This statement of work outlines requirements for the design and construction of renovations and additions to the Coralville Lake Administrative Office and Visitor Center in Iowa City, Iowa. The project includes interior renovations to the existing 5,000 square foot administration building and visitor center, as well as the design and construction of a new 6,000 square foot ranger garage and storage building addition. The statement of work specifies requirements for demolition, environmental compliance, cultural and hazardous materials handling, geotechnical work, site and civil design, architectural, structural, mechanical, electrical and energy systems. It also addresses quality standards, sustainability requirements, and responsibility for permits, utilities and regulatory compliance. The solicitation is being conducted by the U.S. Army Corps of Engineers Rock Island District for a design-build contract to complete the work.

View the file

Other files

File Type Posted
A22 - W912EK24R0002 AMND 0005.pdf PDF
A22 - W912EK24R0002 Conformed Copy through AMND 0005.pdf PDF
A22 - Attachment J-22 - Spec Section 01 57 19 - Temporary Environmental Controls - 07 Sept. 2023.pdf PDF
A22 - Attachment J-12 - Statement of Work Appendix 7 - Visitor Center Requirements - 25 Oct. 2023.pdf PDF
A22 - Attachment J-24 - Spec Section 01 78 00 - Closeout Submittals - 07 Sept. 2023.pdf PDF
A22 - Attachment J-16 - Spec Section 01 32 01.00 10 - Project Schedule - 07 Sept. 2023.pdf PDF
A22 - Attachment J-5 - Section 01 10 00.00 20 - Statement of Work - Project Specific Requirements - 25 Oct. 2023.pdf PDF
A22 - Attachment J-19 - Spec Section 01 45 00.00 10 - Quality Control - 07 Sept. 2023.pdf PDF
A22 - Attachment J-23 - Spec Section 01 62 35 - Recycled Recovered Material - 07 Sept. 2023.pdf PDF
A22 - Attachment J-7 - Statement of Work Appendix 2 - ESA Abatement Documents - 25 Oct. 2023.pdf PDF
A22 - Attachment J-15 - Spec Section 00 73 05 - Special Contract Requirements - 07 Sept. 2023.pdf PDF
W912EK24R0002 - Question and Answer - 25 Oct. 2023.pdf PDF
A22 - Attachment J-10 - Statement of Work Appendix 5 - Visitor Center Displays - 25 Oct. 2023.pdf PDF
A22 - Attachment J-21 - Spec Section 01 50 02 - Temporary Construction Facilities - 07 Sept. 2023.pdf PDF
A22 - Attachment J-11 - Statement of Work Appendix 6 - Room Data Sheets - 25 Oct. 2023.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 25 Oct. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 25 Oct. 2023.pdf PDF
A22 - Attachment J-6 - Statement of Work Appendix 1 - Applicable Criteria - 25 Oct. 2023.pdf PDF
A22 - Attachment J-9 - Statement of Work Appendix 4 - Existing Condition Photographs - 25 Oct. 2023.pdf PDF
A22 - Attachment J-14 - Statement of Work Appendix 9 - Adjacency Matrices - 25 Oct. 2023.pdf PDF
A22 - Attachment J-17 - Spec Section 01 33 00 - Submittal Procedures - 07 Sept. 2023.pdf PDF
A22 - Attachment J-8 - Statement of Work Appendix 3 - Reference Documents - As-Builts - 25 Oct. 2023.pdf PDF
A22 - Attachment J-20 - Spec Section 01 45 00.15 10 - Resident Management System Contractor Mode - 07 Sept. 2023.pdf PDF
A22 - W912EK24R0002 AMND 0004.pdf PDF
A22 - Attachment J-18 - Spec Section 01 33 16.00 10 - Design Data-Design After Award - 07 Sept. 2023.pdf PDF
A22 - Attachment J-13 - Statement of Work Appendix 8 - Administration Building Septic Field - 25 Oct. 2023.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 13 Oct. 2023.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0003.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 01 Sept. 2023.pdf PDF
A22 - W912EK24R0002 AMND 0003.pdf PDF
A22 - W912EK24R0002 AMND 0001.pdf PDF
A22 - Attachment J-2 - Section 01 10 00.00 10 - Statement of Work - General Project Requirements - 10 Oct. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 10 Oct. 2023.pdf PDF
A22 - W912EK24R0002.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 10 Oct. 2023.pdf PDF
W912EK24R0002 - Question and Answer - 12 Oct. 2023.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0003.pdf PDF
A22 - W912EK24R0002 Conformed Copy Through AMND 0002.pdf PDF
A22 - W912EK24R0002 AMND 0002.pdf PDF
W912EK24R0002 Question and Answer - 26 Sept. 2023.pdf PDF
A22 - Attachment J-1 - Wage Rates - Johnson County - 18 Aug. 2023.pdf PDF
A22 - Attachment J-3 - Section L - Instructions Conditions and Notices to Bidders - 01 Sept. 2023.pdf PDF
A22 - Attachment J-4 - Section M - Evaluation Factors for Award - 01 Sept. 2023.pdf PDF
A22 - W912EK24R0002.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 10 00.00 10 - Page 1 of 8

SECTION 01 10 00.00 10

STATEMENT OF WORK – GENERAL PROJECT REQUIREMENTS

01 September 2023

Table of Contents

1. PROJECT OBJECTIVES

2. GENERAL SCOPE

2.1. PROJECT LOCATIONS

2.2. DEMOLITION

2.3. ENVIRONMENTAL

2.4. CULTURAL

2.5. HAZARDOUS MATERIALS

2.6. GEOTECHNICAL

2.7. SITE/CIVIL

2.8. ARCHITECTURAL

2.9. STRUCTURAL

2.10. MECHANICAL / PLUMBING

2.11. ELECTRICAL

2.12. ENERGY CONSERVATION

2.13. ANTI-TERRORISM / FORCE PROTECTION

2.14. DESIGN QUALITY

2.15. DESIGN FREEDOM

2.16. CONTRACTOR RESPONSIBILITY

2.17. CONTRACTOR’S USE OF THE SITES

01 10 00.00 10 - Page 2 of 8

1. PROJECT OBJECTIVES

1.0.1 The objective of this solicitation is to provide designs and construction for a multi-faceted project. All aspects should be designed collectively to ensure the best final product. This includes the design and remodel to the interior of the existing administrative building and visitor center building, and the design and construction of a new garage/additional space facility, to replace an existing facility that shall be demolished/removed for the U.S. Army Corps of

Engineers (USACE) at Coralville Lake near Iowa City, Iowa. The remodel of existing

Administrative Office space should be a priority to get project personnel back into permanent office spaces as quickly as possible. Then the remodel of visitor’s area of the building. There is an existing 3,700 SF garage/storage building is to be demolished/removed down to the concrete foundation. This structure shall be replaced by a building to be designed and constructed in a location designated behind and attached to the existing Administration Building. The desire is to provide “State-of-the-Art” facilities that rival similar use facilities in the private sector, using energy efficient and sustainable design. The overall goal is to provide functional, secure, visually appealing facilities that are a source of pride for USACE and the Coralville Lake.

1.0.2 It is USACE’s objective that these facilities will have a 50-year useful life. The design and construction should provide an appropriate level of quality to ensure the continued use of the facilities of that time with the application of reasonable preventive maintenance and repairs.

The facility designs should consider that USACE may repurpose the use of the facilities over the

50-year life. USACE’s intent is to install products and materials of good quality that meet industry standard average life that corresponds with the period of performance expected before a major renovation or repurpose. The design should be flexible and adaptable to possible future uses different than the current to the extent practical while still meeting the operational and functional requirements defined within. Flexibility is achieved through design of more flexible structural load-bearing wall and column system arrangements. The site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles.

Develop the project sites for efficiency and to convey a sense of unity or connectivity with the adjacent buildings and with the Installation as a whole.

1.0.3 Requirements stated in the RFP are minimums; design and construction must meet or exceed the requirements. The design and technical criteria contained and cited in the RFP establish minimum standards for design and construction quality. Further, the OFFEROR is encouraged to seek solutions that will expedite construction and shorten the schedule.

2. GENERAL SCOPE

Design and construct an interior renovation of the existing Administration Building/Visitor Center in conjunction with a Ranger Garage/Storage Building Addition to the existing facility in accordance with UFC 1-200-2 High Performance and Sustainable Building Requirements and applicable Federal, State, and local requirements:

01 10 00.00 10 - Page 3 of 8

2.1. PROJECT LOCATION

2.1.1. CORALVILLE LAKE, IOWA CITY, IOWA

Coralville Lake Project Office

2850 Prairie Du Chien Rd, NE

Iowa City, IA 52240

41°43’30.59” N, 91°31’32.67” W

Click to access location in Google Maps

The site can be accessed from Interstate I-80 via exit 244. Turn right to north Dubuque Street, go approximately 4 miles to West Overlook Road. Turn east on West Overlook Road and once to go over the dam the Coralville Lake Project Office will be on the left. The property is owned by USACE.

2.2. DEMOLITION

2.2.1. Administrative Office/Visitor Center Coralville Lake

The existing interior of the facility will be demolished by others down to the exposed interior structure (studs and joists). Determine additional interior demolition needs to the existing approximately 5,000 sq. ft. Administration Building/Visitor Center with a partial basement and any demolition needs as required for the Ranger Garage/Storage Building Addition. Perform site restoration as required for all disturbed areas. Demolition of existing utility, pavement, septic fields, and site features likely will not be required.

https://goo.gl/maps/nb3qUrYgX3zaybZr6

01 10 00.00 10 - Page 4 of 8

2.2.2. Ranger Garage/Storage Building

Demolish the existing pre-engineered metal building one-story Garage/Storage Building of approximately 3,700 square feet down to concrete pad foundation. Concrete shall remail in place.

2.3. ENVIRONMENTAL

Minimize interference with disturbance to avoid spillage, and damage to fish, wildlife, and plants, including all of aspects of their habitats. The protection of rare, threatened, and endangered animal and plant species identified, including their habitats, is the Contractor’s responsibility.

The contractor must comply with Federal, State, and local laws and regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, and oily substances.

2.4. CULTURAL

If, during construction activities, any previously unidentified or unanticipated historical, archeological, and cultural resources are discovered or found, activities that may damage or alter such resources will be suspended. Resources covered include, but not limited to, any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits;

rock or coral alignments, paving, wall, or other constructed features; and any indication of agricultural or other human activities.

2.5. HAZARDOUS MATERIALS

Inspect the facilities to be demolished for asbestos containing material (ACM), lead based paint

(LBP), and Polychlorinated Biphenyls (PCBs) prior to the facilities being demolished. Abate and dispose of any hazardous materials encountered in accordance with applicable regulations.

2.6. GEOTECHNICAL

Geotechnical work includes but is not limited to: Perform subsurface exploration and testing, provide geotechnical design reports, and all geotechnical analyses necessary to design the project features in accordance with applicable USACE and other industry approved criteria.

Base all designs on established engineering practices.

2.7. SITE/CIVIL

Exterior civil work includes, but is not limited to: storm water erosion control; minor clearing and grubbing; excavation, placement of fill, compaction, and grading; placement of pavement for access roads, drives, and parking lots; placement of concrete sidewalks and slabs; chain-link fencing and gates; utility work to include water, propane gas, electric, communications, exterior lighting, storm and sanitary sewer, and septic fields; site features work; signage; landscaping;

site restoration; and seeding. The Contractor will be responsible for all repairs to existing sidewalks, pavements, curb and gutter, utilities and/or landscaping damaged because of construction activities.

2.8. ARCHITECTURAL

Architectural work includes, but is not limited to:

01 10 00.00 10 - Page 5 of 8

2.8.1. Administration Building/Visitor Center Renovation

Design and construct an interior renovation for the existing two-story Administration Building with accompanying Visitor Center of approximately 5,000 square feet. The facility will include but may not be limited to: an Entrance Lobby, Administrative Offices, Main Conference

Room/Theater, Small Conference, Visitor Center Exhibit Area, Kitchen/Break Room, Health/Fitness Room, Copy/Mail Room, Employee Restrooms/Showers, Public Restrooms, Mother’s Room, Mechanical, Electrical, and Janitorial Rooms as required.

Provide code compliant means of egress and accessible paths of travel throughout the facility’s multiple floor levels; this may be achieved by the addition of an elevator and/or a platform lift.

Work areas for USACE personnel must be secured from public access by means of approved access control devices.

Provide the design and installation of the Exhibits within the Visitor Center. Provide the design and installation of furniture systems for all Administrative Spaces.

2.8.2. Ranger Garage/Storage Building Addition

Design and construct a Ranger Garage/Storage Building Addition with a footprint of approximately 6,000 square feet, including an elevated storage space (mezzanine) within. The facility will be of a similar aesthetic quality as the existing Administration Building/Visitor Center.

2.9. STRUCTURAL

Structural work includes, but is not limited to: the investigation/evaluation of existing site conditions; the structural whole-building design including, inter alia, the substructure design (i.e.

foundation/footing), the superstructure design (i.e. interior/exterior structural components, floor/roof framing and diaphragms), miscellaneous structures (i.e. electrical/mechanical equipment foundations/supports, and retaining walls), and structural load calculations (i.e.

foundation, gravity, and lateral analyses), ensuring that all of these items meet/exceed applicable standards and codes.

2.10. FIRE PROTECTION

Fire sprinkler work includes but is not limited to: code analysis to determine the requirements for sprinkler systems for the project and the design of the sprinkler systems for the building(s) requiring sprinkler systems based on the code analysis The facility is served by a well and does not have a city water supply. If fire sprinklers are required, the design must address the water supply required.

2.11. MECHANICAL / PLUMBING

Mechanical and Plumbing currently exists in the facilities but should be considered in overall design especially for the development of restrooms, breakrooms or kitchenette areas, and mother’s rooms sized for the appropriate number of occupancy; the installation of HVAC systems that are adequate size and type for each building to incorporate building automation systems utilizing native BACnet direct digital controls; the installation plumbing distribution and sewer systems that are adequate size and type for each building.

2.12. ELECTRICAL

01 10 00.00 10 - Page 6 of 8

Electrical Service: It is desired to relocate the existing utility (MidAmerican Energy Company) service transformer and the 208/120 VAC service entrance exterior electrical equipment line-up and support structure from the current location on the South side, top elevation adjacent to the front entrance of the Administration Building to the North side (rear side) of the Administration

Building at a lower elevation along the maintenance building’s access service road. Coordinate with the local electric utility company, design, and construct the route of new utility service medium voltage cables to supply the new service transformer location perhaps along the maintenance building’s access service road tapped and routed from the East driveway from the highway. The new utility service entrance transformer and equipment must supply the

Administration Building and the new Garage Building. Consider existing utility service routed to the existing Maintenance Building.

Premises Electrical Systems: Design and construction of complete facility electrical systems for the Administration Building and the new Garage Building including telecommunications system, power system, interior, exterior, and life safety lighting systems, new standby generator power system with automatic transfer switching, fire alarm/mass notification, lightning protection, public address system, audiovisual systems, and safety & security system to include access control, intrusion protection, duress, and CCTV.

Future Solar Panels: Coordinate, design and construct electrical power equipment or design provisions for physical space to accommodate installation of future equipment and future connection, just the future connection to the premises power equipment (not the solar panel system), of locally installed, premises-type, solar photovoltaic power panels which do not exist now, but for which may be separately installed in the future to supplement the facility’s utility power usage.

2.13. ENERGY CONSERVATION

Design and construct the buildings, including the building envelope, HVAC systems, service water heating, power, and lighting systems to achieve high-performance buildings which meet or exceed applicable USACE and other industry approved criteria. The Administrative Building including the building envelopes, HVAC systems, service water heating, power, and lighting systems shall meet the Mandatory Provisions and the Performance Rating Method (PRM) requirements of ASHRAE Standard 90.1 – 2019, 10 CFR Part 433 Energy Efficiency Standards

For The Design And Construction Of New Federal Commercial And Multi-Family High-Rise

Residential Buildings, Energy Policy Act of 2005 (Public Law 109-58), Energy Independence

Security Act of 2007, and Executive Order (EO) 14057. CFR Title 10 Part 433 requires a 30% improvement over the ASHRAE 90.1 Baseline if it is life cycle cost effective (LCCE). If a 30% reduction is not LCCE, the design is to be modified to achieve the highest level of energy efficiency that is LCCE.

2.14. ANTI-TERRORISM / FORCE PROTECTION

Antiterrorism/Force Protection measures must be included in the facility design in accordance with applicable criteria. The minimum protective measures as specified by the current

Department of Defense Minimum Antiterrorism Standards for Buildings, UFC 4-010-01, are required for this project.

01 10 00.00 10 - Page 7 of 8

2.15. DESIGN QUALITY

Design quality is achieved through the optimization of interior planning, integration of the buildings with the sites, sustainability, selection of building materials and systems for low-cost maintenance and operation, and an overall balance of aesthetics and functionality. USACE encourages a project design of award-winning caliber.

2.16. DESIGN FREEDOM

The Contractor will accommodate minor site and building plan changes by the Government in the early stages of the design process, as a normal part of the design development process.

The Contractor may adjust spaces, within the overall and specific functional area guidelines, as required to accommodate the structural layout, and as necessary to provide adequate space for mechanical, electrical, and telecommunication spaces. The mechanical and electrical spaces must provide adequate space to accommodate equipment operation and maintenance safely and efficiently. The spatial relationships and adjacencies in the RFP drawings, however, must be maintained, unless the Contractor recommends changes to the Government, and the

Government accepts such changes.

2.17. CONTRACTOR RESPONSIBILITY

2.17.1. The Contractor will provide all labor, materials, equipment, supplies, permits, fees, and consultant services to design and construct these complexes. The complexes must be complete and usable facilities, meeting the requirements of the RFP. The Contractor will develop complete site, building, and interior design packages.

2.17.2. GOVERNMENT FURNISHED / GOVERNMENT INSTALLED ITEMS:

If not identified as Government-Furnished in the RFP, all work required by the RFP will be the responsibility of the Contractor. The Contractor will provide design coordination for items to be purchased and installed by the Government (GFGI).

2.17.3. VERIFICATION OF CONDITIONS

The Contractor must field verify existing conditions prior to beginning work. The Contractor and

Designers of Record will be responsible for investigating all differing site conditions, discrepancies, and field related issues that are encountered during the design and construction process. The Designers of Record will be responsible for providing guidance to the Contractor for the resolution of all such issues. The Contractor must provide notice to the Government of any such issues prior to proceeding and with sufficient time to avoid cost or schedule impacts.

2.17.4. VERIFICATION OF UTILITIES

The Government will provide available as-built and location documentation for site utilities, but this information is to be considered approximate. The Contractor and the Designers of Record will be responsible for verifying the condition, location, and capacity for all utilities necessary for the project. The Contractor and Designers of Record will further verify that all utilities will meet the requirements of this project.

01 10 00.00 10 - Page 8 of 8

2.17.5. REGULATORY COMPLIANCE

The Contractor will assure that the facilities and site developments comply with all applicable local, State and Federal Regulations. Timely acquisition of the necessary design and construction related permits will be the responsibility of the Contractor. The Contractor, upon

Notice to Proceed, will immediately begin working on the permits so as not to delay completion of the project. The Contractor will prepare permits, associated drawings, public notices, and other related documentation as necessary to successfully meet permit approval status. The

Contractor must pay for associated permit fees.

2.18. CONTRACTOR’S USE OF THE SITE

Except for utility service provider access, the required coordination with local agencies, and observation and oversight by the Government, the Contractor will be allowed use of the site within the final limits of construction. The Contractor will maintain Government and public access to the existing facilities, parking, and staging areas.

End of Section 01 10 00.00 10