This document provides details for a federal construction contract solicitation for the South Shore of Staten Island, Area E, New York Hurricane Sandy Coastal Storm Risk Management Project. The U.S. Army Corps of Engineers, New York District will execute construction including large interior drainage ponds connected by an open channel culvert, various stormwater drainage structures such as box culverts and chambers, and relocation of sanitary sewers. The firm-fixed price construction contract will be solicited on an unrestricted basis through an invitation for bids with a total estimated cost between $100-175 million. The performance period is 1,279 calendar days from notice to proceed. Questions must be submitted in writing by early to mid December 2023 and bids are due approximately 30 days later. Construction Contractor Appraisal Support System past performance evaluations will be required.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: Revise and Reissue Bid schedule
All RFIs are due no later than 15 February 2024 at 12:00 PM. EST NOTE: Bidders must acknowledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 33
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0002
X 9B. DATED (SEE ITEM 11)
22-Dec-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CHANGES
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 117 Cubic
Yard Concrete Pipe Collars
FFP
Includes concrete and Graffiti Resistant Coating for pipe collars.
Quantity is ESTIMATED.
FOB: Destination
PSC CD: C219
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1,612 Cubic
Yard Concrete (Non-structural)
FFP
Includes un-reinforced concrete for forebays and micropool.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 407 Linear
Foot
15" DIP
FFP
Includes pipe material, excavation, and pipe bedding for surface pond inlets.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 9 Each
15" Flap Gate
FFP
Includes flap gate, excavation, and bedding for surface pond inlets.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 233 Linear
Foot
18" DIP
FFP
Includes pipe material, excavation, and pipe bedding for surface pond inlets.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 6 Each
18" Flap Gate
FFP
Includes flap gate, excavation, and bedding for surface pond inlets.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 328 Linear
Foot Berm Box Sewer
FFP
All work necessary to install precast box sewer including excavation, and materials.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 8 Each
4' x 2' Flap Gate
FFP
Includes flap gate, excavation, and bedding for surface pond inlets.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 700 Cubic
Yard Debris Removal and Disposal
FFP
Includes removal and disposal of debris, refuse, construction waste, demolition debris, abandoned equipment, and other non-soil materials.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0010 181,281 Square
Yard Clearing, Grubbing and Removals
FFP
Includes felling, trimming, and cutting of trees and satisfactory disposal of trees and other vegetation designated for removal.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0011 239 Each
Tree Removal
FFP
Includes tree removal from 6" to above 24" DBH and disposal.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 297,350 Cubic
Yard Excavation
FFP
Includes all labor, materials, equipment and work for excavation, dewatering and on-site transportation of excavated materials from Ponds. This item also includes over excavation for the ponds (~1ft) and areas for phragmites removal.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0013 380,498 TON
Handling, Transportation, & Disposal
FFP
Handling, Transportation, & Disposal of Non-Hazardous Contaminated Soil.
Includes all labor, materials, equipment and work for handling, hauling and disposal of contaminated materials. All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 750 TON
Sampling & Testing
FFP
Sampling & Testing of Contaminated/Potentially Hazardous Soil for Disposal Parameters
Includes all labor, materials, equipment and work for the collection and testing of soil sample sets to determine disposal parameters and appropriate handling and disposal methods.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0015 42,278 TON
Handling, Transportation, & Disposal
FFP
Handling, Transportation, & Disposal of Hazardous Contaminated Soils.
Includes all labor, materials, equipment and work for handling, hauling and disposal for soils determined to have hazardous concentrations of contaminants.
This item applies only for material excavated from ponds that is determined to be hazardous by testing results. For bidding purposes, assume 10% of all material excavated from ponds is hazardous.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0016 1 Job
As-Builts
FFP
AS-BUILT "Contractor shall complete the Record ("As-Builts") CAD submittal as required by Specification Section 01 78 00 CLOSEOUT SUBMITTALS for Record Drawings ("As-Builts") Requirements $100,000.00.
FOB: Destination
$100,000.00
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0017 15,500 Cubic
Yard Fill
FFP
Includes all labor, materials, equipment and work for fill and grading at the Ponds.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0018 2,037 Each
Trees
FFP
Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0019 195,200 Each
Herbaceous Plants (Plugs)
FFP
Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0020 2,413 Each
Shrubs
FFP
Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0021 147,459 Square
Yard Seeding
FFP
Includes furnished seed, seeding areas, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all seeded areas.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0022 60,427 Cubic
Yard Top Soil
FFP
Include the cost of all labor, materials and equipment necessary to prepare topsoil areas, furnish, mix, place and incorporate topsoil and compost, and all other work incidental thereto, in accordance with the plans and specifications to the satisfaction of the Contracting Officer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0023 1 Job
Vector and Pest Control
FFP
Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0024 147,459 Square
Yard Jute Mesh
FFP
Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0025 1 Job
Invasive Plant Removal and Treatment
FFP
The quantity to be measured for payment shall be work days for invasive plant removal and herbicide treatment. Crew (2 people).
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0026 600 Each
Tree and Root Pruning
FFP
Includes completion of general tree pruning and all mobilization and incidental costs, including the disposal of wood chips.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0027 49,184 Linear
Foot Goose Exclusion Fence
FFP
Includes the total number of linear feet of fence furnished, installed, maintained and accepted in accordance with the Plans and Specifications and the directions of the Engineer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0028 2,832 Each
Deer Cage
FFP
Includes the cost to furnish all materials, labor, and equipment necessary to install the deer fence specified herein as required by the Engineer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0029 11,406 Linear
Foot Construction Limit Fence
FFP
The quantity to be measured for payment shall be the total number of linear feet of construction limit fence furnished, installed and maintained in accordance with the Plans and Specifications and the directions of the Engineer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0030 14,282 Square
Yard Slope Stabilization Mat
FFP
Includes per square foot of slope stabilization mat installed shall constitute full compensation for all labor, material, and equipment and incidental expenses necessary to complete the work as shown on the contract drawings and in accordance with the specifications to the satisfaction of the Engineer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0031 277 Each
Tree Guard
FFP
Includes the cost for all labor, materials and equipment required for installation of temporary wooden tree guards.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0032 1 Job
SWPPP Permit Compliance
FFP
Includes material for, installation of, and maintenance of: sediment traps, stabilized construction entrances, silt fences, dirtbags, portable sediment tanks, and other temporary erosion and sediment controls; as required for SWPP permit compliance.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Not Available
FFP
This CLIN is not available.
FOB: Destination
N/A
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0034 8,961 Linear
Foot Black Chain Link Fence
FFP
Includes linear feet furnished and installed in accordance with the plans, specifications and directions of the Engineer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0035 60 Each
Permanent Signs on Steel Rail Posts
FFP
The quantity of 0.080" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed on steel posts or delivered in accordance with the plans, specifications and directions of the Engineer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0036 72 Each
0.020" Temporary Signs
FFP
The quantity of 0.020" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed at the designated locations or delivered to DEP, in accordance with the plans, specifications and directions of the Engineer.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0037 10,779 Square
Foot Pavers
FFP
Permanent Maintenance Accessway (Pavers)
Includes installation and materials (concrete pavers, geotextile, gravel, sand and topsoil) for 12' wide accessways and weir chamber accessway.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0038 55,108 Square
Foot Gravel
FFP
Permanent Maintenance Accessway (Gravel)
Includes installation and materials (geotextile, gravel, sand and topsoil) for 6', 10' and 12' wide accessways.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0039 86 Each
Survey Monuments
FFP
Includes unit price per survey monument, and shall include the cost of all labor, materials, equipment, and all work incidental thereto, necessary to complete this item in accordance with the plans and specifications and to the satisfaction of the Engineer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0040 11 Each
Fence Swing Gate
FFP
Includes fabricating and installing swing gate and posts, furnishing modified Lock, and fabricating and furnishing steel plate lock cover in accordance with the plans, specifications and directions of the Engineer, the Contractor shall receive the unit price bid.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0041 1,652 Square
Yard Reno Mattress
FFP
Includes all excavation, grading and geotextile fabric necessary to install the total square yards of reno mattress as directed by the Engineer.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0042 1 Job
Quintard Street Structures
FFP
All work necessary to construct Headwall #1, Box Sewer #1 & #2, Weir Chamber # 1 and Junction Chamber # 1 & 2 at Quintard Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0043 1 Job
Sand Lane North Structures
FFP
All work necessary to construct Headwall #2, Box Sewer #3, and Junction Chamber # 3 at Sand Lane and Quincy Ave, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0044 1 Job
Sand Lane South Structures
FFP
All work necessary to construct Weir Chamber #2, Box Sewer #4 & 6, and Junction Chamber # 4, 8 & 9 at Sand Lane and Father Capodanno Blvd., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0045 1 Job
Pearsall Street Structures
FFP
All work necessary to construct Headwall #3, Box Sewer #5, 8" Water Main and Junction Chamber # 5 & 7 at Pearsall St., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0046 1 Job
Mallory Avenue - Storm Network
FFP
All work necessary to install storm sewer network along Mallory Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” RCP and 24” RCP, piles, flap gate, catch basin, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0047 1 Job
McLaughlin Ave North - Storm Network
FFP
All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, flap gate, manholes excavation, dewatering, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0048 1 Job
McLaughlin Ave South - Storm Network
FFP
All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24" RCP, Piles, flap gate, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0049 1 Job
Wentworth Avenue - Storm Network
FFP
All work necessary to install storm sewer network along Wentworth Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0050 1 Job
Orlando Avenue - Storm Network
FFP
All work necessary to install storm sewer network at the end of Orlando Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 4’-0” W X 2’-0” H RCP, piles, flap gate and MPT in accordance with the Contract Drawings and Specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0051 1 Job Oceanside Avenue - Storm Network
FFP
All work necessary to install storm sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications
0052 1 Job Agnes Place - Storm Network
FFP
All work necessary to install storm sewer network along Agnes Place, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
0053 1 Job Andrew Street - Storm Network
FFP
All work necessary to install storm sewer network along Andrew Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, Junction Chamber #6, 38"W X 24"H Elliptical RCP, 15” RCP, piles, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
0054 1 Job Vulcan Street - Storm Network
FFP
All work necessary to install storm sewer network along Vulcan St, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18" ESVP, piles, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings
0055 1 Job Lansing Avenue - Sanitary Network
FFP
All work necessary to install sanitary sewer network along Lansing Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
0056 1 Job Oceanside Avenue & Quintard Street
FFP
Sanitary Network All work necessary to install sanitary sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 30” RCP, 24” RCP, piles, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
0057 1 Job Sand Lane North - Sanitary Network
FFP
All work necessary to install sanitary sewer network along Sand Lane North, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 8” ESVP, piles, manhole, utility removal, pavement restoration and MPT in accordance with the Contract Drawings
0058 11,431 Linear
Foot
Television Inspection of Sewer
FFP
All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually inspected to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes. CCTV Inspection for pre and post sewer installation. Quantity is
ESTIMATED
0059 11,431 Linear
Sewer Cleaning
All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually cleaned of loose debris, grease, oil, and silt to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes.
Quantity is ESTIMATED.
0060 322 Linear
8" Water Main
All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0061 450 Linear
Foot 20" Water Main
FFP
All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0062 34 Linear
Foot 12" Water Main
FFP
All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement restoration and MPT in accordance with the Contract Drawings and Specifications.
Quantity is ESTIMATED.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0063 1 Job all other costs to perform construction
FFP
All other costs to complete the work in accordance with the contract drawings and specifications, which are not captured in a specific line item above, including but not limited to general conditions, mobilization/demobilization, bond, etc.
Quantity is ESTIMATED.
FOB: Destination
NET AMT
TOTALS
TOTALS:
TOTAL CLINs 0001-0063 $_______________
(End of Summary of Changes)