A22 - Attachment J-9 - Statement of Work Appendix 4 - Existing Condition Photographs - 25 Oct. 2023.pdf

PDF 2 MB Posted

Attached to
Coralville Lake Ranger Building and Admin Repairs
Solicitation number
W912EK24R0002
Issued by

About this file

This document is an appendix containing existing condition photographs for the Coralville Lake Ranger Building and Admin Repairs federal contract opportunity. The photographs depict current conditions of various areas within the Visitor Center and Administration Building that are in need of repair, including ADA restrooms, basement storage and utility rooms, offices, hallways, electrical and mechanical rooms. The opportunity is a solicitation issued by the Department of the Army Corps of Engineers Engineering District Rock Island seeking repairs and renovations to address the issues shown in the photographs in order to upgrade and modernize the facilities. The solicitation number is W912EK24R0002 and services are to be provided at the Coralville Lake Ranger Building located in Iowa.

View the file

Other files

File Type Posted
A22 - W912EK24R0002 AMND 0005.pdf PDF
A22 - W912EK24R0002 Conformed Copy through AMND 0005.pdf PDF
A22 - Attachment J-22 - Spec Section 01 57 19 - Temporary Environmental Controls - 07 Sept. 2023.pdf PDF
A22 - Attachment J-12 - Statement of Work Appendix 7 - Visitor Center Requirements - 25 Oct. 2023.pdf PDF
A22 - Attachment J-24 - Spec Section 01 78 00 - Closeout Submittals - 07 Sept. 2023.pdf PDF
A22 - Attachment J-16 - Spec Section 01 32 01.00 10 - Project Schedule - 07 Sept. 2023.pdf PDF
A22 - Attachment J-5 - Section 01 10 00.00 20 - Statement of Work - Project Specific Requirements - 25 Oct. 2023.pdf PDF
A22 - Attachment J-19 - Spec Section 01 45 00.00 10 - Quality Control - 07 Sept. 2023.pdf PDF
A22 - Attachment J-23 - Spec Section 01 62 35 - Recycled Recovered Material - 07 Sept. 2023.pdf PDF
A22 - Attachment J-7 - Statement of Work Appendix 2 - ESA Abatement Documents - 25 Oct. 2023.pdf PDF
A22 - Attachment J-15 - Spec Section 00 73 05 - Special Contract Requirements - 07 Sept. 2023.pdf PDF
W912EK24R0002 - Question and Answer - 25 Oct. 2023.pdf PDF
A22 - Attachment J-10 - Statement of Work Appendix 5 - Visitor Center Displays - 25 Oct. 2023.pdf PDF
A22 - Attachment J-21 - Spec Section 01 50 02 - Temporary Construction Facilities - 07 Sept. 2023.pdf PDF
A22 - Attachment J-11 - Statement of Work Appendix 6 - Room Data Sheets - 25 Oct. 2023.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 25 Oct. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 25 Oct. 2023.pdf PDF
A22 - Attachment J-6 - Statement of Work Appendix 1 - Applicable Criteria - 25 Oct. 2023.pdf PDF
A22 - Attachment J-14 - Statement of Work Appendix 9 - Adjacency Matrices - 25 Oct. 2023.pdf PDF
A22 - Attachment J-17 - Spec Section 01 33 00 - Submittal Procedures - 07 Sept. 2023.pdf PDF
A22 - Attachment J-8 - Statement of Work Appendix 3 - Reference Documents - As-Builts - 25 Oct. 2023.pdf PDF
A22 - Attachment J-20 - Spec Section 01 45 00.15 10 - Resident Management System Contractor Mode - 07 Sept. 2023.pdf PDF
A22 - W912EK24R0002 AMND 0004.pdf PDF
A22 - Attachment J-18 - Spec Section 01 33 16.00 10 - Design Data-Design After Award - 07 Sept. 2023.pdf PDF
A22 - Attachment J-13 - Statement of Work Appendix 8 - Administration Building Septic Field - 25 Oct. 2023.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 13 Oct. 2023.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0003.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 01 Sept. 2023.pdf PDF
A22 - W912EK24R0002 AMND 0003.pdf PDF
A22 - W912EK24R0002 AMND 0001.pdf PDF
A22 - Attachment J-2 - Section 01 10 00.00 10 - Statement of Work - General Project Requirements - 10 Oct. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 10 Oct. 2023.pdf PDF
A22 - W912EK24R0002.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 10 Oct. 2023.pdf PDF
W912EK24R0002 - Question and Answer - 12 Oct. 2023.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0003.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0002.pdf PDF
A22 - W912EK24R0002 AMND 0002.pdf PDF
W912EK24R0002 Question and Answer - 26 Sept. 2023.pdf PDF
A22 - Attachment J-2 - Section 01 10 00.00 10 - Statement of Work - General Project Requirements - 01 Sept. 2023.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 18 Aug. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 01 Sept. 2023.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 01 Sept. 2023.pdf PDF
A22 - W912EK24R0002.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 10 00.00 20

STATEMENT OF WORK – PROJECT SPECIFIC REQUIREMENTS

APPENDIX 4 – EXISTING CONDITION PHOTOGRAPHS

25 October 2023

I

I

I I .

I

I i

I

Current ADA Restroom and Janitor Area in Visitor Center

Basement Conference Room and Hallway

Basement Furnace and Server Room

Basement Hallway

Basement Kitchen / Appliances

Current Basement Storage Area.

• I

I

East End of Southern Offices and Restrooms on Main Floor of Admin Bldg

East wing Hallway

EAST Wing North Side Offices

I

Electrical Box in hallway by Theater Room r p11- .. •

Visitor Center Lab Room

Main Floor Electrical Room

Main Floor Furnace Room t

Visitor Center Mens Restroom t

Mens Room in Admin Offfice

Pipe Chase In Visitor Center between Mens and Womens Restroom

Visitor Center Main Area

Pressure Tanks on Main Floor Near Theater Room

Stairwell Going Downstairs in Admin Offices

Theater/Storage/Main Entrance of Visitor Center

Close Up Picture of Water Pressure Tanks in Visitor Center

Womens Bathroom in Visitor Center

Appendix 4 - Existing Condition Photographs Cover Page - 25 Oct. 2023
Appendix 4 - Pt. 1
ADA Restroom and Janitor area
Basement Conference Room and Hallway
Basement Funace Server Room
Basement hallway
Basement kitchen area and appliances
Basement Storage Cabinet adn microwave
East end sourthern offices and restrooms
East wing hallway
East wing north side offices
Electrical box
Lab Room
Main floor Electrical Room
Main floor Furnace Room
Mens Restroom in VC area
Mens Restroom Office Area
Narrow Pipe Chase
Old Visitor Center area
Pressure tanks-Elecrical-Furnace Room
Stairwell
Theater-Storage-Main Entrance area
Water pressure tanks
Womens Restroom in VC area

File details come from the government source that posted it. Updated .