This document is a Bid Schedule for Solicitation W912DS24B0002, the South Shore of Staten Island, Area E Hurricane Sandy Coastal Storm Risk Management Project construction contract. The contract is for the construction of large interior drainage ponds, various stormwater drainage structures, and relocation of existing sanitary sewers. The contract includes over 60 line items for concrete, piping, excavation, landscaping, fencing, access roads, and other related work. The estimated total contract value is between $100 million and $175 million. The solicitation will be issued on or about early to mid-December 2023 with bids due approximately 30 days later. The period of performance is 1,279 calendar days from the Notice to Proceed. The solicitation will be posted on SAM.gov and bids will be submitted to the U.S. Army Corps of Engineers, New York District.

View the file

Other files

File Type Posted
W912DS24B0002 Bid Abstract.pdf PDF
Bid Opening Results.pdf PDF
W912DS24B0002 Amend 0009.pdf PDF
W912DS24B0002 Amend 0008.pdf PDF
SSSI Area E_Amendment 8_Rev. Plans_C501.pdf PDF
Extension of Bid Opening to 4-18-2024.docx DOCX document
SSSI Area E_Amendment 7_Rev. Plans.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 35 26_GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 32 05 33_LANDSCAPE ESTABLISHMENT.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 30 00_ADMINISTRATIVE REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 7_Encroachment Photos Based On CE102.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 32 93 00_EXTERIOR PLANTS.pdf PDF
W912DS24B0002 Amend 0007.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 57 19_TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Extension of Bid Opening Date.docx DOCX document
SSSI Area E_Amendment 6_Rev. Specs 01 14 00_WORK RESTRICTIONS.pdf PDF
SSSI Area E_Amendment 6_Rev. Specs 01 45 35_SPECIAL INSPECTIONS.pdf PDF
SSSI Area E_Amendment 6_Rev. Plans.pdf PDF
Amendment 0006.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 02 61 13_EXCAVATION AND HANDLING OF CONTAMINATED MAT.pdf PDF
SSSI Area E_Amendment 5_Rev. Plans.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 33 01 30.16_TV INPECTION OF SEWER LINES.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 30 00_ADMINISTRATIVE REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 14 00_WORK RESTRICTIONS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 32 05 33_LANDSCAPE ESTABLISHMENT.pdf PDF
amendment 0005.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 50 00_TEMP CONST FAC AND CONT_OCMC TRAFFIC STIPS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 31 00 00_EARTHWORK.pdf PDF
SSSI Area E_Amendment 4_Rev. Specs 01 50 00.pdf PDF
SSSI Area E_Amendment 4_Rev. Plans.pdf PDF
Amendment 0004 SSSI.pdf PDF
W912DS24B0002-Amendment 0003.pdf PDF
SSSI Area E_Amendment 2_Rev. Specs 01 14 00.pdf PDF
SSSI Area E_Amendment 2_Rev. Specs 01 11 00.pdf PDF
SSSI Area E_Amendment 2_Rev. Plans.pdf PDF
W912DS24B0002-Amendment 0002.pdf PDF
W912DS24B0002 Amend 0001 SSSI Area E.pdf PDF
Note to Bidders re RFIs.docx DOCX document
Part B_Plans_SSSI_Area E_Civil_Dec 2023.pdf PDF
Part D_Plans_SSSI_Area E_Structural_Dec 2023.pdf PDF
Part C_Plans_SSSI_Area E_Landscape_Dec 2023.pdf PDF
Part A_Plans_SSSI_Area E_General Survey Geotech_Dec 2023.pdf PDF
PLANS.docx DOCX document
W912DS24B0002 SSSI Area E.pdf PDF
SPECS_SSSI_Area E_Final RTA_DEC 2023_Revision 2.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS24B0002

Section 00 10 00 – Solicitation W912DS24B0002, South Shore of Staten Island, Area E

To Bidders: Please use this Bid Schedule for the Bid Opening on 11 April 2024 at 2:00pm EDT.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 117 Cubic

Yard Concrete Pipe Collars

FFP

Includes concrete, stone and Graffiti Resistant Coating for pipe collars.

Quantity is ESTIMATED.

FOB: Destination

PSC CD: C219

NET AMT

0002 1,612 Cubic

Yard Concrete (Non-structural)

Includes un-reinforced concrete for forebays, scour holes, intake sumps and micropool.

0003 407 Linear

Foot

16" DIP

Includes pipe material, excavation, and pipe bedding for surface pond inlets.

AMOUNT

16" Flap Gate

Includes flap gate, excavation, and bedding for surface pond inlets.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE

0004 9 Each

0005 233 Linear

Foot

18" DIP

Includes pipe material, excavation, and pipe bedding for surface pond inlets.

18" Flap Gate

0006 6 Each

0007 322 Linear

Foot Berm Box Sewer

FFP

All work necessary to install precast box sewer including excavation piles, pile testing and materials.

4' x 2' Flap Gate

0008 8 Each

0009 158 CY

Debris Removal and Disposal

Includes removal and disposal of debris, refuse, construction waste, demolition debris, abandoned equipment, and other non-soil materials.

0010 181,281 Square

Yard Clearing, Grubbing and Removals

FFP

Includes felling, trimming, and cutting of trees and satisfactory disposal of trees and other vegetation designated for removal.

Tree Removal

Includes tree removal from 6" to above 24" DBH and disposal.

0012 297,350 Cubic

Yard Excavation

FFP

Includes all labor, materials, equipment and work for excavation, dewatering and on-site transportation of excavated materials from Ponds. This item also includes over excavation for the ponds (~1ft) and areas for phragmites removal.

0011 239 Each

0013 359,359 TON

Handling, Transportation, & Disposal of Non-Hazardous Contaminated Soil

Includes all labor, materials, equipment and work for handling, hauling and disposal of contaminated materials. All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.

Sampling & Testing of Contaminated/Potentially Hazardous Soil for Disposal Parameters

FFP

Includes all labor, materials, equipment and work for the collection and testing of soil sample sets to determine disposal parameters and appropriate handling and disposal methods.

0014 750 Set

0015 1 Job

Handling, Transportation, & Disposal of Hazardous Contaminated Soils

FFP

Includes all labor, materials, equipment and work for handling, hauling and disposal for soils determined to have hazardous concentrations of contaminants in accordance with the drawings and specifications. Contractor is to verify that the work is performed by an approved contractor.

Use of this CLIN will be based on contractor submitted results of soil sampling and testing. Payment under this CLIN will be based on contractor submitted invoices/receipts and proof of payment.

THIS BID ITEM IS NOT TO EXCEED $17,200,000.

As-Builts

AS-BUILT "Contractor shall complete the Record ("As-Builts") CAD submittal as required by Specification Section 01 78 00 CLOSEOUT SUBMITTALS for Record Drawings ("As-Builts") Requirements $200,000.00.

0016 1 Job

0017 15,500 Cubic

Yard Fill

FFP

Includes all labor, materials, equipment and work for fill and grading at the Ponds.

Trees

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

0018 2,040 Each

0019 195,200 Each

Herbaceous Plants (Plugs)

FFP

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

Shrubs

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

0020 2,415 Each

0021 147,459 Square

Yard Seeding

FFP

Includes furnished seed, seeding areas, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all seeded areas.

0022 60,427 Cubic

Yard Top Soil

FFP

Include the cost of all labor, materials and equipment necessary to prepare topsoil areas, furnish, mix, place and incorporate topsoil and compost, and all other work incidental thereto, in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

Vector and Pest Control

Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.

0024 147,459 Square

Yard Jute Mesh

FFP

Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.

0023 1 Job

Invasive Plant Removal and Treatment

The quantity to be measured for payment shall be work days for invasive plant removal and herbicide treatment. Crew (2 people).

Tree and Root Pruning

Includes completion of general tree pruning and all mobilization and incidental costs, including the disposal of wood chips.

0025 1 Job

0026 600 Each

0027 49,184 Linear

Foot Goose Exclusion Fence

FFP

Includes the total number of linear feet of fence furnished, installed, maintained and accepted in accordance with the Plans and Specifications and the directions of the Engineer.

Deer Cage

Includes the cost to furnish all materials, labor, and equipment necessary to install the deer fence specified herein as required by the Engineer.

0028 4,455 Each

0029 11,406 Linear

Foot Construction Limit Fence

FFP

The quantity to be measured for payment shall be the total number of linear feet of construction limit fence furnished, installed and maintained in accordance with the Plans and Specifications and the directions of the Engineer.

0030 14,282 Square

Yard Slope Stabilization Mat

FFP

Includes per square yard of slope stabilization mat installed shall constitute full compensation for all labor, material, and equipment and incidental expenses necessary to complete the work as shown on the contract drawings and in accordance with the specifications to the satisfaction of the Engineer.

Tree Guard

Includes the cost for all labor, materials and equipment required for installation of temporary wooden tree guards.

SWPPP Permit Compliance

Includes material for, installation of, and maintenance of: sediment traps, stabilized construction entrances, silt fences, dirtbags, portable sediment tanks, and other temporary erosion and sediment controls; as required for SWPP permit compliance.

0031 277 Each

0032 1 Job

0033 1 Job

Not Available

This CLIN is not available.

0034 8,961 Linear

Foot Black Chain Link Fence

FFP

Includes linear feet furnished and installed in accordance with the plans, specifications and directions of the Engineer.

Permanent Signs on Steel Rail Posts

The quantity of 0.080" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed on steel posts or delivered in accordance with the plans, specifications and directions of the Engineer.

0.020" Temporary Signs

The quantity of 0.020" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed at the designated locations or delivered to DEP, in accordance with the plans, specifications and directions of the Engineer.

0035 60 Each

0036 72 Each

0037 10,779 Square

Foot Permanent Maintenance Accessway (Pavers)

FFP

Includes installation and materials (concrete pavers, geotextile, gravel, sand and topsoil) for 12' wide accessways and weir chamber accessway.

0038 55,108 Square

Foot Permanent Maintenance Accessway (Gravel)

FFP

Includes installation and materials (geotextile, gravel, sand and topsoil) for 6', 10' and 12' wide accessways and gravel berms, compacted earth fill for accessway berms is covered under Bid Item 17.

Survey Monuments

Includes unit price per survey monument, and shall include the cost of all labor, materials, equipment, and all work incidental thereto, necessary to complete this item in accordance with the plans and specifications and to the satisfaction of the Engineer.

Fence Swing Gate

Includes fabricating and installing swing gate and posts, furnishing modified Lock, and fabricating and furnishing steel plate lock cover in accordance with the plans, specifications and directions of the Engineer, the Contractor shall receive the unit price bid.

0039 86 Each

0040 13 Each

0041 1,652 Square

Yard Reno Mattress

FFP

Includes all excavation, grading and geotextile fabric necessary to install the total square yards of reno mattress as directed by the Engineer.

0042 1 Job

Quintard Street Structures

FFP

All work necessary to construct Headwall #1, Box Sewer #1 & #2, Weir Chamber # 1 and Junction Chamber # 1 & 2 at Quintard Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Sand Lane North Structures

All work necessary to construct Headwall #2, Box Sewer #3, and Junction Chamber # 3 at Sand Lane and Quincy Ave, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Sand Lane South Structures

All work necessary to construct Weir Chamber #2, Box Sewer #4 & 6, and Junction Chamber # 4, 8 & 9 at Sand Lane and Father Capodanno Blvd., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

0043 1 Job

0044 1 Job

Pearsall Street Structures

All work necessary to construct Headwall #3, Box Sewer #5 and Junction Chamber # 5 & 7 at Pearsall St., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Mallory Avenue - Storm Network

All work necessary to install storm sewer network along Mallory Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP and 24” RCP, piles, pile testing, flap gate, catch basin, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0045 1 Job

0046 1 Job

McLaughlin St North - Storm Network

All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, flap gate, manholes excavation, dewatering, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

McLaughlin St South - Storm Network

All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24" RCP, piles, pile testing, flap gate, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0047 1 Job

0048 1 Job

Wentworth Avenue - Storm Network

All work necessary to install storm sewer network along Wentworth Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, pile testing, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract

Orlando Street - Storm Network FFP

All work necessary to install storm sewer network at the end of Orlando Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 4’-0” W X 2’-0” H RCP, piles, pile testing, flap gate and MPT in accordance with the Contract

0049 1 Job

0050 1 Job

Oceanside Avenue - Storm Network

All work necessary to install storm sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications

Agnes Place - Storm Network

All work necessary to install storm sewer network along Agnes Place, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0051 1 Job

0052 1 Job

Andrew Street - Storm Network

All work necessary to install storm sewer network along Andrew Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, Junction Chamber #6, 38"W X 24"H Elliptical RCP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

Vulcan Street - Storm Network

All work necessary to install storm sewer network along Vulcan St, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18" ESVP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the

0053 1 Job

0054 1 Job

Lansing Avenue - Sanitary Network

All work necessary to install sanitary sewer network along Lansing Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

Oceanside Avenue & Quintard Street Sanitary Network

FFP

All work necessary to install sanitary sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 30” RCP, 24” RCP, 18” ESVP, piles, pile testing, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0055 1 Job

0056 1 Job

Sand Lane North - Sanitary Network

All work necessary to install sanitary sewer network along Sand Lane North, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 8” ESVP, piles, pile testing, manhole, utility removal, pavement restoration and MPT in accordance with the

0058 11,431 Linear

Foot Television Inspection of Sewer

FFP

All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually inspected to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes. CCTV Inspection for pre and post sewer installation.

0057 1 Job

0059 11,431 Linear

Foot Sewer Cleaning

FFP

All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually cleaned of loose debris, grease, oil, and silt to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes.

0060 600 Linear

Foot 8" Water Main

FFP

All work necessary to install water main hydrants, 6” hydrant valves, 6” DIP Class 56 hydrant connections, and 8”x6” 3-way connections including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, vaults, fittings, utility removal, pipe bedding, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0061 450 Linear

Foot 20" Water Main

FFP

All work necessary to install water main hydrants, 6” hydrant valves, 6” DIP Class 56 hydrant connections, and 20”x6” 3-way connections including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, vaults, fittings, utility removal, pipe bedding, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0062 34 Linear

Foot 12" Water Main

FFP

All work necessary to install water main hydrants, 6” hydrant valves, 6” DIP Class 56 hydrant connections, and 12”x6” 3-way connections including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, vaults, fittings, utility removal, pipe bedding, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0063 1 Job

Supplies/Service

All other costs to complete the work in accordance with the contract drawings and specifications, which are not captured in a specific line item above, including but not limited to general conditions, mobilization/demobilization, bond, etc.

0064 21,139 TON

Handling, Transportation and Disposal of PCB Contaminated Soil

Includes all labor, materials, equipment and work for handling, hauling and disposal of PCB contaminated materials. All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.

0065 3,600 SY

Bank Stabilization

Includes all labor, materials, equipment and work for installation of bank stabilization.

0066 1 JOB

OPTION – Landscape Construction Maintenance

Includes all maintenance for landscape establishment and exterior plants after acceptance of all work by the Contracting Officer in accordance with the contract drawings and specifications. An additional 730 calendar days will be added to the contract period of performance for maintenance work to be performed under this CLIN only. This additional time will NOT increase the period of performance to complete work performed under any other CLIN. Separate contract milestones will be established for Construction Completion and Landscape Maintenance Completion under Specification Section 01 30 00. This option may be exercised at any time during the base contract period of performance.

0067 1 JOB

OPTION – Additional Insurance

Additional Insurance in accordance with Specifications Section 01 30 00 paragraph 1.5.1

Section 00 20 00 - Instructions for Procurement

TOTALS

TOTALS:

CLIN 0001

CLIN 0002 $

CLIN 0003 $

CLIN 0004 $

CLIN 0005 $

CLIN 0006 $

CLIN 0007 $

CLIN 0008 $

CLIN 0009 $

CLIN 0010 $

CLIN 0011 $

CLIN 0012 $

CLIN 0013 $

CLIN 0014 $

CLIN 0015 $ 17,200,000.00

CLIN 0016 $ 200,000.00

CLIN 0017 $

CLIN 0018 $

CLIN 0019 $

CLIN 0020 $

CLIN 0021 $

CLIN 0022 $

CLIN 0023 $

CLIN 0024 $

CLIN 0025 $

CLIN 0026 $

CLIN 0027 $

CLIN 0028 $

CLIN 0029 $

CLIN 0030 $

CLIN 0031 $

CLIN 0032 $

CLIN 0033 $ Not Available

CLIN 0034 $

CLIN 0035 $

CLIN 0036 $

CLIN 0037 $

CLIN 0038 $

CLIN 0039 $

CLIN 0040 $

CLIN 0041 $

CLIN 0042 $

CLIN 0043 $

CLIN 0044 $

CLIN 0045 $

CLIN 0046 $

CLIN 0047 $

CLIN 0048 $

CLIN 0049 $

CLIN 0050 $

CLIN 0051 $

CLIN 0052 $

CLIN 0053 $

CLIN 0054 $

CLIN 0055 $

CLIN 0056 $

CLIN 0057 $

CLIN 0058 $

CLIN 0059 $

CLIN 0060 $

CLIN 0061 $

CLIN 0062 $

CLIN 0063 $

CLIN 0064 $

CLIN 0065 $

CLIN 0066 $

CLIN 0067 $

TOTAL CLINs 0001-0067