This statement of work document outlines requirements for renovating and expanding facilities at Coralville Lake in Iowa. The project includes interior renovations to an existing 7,400 square foot administration and visitor center building as well as constructing a new vehicle storage addition.
The renovation work involves demolishing remaining interior elements in the administration building and completing new interior buildouts and finishes. The visitor center exhibit area will be redesigned to include interpretive displays and interactive features. The project also requires building a new 2,000 square foot vehicle storage addition with six vehicle bays and a wash bay, connected to the administration building by a covered walkway. Site work includes repairs to utilities, pavement, and landscaping.
The statement of work provides detailed specifications for architectural, structural, mechanical, plumbing and electrical systems. Requirements are outlined for finishes, fixtures, signage and other interior elements. Sustainable design, accessibility, and energy efficiency standards are to be met. The document also includes appendices with reference drawings, existing condition photos, and room data sheets specifying space requirements.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 1
SECTION 01 10 00.00 20
STATEMENT OF WORK – PROJECT SPECIFIC REQUIREMENTS
25 October 2023
Contents
1. SCOPE
1.1. PROJECT OBJECTIVES AND GENERAL SCOPE
1.2. GOVERNMENT-FURNISHED GOVERNMENT INSTALLED EQUIPMENT (GFGI) .. 3
1.3. GOVERNMENT-FURNISHED CONTRACTOR INSTALLED EQUIPMENT (GFCI) .. 3
1.4. CONTRACTOR-FURNISHED CONTRACTOR INSTALLED EQUIPMENT (CFCI) ... 3
1.5. FURNITURE REQUIREMENTS
1.6. BETTERMENTS
1.7. DESIGN FREEDOM
1.8. CONTRACTOR’S USE OF THE SITE
2. PROJECT SPECIFIC REQUIREMENTS
2.1. GENERAL REQUIREMENTS
2.2. EXISTING CONDITIONS
2.3. HAZARDOUS MATERIALS (HTRW) CONSIDERATIONS AND MITIGATION
2.4. ENVIRONMENTAL
2.5. CULTURAL / HISTORIC PRESERVATION
2.6. SEQUENCING
2.7 CONSTRUCTION AND DEMOLITION (C&D) WASTE MANAGEMENT
2.8 DISRUPTION OF SERVICES
2.9 SITE DESIGN AND CONSTRUCTION
2.10 STRUCTURAL REQUIREMENTS
2.11. ARCHITECTURAL REQUIREMENTS
2.12. PLUMBING
2.13. HEATING, VENTILATING AND AIR CONDITIONING
2.14. ELECTRICAL, SPECIAL SYSTEMS AND TELECOMMUNICATIONS
REQUIIREMENTS
2.15. FIRE PROTECTION
2.16. ENERGY CONSERVATION
2.17. SECURITY (ANTI-TERRORISM AND FORCE PROTECTION STANDARDS)
2.18. APPENDICES
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 2
APPENDIX 1 – APPLICABLE CRITERIA
APPENDIX 2 – ESA/ABATEMENT DATA DOCUMENTS
APPENDIX 3 – REFERENCE DOCUMENTS – AS-BUILTS
APPENDIX 4 – EXISTING CONDITION PHOTOGRAPHS
APPENDIX 5 – VISITOR CENTER DISPLAYS
APPENDIX 6 – ROOM DATA SHEETS
APPENDIX 7 – VISITOR CENTER REQUIREMENTS
APPENDIX 8 – ADMINSTRATION BUILDING SEPTIC FIELD
APPENDIX 9 – ADJACENCY MATRICES
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 3
1. SCOPE
1.1. PROJECT OBJECTIVES AND GENERAL SCOPE
Refer to Phase 1 Solicitation Documents for Project Objectives and General Scope requirements.
1.2. GOVERNMENT-FURNISHED GOVERNMENT INSTALLED EQUIPMENT (GFGI)
Coordinate with the Government on GFGI equipment requirements. Provide suitable structural support, all utility connections, and space with required clearances for all GFGI equipment. Fire extinguishers are GFGI property. Local Area Network and personal Computers and related hardware, copiers, faxes, printers, video projectors, VCRs and TVs, and fire extinguishers are
GFGI.
The following are examples of typical GFGI equipment, but are not to be limited to:
a) Computers and associated peripheral hardware.
b) Printers, Copiers/Fax Machines, Plotters
c) Shredding Machines, Laminating Machines
d) Switches and servers for communications room
e) Kitchen Microwave Ovens, Ranges, Refrigerators, Dishwashers, Ice Machines
f) Visual and Interactive Displays associated with the Visitor Center
Refer to Room Data Sheets in the Appendices for more information regarding GFGI equipment.
1.3. GOVERNMENT-FURNISHED CONTRACTOR INSTALLED EQUIPMENT (GFCI)
Coordinate with the Government on GFCI equipment requirements. Provide suitable structural support, all utility connections, and space with required clearances for all GFCI equipment.
The following are examples of typical GFCI equipment, but are not to be limited to:
• Interactive whiteboard, projectors, and manual projector screens
Refer to Room Data Sheets in the Appendices for more information regarding GFCI equipment.
1.4. CONTRACTOR-FURNISHED CONTRACTOR INSTALLED EQUIPMENT (CFCI)
Coordinate with the Government on CFCI equipment requirements. Provide suitable structural support, all utility connections, and space with required clearances for all CFCI equipment. Fire extinguisher brackets and cabinets are Contractor furnished and Contractor installed (CFCI). The following are examples of typical CFCI equipment, but are not to be limited to:
• Audio/Visual equipment
• All new office furniture
Refer to Room Data Sheets in the Appendices for more information regarding CFCI equipment.
1.5. FURNITURE REQUIREMENTS
Provide furniture design and installation in accordance with the Room Data Sheets in the
Appendices. Coordinate with the user to define requirements for furniture systems, movable furniture, storage systems, equipment, any existing items to be used again. Early coordination of furniture design is needed for a complete and usable facility.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 4
Include the furniture design with the Design CLIN (0001), and the installation with the Furniture, Fixtures and Equipment CLIN (0005), and CLIN (0011).
General Furniture Requirements. The desks will be of the height-adjustable standing desk type.
Managerial offices will receive wood furniture of a matching style. Standard private offices and workstations will receive systems furniture of a laminate kind, which complements the aesthetics of the space and is of a matching style.
Refer to Room Data Sheets in the Appendices for furniture requirements of individual spaces.
1.6. BETTERMENTS
The following is a list of potential betterments:
(1) Betterment 1: Solar Array
Provide maximized coverage of photovoltaic panels on the southern slope adjacent to the south public parking lot. System design will accommodate metering to back feed 3-phase power to the utility when power generated exceeds power used in accordance with utility requirements. Provide coordination with local utility provider as applicable.
(2) Betterment 2: Enclosed Covered Connecting Walkway
Enclose and condition the new covered connecting walkway from the existing
Administrative and Visitor Center Building to the new Vehicle Storage Addition.
1.7. DESIGN FREEDOM
Refer to Phase 1 Solicitation Documents for additional Design Freedom direction.
Requirements stated in this Statement of Work (SOW) and other Request for Proposal (RFP) sections are minimums. An innovative, creative, or cost-saving Proposal that meets or exceeds these requirements is encouraged and will be considered more favorably.
U.S. Army Corps of Engineers (USACE) and Lake Personnel developed the project adjacency matrices and diagrams (See Appendix 9, ADJACENCY MATRICE). The level of quality for the facilities in this SOW are acceptable to the Government.
The adjacency matrices and diagrams, the SOW, the Outline Technical Specifications, and the other RFP information and requirements serve the Contractor’s building design and construction completion conditions, along with other code, regulatory and professional practice obligations.
The extent of the RFP’s document development does not relieve the offeror from completing the design, construction documentation, and construction of the facilities in conformance with
Applicable Criteria and Codes.
The adjacency matrices and diagrams illustrate desired general arrangements, orientation, and adjacencies; they are not intended to dictate the final layout and image for the project. Develop and refine the conceptual site and building design(s) in the completion of the design and construction documents. Such development must be consistent with the criteria and acceptable to the Government.
Select the final palette of colors and materials for the building’s interior and exterior to produce a pleasing appearance coordinated throughout the facility.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 5
1.8. CONTRACTOR’S USE OF THE SITE
During the project construction period, the Design-Build Contractor will provide job site trailer for contractor office space with temporary facilities and utilities.
Existing site utilities will be provided to the Contractor. Provide temporary sanitary facilities for
Contractor/Sub-Contractor use during construction activities.
Refer to Phase 1 Solicitation Documents for additional direction on the Contractor’s use of the site.
2. PROJECT SPECIFIC REQUIREMENTS
2.1. GENERAL REQUIREMENTS
2.1.2. REGULATIONS, STANDARDS, CRITERIA, AND CODES
The project’s design and construction must comply with all Federal, state, local, and associated regulations, standards, criteria, and codes identified and described under the APPLICABLE
CRITERIA and sections of this SOW, and referenced in Appendix 1, APPLICABLE CRITERIA.
2.1.3. COMPLIANCE WITH THE BUY-AMERICAN ACT
Comply with the Buy-American Act (BAA) in accordance with the Contract Clauses in the RFP.
2.1.4. SIGNAGE
All directional and informational signage placed will be clear, concise, and not negatively worded. The signage is required for access, informational, and purposes.
Supply construction project signage visible to the public in a location accessible to the public, which includes the “Building a Better America” emblem. Detailed information for the emblem can be found at https://www.whitehouse.gov/wp-content/uploads/2022/08/Building-A-Better-America-
Brand-Guide.pdf
See also Section 01 50 02 Temporary Construction Facilities.
2.1.5. ACCESSIBILITY REQUIREMENTS
Accessibility must be provided per the Architectural Barriers Act (ABA) and the Americans with
Disabilities Act Accessibility Guidelines (ADAAG) when ADAAG provides equal or greater accessibility than ABA.
2.1.5.
2.1.5.1. Facility Design and Construction.
(1) The main building entrance(s) on the ground level and the minimum required emergency egress exits, designed per applicable code, must be handicap accessible. Electronic exterior door openers with push button control are required at https://www.whitehouse.gov/wp-content/uploads/2022/08/Building-A-Better-America-Brand-Guide.pdf https://www.whitehouse.gov/wp-content/uploads/2022/08/Building-A-Better-America-Brand-Guide.pdf
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 6 the main entrance doors to the entry lobby of the Administration and Visitor Center
Building.
(2) Provide ABA clearances and door accesses in the building’s main entry/vestibule visitors use.
2.1.6. BUILDING AREAS
Refer to the Room Data Sheets in the Appendices for each room or area’s requirements. The areas indicated therein are minimum net areas.
2.1.7 BUILDING OCCUPANCY CLASSIFICATIONS
The listed occupancies below indicate anticipated occupancy types within each facility but may not be limited thereto. Designers of Record will provide a code review that determines each building’s occupancy classifications and construction types per applicable codes and criteria.
2.1.7.1. Existing Administration and Visitor Center Building
• B – Business (IBC)
2.1.7.2. New Vehicle Storage Addition
• S – Storage (IBC)
2.1.8. SURVEYS
Conduct pre- and post-construction condition surveys of existing structures, roadways, and other site features to remain that may be affected by Contractor operations. Contractor Surveys will include, but are not limited to, photographs, videos, sketches, and written descriptions. Submit condition survey documentation to the Contracting Officer. If the post-construction condition survey determines that damage has occurred to existing structures, roadways, and other site features to remain, repair the damage or replace the feature(s) to pre-damaged condition or better at no additional cost to the Government.
Conduct a topographic survey at the location of the new Vehicle Storage Addition to verify the site’s existing conditions provided by the Government. Conduct a post-construction topographic survey of the site at the location of the new Vehicle Storage Addition after the restoration of the site as part of the as-built documentation. The survey will have a horizontal datum of State Plane
Iowa South NAD 83 (2011) (CONUS) with units in U.S. Survey Feet. The survey’s vertical datum is to be NAVD 88 (GEOID 18) with units in U.S. Survey Feet. Contractor to establish their own survey control.
2.1.9 OPTIMIZE ENERGY PERFORMANCE
2.1.9.1. GENERAL
The Administrative and Visitor Center Buildingand the new Vehicle Storage Addition, including the building’s envelopes, HVAC systems, service water heating, power, and lighting systems, must meet the Mandatory Provisions and the Performance Rating Method (PRM) requirements of ASHRAE Standard 90.1 – 2019, 10 CFR Part 433 Energy Efficiency Standards For The Design
And Construction Of New Federal Commercial And Multi-Family High-Rise Residential Buildings, Energy Policy Act of 2005 (Public Law 109-58), Energy Independence Security Act of 2007, and
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 7
Executive Order (EO) 14057. CFR Title 10 Part 433 requires a 30 percent improvement over the
ASHRAE 90.1 Baseline if it is life cycle cost- effective (LCCE). If a 30 percent reduction is not
LCCE, the design will be modified to achieve the highest energy efficiency that is LCCE.
2.1.9.2. Codes, References and Guidelines:
The building and new addition are to conform to the APPLICABLE CRITERIA provided in this
SOW. See the Appendices.
2.1.10. THERMAL PERFORMANCE
2.1.10.1. BUILDING ENVELOPE SEALING PERFORMANCE REQUIREMENTS
Design and construct the Administrative and Visitor Center Building envelopewith a continuous air barrier to control air leakage into or out of the conditioned space. Identify all air barrier components of each envelope assembly on construction documents and detail the joints, interconnections, and penetrations of the air barrier components. Identify the boundary limits of the building air barriers and of the zone or zones to be tested for building air tightness on the drawings.
Trace a continuous plane of airtightness throughout the building envelope, make flexible, and seal all moving joints.
The air barrier material(s) must have an air permeance not to exceed 0.004 cfm / sf at 0.3” wg when tested in accordance with ASTM E 2178.
Join and seal the air barrier material of each assembly flexibly to the air barrier material of adjacent assemblies, allowing for the relative movement of these assemblies and components.
Support the air barrier to withstand the maximum positive and negative air pressure to be placed on the building without displacement or damage and transfer the load to the structure.
Seal all penetrations of the air barrier. If any unavoidable penetrations of the air barrier by electrical boxes, plumbing fixture boxes, and other assemblies occur, make them airtight by sealing the assembly and the interface between the assembly and the air barrier or by extending the air barrier over the assembly.
The air barrier must be durable to last the expected service life of the assembly.
Do not install lighting fixtures with ventilation holes through the air barrier.
Provide a motorized damper in the closed position. Connect the damper to the fire alarm system to open on call and fail in the open position for any fixed open louvers.
Damper and control to close all ventilation or make-up air intakes and exhausts, etc., when leakage can occur during inactive periods.
2.1.10.2. PERFORMANCE CRITERIA AND SUBSTANTIATION
Submit the qualifications and experience of the testing entity for approval. Demonstrate performance of the continuous air barrier for the opaque building envelope by performing the following tests:
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 8
Test the completed building and demonstrate that the air leakage rate of the building envelope does not exceed 0.4 cfm/ft2 at a pressure differential of 0.3” wg in accordance with ASTM’s E 779
(2003) or E-1827-96 (2002). Accomplish the tests by using pressurization or depressurization or both. Divide the volume of air leakage in cfm at 0.3” wg by the area of the pressure boundary of the building, including roof or ceiling, walls, and floor to produce the air leakage rate in cfm/ft2 at
0.3” wg. Do not test the building until it was verified that the continuous air barrier is in place and installed without failures in accordance with installation instructions. This will allow for timely repairs to the continuous air barrier, if needed, to comply with the required air leakage rate. Test the completed building using Infrared Thermography. Use infrared cameras with a resolution of
32.18 deg. F (0.1deg C) or better. Perform testing on the building envelope in accordance with the ISO 6781:1983 and ASTM C1060-90(1997). Determine air leakage pathways using ASTM E
1186-03 Standard Practices for Air Leakage Site Detection in Building Envelopes and Air Barrier
Systems, and perform corrective work, as necessary, to achieve the whole building air leakage rate specified above.
Notify the Government at least three (3) working days before the tests are performed to allow the
Government the opportunity to witness the tests. Provide the Government written test results confirming the results of all tests.
2.2. EXISTING CONDITIONS
This SOW includes reference drawings of the project site’s existing conditions, work limits, buildable areas, spoil locations and additional reference documents. See the Appendices.
The existing conditions plan is based on the topographic survey conducted by the Government.
The survey shows the approximate locations of existing site features and utilities that are to be field verified by the Contractor.
Use the provided information to develop the proposal and design the site. If a conflict exists between any of the reference drawings and documents provided by the Government and the technical requirements of the RFP, the RFP technical requirements will govern.
2.2.1. EXISTING ADMINISTRATION AND VISITOR CENTER BUILDING
The existing Administration and Visitor Center Building is comprised of the original
Administration Building constructed between 1958-1960 and a Visitor Center addition constructed on the east side of the building in 1992, essentially creating two wings,the Visitor
Center wing in the west section of the building and the Administration wing in the east section of the building. The Visitor Center wing is comprised of an Exhibit Area, Theater, Kitchen, Main
Entrance, Public Restrooms, and other storage and support spaces while the Administrations wing is comprised of Offices, Conference Room, Employee Breakroom, and Employee
Lockers/Shower space, Employee Restroom, and other storage and support spaces.
The original Administration Building is constructed of loadbearing masonry walls with a flat roof comprised of steel bar joists and a steel deck while the addition is constructed of wood frame with brick veneer walls and a flat roof of wood joists and plywood roof. Due to the original building being part garage, the floor elevation of the Exhibit Area, Public Restrooms, and some other support spaces in the Visitor Center wing is higher than the floor elevation of the Theater, Kitchen, Main Entrance, and Administration addition. Throughout the years, various interior modifications and HVAC and electrical upgrades have been done to meet the needs of the
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 9 occupants and mission. The original construction, addition, and most modifications are provided as reference drawings in the Appendices.
Due to issues with leaking of the flat roofs, a steel truss hip roof structure with insulation and a standing seam metal roofing was installed over the entire building between 2021-2022.
Unfortunately, during construction, rainwater inundated much of the interior during a sudden storm and damaged many of the finishes and caused mold growth within the walls and under the floor finishes. Because of this damage, almost all finishes (including those with asbestos containing material) have been removed along with all drywall and insulation from the walls, leaving only the wood stud or masonry interior walls, some ceiling grid, lights, electrical and
HVAC systems. The current conditions can be seen in the photos in the Appendices.
2.2.2. EXISTING RANGER STORAGE BUILDING
The existing Ranger Storage Building is a pre-engineered metal building with eight (8) overhead doors, two (2) exterior personnel doors, and windows. The building’s function is primarily for vehicle storage, but also includes an area for ranger and visitor center equipment storage.
The exterior is an insulated metal panel assembly, with metal liner panels on the interior of the building. The vehicle storage area has an exposed concrete floor and an exposed structural rigid frame with purlins. Interior light fixtures illuminate the garage space, which also houses storage pallets and It is important to note that the garage’s interior is not conditioned.
The equipment storage area is fully conditioned and features wood panel wall finishes, carpeting, acoustical ceiling tiles and grid, lockers, and storage cabinets.
Refer to the Phase 1 Solicitation Documents for the Coralville Lake Project site location. The
Government has provided reference documents of the existing conditions and existing photographs for the project site in Appendix 4, Existing Condition Photographs.
The Government will provide the project site topographic survey to the awarded Phase 2
Contractor. The United States Geological Survey (USGS) map of the project site can be obtained from the USGS website.
2.2.3. PROJECT SITE
The existing 7,400 square-foot Administration and Visitor Center Building is located to the northweste of the project site.
There is an access road off the Prairie Du Chien Road NE to the building. Public and employee parking areas are located to the southeast of the existing Administration and Visitor Center
Building and to the south of the existing Ranger Storage Building. Site utilities include water, natural gas, electric, telecommunications, storm sewer, sanitary sewer, and a septic tank and fieldlocated around and to the northwest of the building.
2.2.4. UTILITIES
2.2.4.1. Site Utilities.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 10
• Locations of existing site utilities are included as part of the RFP. See the reference drawings in the Appendices for the existing conditions of the site. Verify existing utilities and notify the Contracting Officer immediately of any discrepancies.
2.2.4.2. Storm Sewers.
• Review the existing conditions of the site and design and install new storm sewers, inlets, and manholes at the site as needed to provide positive and adequate storm drainage.
2.2.4.3. Septic Field.
• A septic tank and field for the site is located North of the Administration and Visitor Center
Building as indicated on the reference drawings attached in the Appendices.
2.2.4.4. Electrical Service.
• The existing service transformer was recently relocated to facilitate the new entrance to the existing Administration Building. Provide utility service transformer, generator set, automatic transfer switch (ATS), and service entrance equipment as required. Coordinate and design for the best location to locate the service transformer, generator set, ATS, and all service equipment for approval by USACE.
2.3. HAZARDOUS MATERIALS (HTRW) CONSIDERATIONS AND MITIGATION
Should any hazardous materials not identified during the site investigation be encountered during demolition or construction, immediately stop work in the affected area, notify the Contracting
Officer, and await Contracting Officer’s direction before proceeding with additional work in the area.
2.4. ENVIRONMENTAL
2.4.1. GENERAL
Refer to the Phase 1 Solicitation Documents for General Environmental requirements.
2.4.2 NEST SITES
Although there are known nest sites in the surrounding area, none are known to exist within 100 feet of the work site. In accordance with the “Bald and Golden Eagle Protection Act” and
“Migratory Bird Treaty Act,” limit construction activity near bald eagle roosting sites during the winter months unless otherwise approved by the Contracting Officer. Conduct operations in a manner that minimizes the disturbance to bald eagles. Contact the USFWS or Iowa DNR for assistance.
2.5. CULTURAL / HISTORIC PRESERVATION
2.5.1. GENERAL
If, during construction, any previously unidentified or unanticipated historical, archeological, and cultural resources are discovered or found, activities that may damage or alter such resources will be suspended. Resources covered include but are not limited to, any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, 01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 11 paving, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or finding, immediately cease operations and notify the
Contracting Officer who will ensure appropriate authorities are notified and a determination is made as to their significance and what, if any, special disposition of the findings should be made.
Cease all activities that may result in the impact of or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or disturbing such resources.
2.5.2. COORDINATION
Cultural and historical coordination with local agencies per the National Historic Preservation Act
(NHPA) was conducted by the Government and the requirements are included as part of the RFP.
2.6. SEQUENCING
It is the desire of the Government to achieve partial beneficial occupancy of the Administration
Wing of the building before the completion of all construction activities.
A. Complete design and associated documentation.
B. Prioritize Interior Buildout and Renovation of the Administration and Visitor Center Building as follows:
i. Administration Wing
ii. Visitor Center Wing
C. Construction of the new Vehicle Storage Addition can be concurrent with Interior Buildout and Renovation activities of the existing Administration and Visitor Center Building.
D. Demolition of the existing Ranger Storage Building (if Option is awarded).
2.7 CONSTRUCTION AND DEMOLITION (C&D) WASTE MANAGEMENT
Develop and implement a Construction Waste Management Program for the project. The Program will include the management of construction waste, recycling processes, and disposal of demolition debris/waste. Establish a process for clear tracking and documentation of construction waste and demolition debris/waste. The Program will include but is not be limited to a description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of materials, the name of landfill(s)to be used, identification of materials that cannot be recycled or reused with an explanation or justification, a description of how materials will be protected from HTRW contamination and identification of local jurisdiction requirements for waste management.
2.8 DISRUPTION OF SERVICES
• Disruption of utility services is not permitted without prior Contracting Officer’s approval.
• Coordinate and submit requests for disruption of existing services with the Contracting
Officer.
• Coordinate any shut down with the Contracting Officer and facility staff in advance.
• Begin work only after the Contracting Officer and facility staff are fully informed and has agreed to the shut-off schedule.
• Do not cut into existing services without verifying with the Contracting Officer that the service has been correctly identified and shut off.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 12
• Operation of existing valves, switches, etc., to affect service shutdown will be completed by the Government unless arranged otherwise.
• Fabricate and install interconnecting portions of these systems before shutting down for final connections.
• Maintain utilities or other services indicated to be abandoned, in service, or provide alternate service means until new facilities are provided, tested, and put in operation.
• Review all existing conditions, drawings, and other documents for proper coordination between new and existing construction.
• Active utilities whose locations are unknown to the Government are suspected to exist. Be cautious of their existence and immediately report them to the Contracting Officer for direction if/when they are encountered.
• Damages to existing structures, utilities, and other items caused by the Contractor's operations will be repaired or replaced to their original conditions by the Contractor.
2.9 SITE DESIGN AND CONSTRUCTION
2.9.1 GENERAL
The design and construction of the site’s exterior area is to include, but not be limited to, site design and layout; obtaining required construction permits; clearing and grubbing; stripping, excavation, stockpiling, backfilling, and compaction; site grading and drainage; utility work to include storm sewer, sanitary sewer with oil/water separator water main, , gas main, and electrical
; aggregate placement;; placement of new concrete pavement, , and slabs;; installation of chain-link gate,; pavement marking; demolition of existing building and pavement ; turf repair; topsoil placement and seeding; and site restoration. The Contractor to verify existing site conditions and utilities that will affect the project’s design and construction as indicated.
2.9.2. SITE ACCESS, WORK AREA LIMITS, AND STAGING
Indicate on the design drawings the access routes, construction work area limits, and staging area(s) to be used during the construction period. The Contracting Officer will approve the exact work area limits and location of all staging area(s).
Access to the existing Administration and Visitor Center Building and the Maintenance Building to the northwest of the existing Administration and Visitor Center Building must be maintained for emergency response vehicles, USACE, and Project Office personnel. The County, local Fire
Department, and Police are to be notified prior to any required public road closures and the agency requirements are to be followed.
2.9.3. DEMOLITION
Demolition is to include, but may not be limited to, the following:
Remove all construction and demolition waste materials from the project site. Obtain all required permits prior to soil excavation, building demolition, hauling, and disposal as required by this
SOW. Control dust and debris in and around the project site.
Recycle waste material to the greatest extent possible and submit proof of recycling in the monthly and final reports. The use of material such as crushed concrete and masonry materials as engineering fill constitutes recycling.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 13
As part of the site demolition design, develop a construction and waste management plan for proper removal and disposal of non-contaminated and contaminated materials. The plan will identify the materials to be separated and sorted on-site prior to proper disposal.
Remove exterior site features and equipment that hinder the demolition process or create a safety hazard. Remove exterior utilities and equipment and cap utilities associated with the demolition of the existing building. Abandoning and capping utilities is an acceptable alternative; however, an outline of the effort for the site must be submitted in the Design Packages for review and approval. Cap the utilities at the main line or trunk line location following coordination with the
Contracting Officer and private utility company, as applicable. Demolish all equipment associated with the utility that will no longer be used. Equipment may include, but is not limited to, heating, ventilation, and air conditioning (HVAC). Include the safe removal of refrigerants and other chemicals, overhead conveyance systems, unused utilities, etc. Remove and demolish these ancillary items to a distance of 15 feet all around the building or as directed by the Contracting
Officer.
The site’s existing pavement, sidewalks, and public parking area will remain, except as indicated on the Government provided reference drawings.
2.9.4. STORM WATER MANAGEMENT
Storm water management may be required during project construction due to the amount of land disturbance. Verify, coordinate with, and obtain a National Pollutant Discharge Elimination System
(NPDES) No. 2 permit from the Iowa DNR only as needed. This will include a Storm Water
Pollution Prevention Plan (SWPPP) conforming to Iowa DNR requirements. The permit application and plan will be submitted by the Contractor to the Contracting Officer.
Provide all corresponding permit fees and allow sufficient time for processing and return.
Implement, maintain, and update the plan as required. Design drawings will include erosion and sediment control features as required and as necessary to stabilize disturbed areas, minimize site erosion, and prevent silt-laden stormwater from leaving the site.
2.9.5. TREES AND VEGETATION CLEARING AND GRUBBING
Show the clearing and grubbing limits for trees and vegetation on the design drawings. As outlined in this SOW, tree and vegetation removal must be minimized to the greatest extent necessary for new construction. Clearing and grubbing debris will become the property of the Contractor and will be removed from the project site. Clearing and grubbing activities will comply with Federal and state requirements as applicable for clearing, grubbing, and proper off-site disposal.
2.9.6. STRIPPING, EXCAVATION, BACKFILLING, AND GRADING
Strip sod, topsoil, and root zone materials required for new project construction in a manner to limit the amount of stripping needed to the greatest extent necessary. Stripped materials will be used as topsoil at the site, with excess stripped materials to be spoiled on-site as approved by the Contracting Officer, spoiled at the indicated spoil location as shown in the Appendices, or properly disposed of off-site. The exact spoil locations will be coordinated with the Contracting
Officer.
Excavate subgrade to establish proper finished grades based on the site’s design. Place any needed fill and backfill in required lifts and compact to the required density. Design and grade the
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 14 site to provide positive drainage and prevent the ponding of stormwater. Grade to provide positive drainage away from the new addition’s finished floor. Finished turf slopes to be a minimum of 1 percent with turf side slopes not to exceed 3 feet horizontal to 1-foot vertical. Retaining walls may be used to provide grade changes.
2.9.7. STORM DRAINAGE
Any storm drainage system(s) required based on the site’s design will be designed for the 25-year rainfall event and designed and constructed in accordance with IA DOT and Iowa Statewide
Urban Design and Specifications (SUDAS) standards and criteria. Rainfall intensity will be determined from the best available intensity-duration-frequency data for the site’s location. Storm runoff onto the site from adjacent properties will be verified and included in the storm drainage calculations. The storm drainage system’s design will be checked for a 100-year return event to ensure no flooding of the new addition’s finished floor. Design and construct the drainage system(s) such that parking areas and areas adjacent to the new addition drain adequately, with stormwater flowing away from the new addition. Downspouts are to discharge at least 5 feet from the new addition’s exterior walls.
Storm drainage system(s) can consist of swales, curb cuts, storm drainage structures, and piping required based on the site’s design. Tie any new storm drainage system(s) into existing storm drainage systems to remain as needed. New concrete pavement, sidewalks, and slabs will be designed and constructed to provide positive drainage and prevent the ponding of stormwater.
Storm sewer inlet and manhole structures in traffic areas must be rated to withstand heavy vehicle loading. Inlet grates will be "Bicycle Tire Proof” type. If new sidewalks cross existing or new drainage swales, ensure positive drainage away from the sidewalks for these areas. Swale side slopes will not exceed 3 feet horizontal to 1 foot vertical.
The site’s design must incorporate features to control stormwater runoff and erosion and provide zero erosion discharge to the greatest extent possible during construction. Adhere to NPDES requirements during construction.
2.9.8. PAVEMENT, SIDEWALKS, AND SLABS
Design and construct new concrete pavement, sidewalks, and slabs in accordance with Iowa
DOT, Iowa SUDAS, and AASHTO standards and criteria. New concrete pavement will be reinforced concrete on new aggregate base and new concrete sidewalks and slabs will be new concrete on new aggregate base meeting the indicated standards and criteria.
New concrete pavement and slabs will have a minimum compressive strength of 4,500 psi at 28 days, a thickness of 8 inches on 6 inches of aggregate base, and will be reinforced with dowels for load transfer and tie-bars for joint control meeting the indicated standards and criterial. New concrete sidewalks will have a minimum compressive strength of 4,000 psi at 28 days and thickness of 6 inches on 4 inches of aggregate base. New sidewalks will be 6 feet wide, will be widened as needed to meet building entrance and exit ways, and will have a smooth transition to existing sidewalks to remain. Scarify and re-compact subgrade prior to placement of new aggregate and place and compact aggregate prior to placement of new pavement, sidewalks, and slabs.
Concrete contraction, construction, and isolation joints will be constructed and installed for new concrete pavement, sidewalks, and slabs. Sawcut contraction and construction joints at
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 15 maximum 10 by 10 foot spacings for concrete pavement and slabs or as approved by the
Contracting Officer. Sawcut contraction and construction joints for concrete sidewalks at maximum spacings meeting the width of the sidewalks. Install joint filler for isolation joints and backer rod for contraction and construction joints and apply sealant for all new joints. The joint opening is to be thoroughly cleaned before installing joint filler, backer rod, and applying sealant.
Sealant material is not to be spilled on exposed concrete surfaces.
2.9.9. PARKING AREA, CHAIN-LINK GATE, AND LANDSCAPING
The site’s design is to include a parking area located to the west of the new Vehicle Storage
Addition. Parking area to be located parallel to the existing access road with ten (10) parking stalls, nine (9) feet wide and nineteen (19) feet deep. Apply pavement markings per the requirements of the IA SUDAS.
Install a new manual chain-link slide gate at the approximate location as indicated on the reference drawings provide by the Government. Gate to be twenty-four (24) feet wide and seven
(7) feet high with no barbed wire outrigger. Gate posts to be four (4) inches in diameter.
Provide landscaping to include boulders and shrubs on each side of the gate posts to act as barriers to help prevent access around the gate posts. Shrubs must be native and/or adapted species requiring little maintenance and water and appropriate for the climate zone and location.
No irrigation system is required. Landscaping features will be approved by the Contracting Officer and USACE Biologist. Establishment including watering, warranty period, and acceptance, will be per the requirements of the IA SUDAS.
2.9.10. SITE MOBILIZATION AND RESTORATION
Clean all construction equipment and materials prior to bringing them onto the project site. Ensure that the equipment and materials are free from soil residuals, egg deposits from plant pests, plant seeds, roots, or rhizomes of invasive plants. Consult with the USDA jurisdictional office for additional cleaning requirements. Remove all construction materials, debris, and clean the project site at the end of the construction. All construction and damaged turf areas must be restored by the Contractor to pre-construction conditions or better. All new turf areas and damaged turf areas are to have 4 inches of topsoil placed, be seeded, or have new sod placed.
The grass seed mixture to be a Type 1, Permanent Lawn Mixture per the Iowa Statewide Urban
Design and Specification Program (SUDAS) or a hydro-seed that meets the same requirements.
Establishment including watering, warranty period, and acceptance will be per the requirements of the IA SUDAS. Acquire all seeds used as a cover crop, permanent seeding, or for erosion control from certified vendors under an international program directed by the Association of
Official Seed Certifying Agencies. Vendors supplying any mulch for the project must also be certified vendors of weed-free mulch. Seed and sod types will be approved by the Contracting
Officer and USACE Biologist.
2.10 STRUCTURAL REQUIREMENTS
2.10.1. GENERAL
Analyze, evaluate, design, and detail the building(s) as a complete structural system. Design structural elements to prevent damages to finishes, partitions, and other frangible, nonstructural elements; to prevent impaired operability of movable components; and to prevent cladding
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 16 leakage and roof ponding. Limit deflections of structural members to the allowable of the applicable material standard (e.g., ACI, AISC, AISI, AWC, etc.) The design of the building’s structural components is to be completed by a registered professional engineer licensed in the
State of Iowa, with experience in the design of similar structures.
Account for interior and exterior climate conditions, extreme weather mitigation/resiliency, exposure and occupancy/risk categories, site considerations, and other adverse conditions when selecting cement and admixture types to be used in concrete, the concrete cover over reinforcing steel, the coatings on structural members, expansion joints, the level of corrosion protection, and the structural systems. All concrete will be a minimum of 4,500 psi and be reinforced. The floor-mounted mechanical and electrical equipment will be placed on a concrete slab by the Contractor.
In addition to gravity/uplift/lateral loads and seismic loads (if applicable), design ancillary building items (i.e., doors, window jambs and connections, overhead architectural features, equipment bracing, etc.) per the current minimum requirements of DoD Minimum Antiterrorism Standards for
Buildings: Unified Facility Criteria UFC 4-010-01.
2.10.2. APPLICABLE STANDARDS, CODES, AND CRITERIA
The structural design will fully follow the provisions provided in the APPLICABLE CRITERIA. See the Appendices. Use the latest edition of the International Building Code (IBC) and American
Society of Civil Engineers (ASCE) 7 for design guidance and coordinate the design with the current UFC 4-010-01. Where the provided guidance in one standard conflicts with the guidance provided in another, the more stringent design provisions will prevail.
2.10.2.1. Project Specific Minimum Design Loads (per UFC 3-301-01):
1) Dead Loads:
• Roof-Mounted Solar Panel Allowance (new construction only)
2) Live Loads:
• 20-psf (roofs – all other construction)
• 50-psf (office buildings – offices)
• 80-psf (office buildings – corridors above first floor)
• 100-psf (office buildings – lobbies and first floor corridors)
• 125-psf (storage warehouses – light; mechanical and electrical rooms*)
• 250-psf (sidewalks, vehicular driveways, and yards subject to trucking)
3) Wind Loads (New Construction Only):
• 120-mph (3-second gust, risk category II, exposure category C)
4) Snow Loads:
• Design for balanced and unbalanced loads
• Frost Penetration Depth: 42-inches
5) Seismic Design Data (New Construction Only):
The mapped maximum considered earthquake (MCE) spectral response accelerations for
Site Class B; Risk Category II are:
• Ss (MCER ground motion, 0.2s period) = 7%g
• S1 (MCER ground motion, 1.0s period) = 6%g
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 17
The acceleration values identified are for the general location of the facility. Verify and use site specific criteria based on the final site location of the facility. Adjust site class per IBC to match specific site information in the geotechnical report.
2.10.2. FOUNDATION:
New foundations must be site-specific and be designed with known geotechnical considerations by an engineer knowledgeable of the local conditions (e.g., expansive soils, groundwater levels, etc.). New interior bearing walls and/or columns are to have new foundations cut into the lower-level floor slab as required for adequate support. Coordinate the need for a vapor barrier with the architectural floor finishes and requirements of the Geotechnical Design Report.
All slabs-on-grade will receive a coating (i.e., epoxy) or an overlaying finish (i.e., carpet, tile, etc.), and be underlain by a vapor barrier system with a minimum of 10-mil polyethylene membrane.
All building slabs and foundations at the project location must be treated for subterranean termites per Unified Facilities Guide Specification (UFGS): UFGS 31 31 16 – Soil Treatment for
Subterranean Termite Control, prior to concrete placement.
2.10.3. Floor Framing:
Floors of new construction must be ordinary slabs-on-grade.
2.10.4. Concrete Masonry Unit (CMU) Masonry Walls:
When applicable, new CMU walls, either load bearing or non-load bearing, may be used, provided exterior walls satisfy UFC 4-010-01. See Section 2.14.3.6.
Interior Framed Partition Walls:
Interior framed partition walls should be designed in a manner that minimizes sound transmission and improves acoustical performance.
2.10.5. Roof Framing:
Provide permanent fall protection anchor points on the roof for future building maintenance and other work. The fall protection system should be able to carry a single 5,000-pound. impact load for each person attached to the system.
2.10.6. Design Analysis:
Computer- generated calculations must identify the program’s name, source, and version. Provide input data and include loads, loading diagrams, node diagrams, and adequate documentation to illustrate the design. The schematic models used for input must show, as a minimum, nodes/joints, elements/members, materials/properties, and all loadings, reductions, factors of safety, induced settlements/deflections, etc., and a list of load combinations. The results must include an output listing for maximum/minimum stresses/forces, deflections/deformations for each element, and reactions for each loading case and combination.
2.10.7. Project Specific Design Analysis Requirements:
Provide updated structural computations for the existing Administration Building’s wood floor framing load capacity. Account for any proposed changes to floor loads (i.e., floor finishes, occupancy/use, etc.) to confirm its performance and verify that it is structurally adequate.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 18
2.11. ARCHITECTURAL REQUIREMENTS
2.11.1. DESIGN:
Renovate the existing Administration and Visitor Center Building and provide a new Vehicle
Storage Addition with a covered connecting walkway. As a potential betterment, the covered connecting walkway would be enclosed and heated/cooled.
2.11.2. FUNCTIONAL AND AREA REQUIREMENTS
Refer to Room Data Sheets (See APPENDIX 6 ROOM DATA SHEETS) and Adjacency Matrix
(See APPENDIX 9 – ADJACENY MATRICE) in the Appendices for a list of required spaces, areas, and adjacencies.
2.11.2.1. Definitions:
Gross Building Area Total constructed area of the building. It is measured to the outside finished surface of permanent outer building walls, without any deductions. Non-enclosed roof areas are counted at 0.5.
Net Area Net area is measured to the inside face of the room or finish walls.
Net Area Requirements
Net area requirements for programmed spaces are included in this SOW.
If net area requirements are not specified, the space is to be sized to accommodate the required function and to comply with code requirements, overall gross area limitations, and any other requirement of this RFP (for example, area requirements for corridors, stairs, and mechanical rooms will typically be left to the discretion of the Contractor).
2.11.2.2. ADMINISTRATION WING FUNCTIONAL REQUIREMENTS
The Administration wing of the existing Administration and Visitor Center Building will provide administrative space for USACE personnel to carry out their daily activities to achieve various missions.
Natural Resource Specialists (Park Rangers) perform various duties at the reservoir both in the field and administrative functions. Rangers are responsible for program areas of flood risk management and dam safety, recreation management, and environmental stewardship. These duties are often done in teams, so they will require their offices near one another to collaborate, hold meetings and perform their daily functions.
All management staff perform administrative functions of managing the project’s lands and water, budget, and personnel. These offices should be away from the Natural Resource Specialists for privacy in daily administrative duties. Administrative staff assists all employees with many administrative responsibilities, purchases, travel, and timekeeping functions. All employee offices and common areas should be away from public view and access.
The main building access for employees will be on the northeast end of the Administration and
Visitor Center Building. The access will be secure and separate from the public. The administrative areas intended for daily USACE operational activities must be secured from the general public’s access and view. The public will only have open access to the main lobby and the Visitor Center.
01 10 00.00 20 – Statement of Work – Project Specific Requirements - Page 19
2.11.2.3. VISITOR CENTER WING FUNCTIONAL REQUIREMENTS
The goal of Visitor Center wing is to disseminate information to the visiting public about USACE, its mission, the Project and its facilities, visitor safety, and the geographic area of the Project. The
Visitor Center exhibits should convey the story so that the experience will be educational, interactive, enjoyable, and safe.
Provide a comprehensive design of the Visitor Center to include all functional spaces, display areas, supporting equipment and furnishings, interpretive signs, displays, and interactive features. Consult with USACE staff to develop appropriate exhibits, displays, and verbiage for interpretive signage.
A strength may be given to aesthetically pleasing spaces that are sympathetic to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .