distribution System including Leach Field in Accordance with the Contract Documents
Construct Power and Lighting Distribution System including out site pole lighting in Accordance with the Contract Documents
Construct Data and Telephone Communication Distribution System in Accordance with the
Chart #7: Air Defense Site #7
0030 Construct a Headquarters Building in Accordance with the Contract Documents 700
0031 Construct a Toilet Building in Accordance with the Contract Documents 700
0037 Construct Storage Facility and Storage Pad in Accordance with the Contract Documents 700
0038 Construct Car Parking with Sunshade in Accordance with the Contract Documents 700
0039 Construct Truck Parking with Sunshade in Accordance with the Contract Documents 700
0043 Construct Roads and Sidewalks in Accordance with the Contract Documents 700
Perform Demolition, Site Work, Site Development, Strom Drainage in Accordance with the Contract Documents
0048 Construct CCTV Security System in Accordance
Chart #8: Air Defense Site#7
OPTION 7: Construct Headquarters Building Additional Wing in Accordance with the Contract Documents
0057 OPTION 8: Construct Prayer Gathering Building in Accordance with the Contract Documents 700
0058 OPTION 9: Construct Car Parking and Shelter in Accordance with the Contract Documents 700
OPTION 10: Construct Maintenance High-bay Facility in Accordance with the Contract Documents
OPTION 11: Construct Anti-Vehicle Ditch and Berm around exterior Fence in Accordance with the Contract Documents