About this file

This document provides details regarding Amendment 0005 to the solicitation for the South Shore of Staten Island, Area E, New York, Hurricane Sandy Coastal Storm Risk Management Project. The amendment pertains to a construction contract for interior drainage improvements on Staten Island, including large detention basins connected by an open channel culvert, various stormwater drainage structures, and relocation of existing sanitary sewers. The work is to be completed on a firm-fixed price basis through an unrestricted invitation for bids solicited by the U.S. Army Corps of Engineers, New York District. The solicitation is anticipated to be issued in mid-December 2023 with bids due approximately 30 days later. The period of performance is 1,279 calendar days from notice to proceed. The magnitude of construction cost is estimated between $100 million to $175 million.

View the file

Other files

File Type Posted
W912DS24B0002 Bid Abstract.pdf PDF
Bid Opening Results.pdf PDF
W912DS24B0002 Amend 0009.pdf PDF
W912DS24B0002 Amend 0008.pdf PDF
SSSI Area E_Amendment 8_Rev. Plans_C501.pdf PDF
Extension of Bid Opening to 4-18-2024.docx DOCX document
SSSI Area E_Amendment 7_Rev. Plans.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 35 26_GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 32 05 33_LANDSCAPE ESTABLISHMENT.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 30 00_ADMINISTRATIVE REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 7_Encroachment Photos Based On CE102.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 32 93 00_EXTERIOR PLANTS.pdf PDF
Bid Schedule - Amend 0007.pdf PDF
W912DS24B0002 Amend 0007.pdf PDF
SSSI Area E_Amendment 7_Rev. Specs 01 57 19_TEMPORARY ENVIRONMENTAL CONTROLS.pdf PDF
Extension of Bid Opening Date.docx DOCX document
SSSI Area E_Amendment 6_Rev. Specs 01 14 00_WORK RESTRICTIONS.pdf PDF
SSSI Area E_Amendment 6_Rev. Specs 01 45 35_SPECIAL INSPECTIONS.pdf PDF
SSSI Area E_Amendment 6_Rev. Plans.pdf PDF
Amendment 0006.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 02 61 13_EXCAVATION AND HANDLING OF CONTAMINATED MAT.pdf PDF
SSSI Area E_Amendment 5_Rev. Plans.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 33 01 30.16_TV INPECTION OF SEWER LINES.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 30 00_ADMINISTRATIVE REQUIREMENTS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 14 00_WORK RESTRICTIONS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 32 05 33_LANDSCAPE ESTABLISHMENT.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 01 50 00_TEMP CONST FAC AND CONT_OCMC TRAFFIC STIPS.pdf PDF
SSSI Area E_Amendment 5_Rev. Specs 31 00 00_EARTHWORK.pdf PDF
SSSI Area E_Amendment 4_Rev. Specs 01 50 00.pdf PDF
SSSI Area E_Amendment 4_Rev. Plans.pdf PDF
Amendment 0004 SSSI.pdf PDF
W912DS24B0002-Amendment 0003.pdf PDF
SSSI Area E_Amendment 2_Rev. Specs 01 14 00.pdf PDF
SSSI Area E_Amendment 2_Rev. Specs 01 11 00.pdf PDF
SSSI Area E_Amendment 2_Rev. Plans.pdf PDF
W912DS24B0002-Amendment 0002.pdf PDF
W912DS24B0002 Amend 0001 SSSI Area E.pdf PDF
Note to Bidders re RFIs.docx DOCX document
Part B_Plans_SSSI_Area E_Civil_Dec 2023.pdf PDF
Part D_Plans_SSSI_Area E_Structural_Dec 2023.pdf PDF
Part C_Plans_SSSI_Area E_Landscape_Dec 2023.pdf PDF
Part A_Plans_SSSI_Area E_General Survey Geotech_Dec 2023.pdf PDF
PLANS.docx DOCX document
W912DS24B0002 SSSI Area E.pdf PDF
SPECS_SSSI_Area E_Final RTA_DEC 2023_Revision 2.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Revise and reissue bid scheudle Answ er Questions from prospective bidders for informational purposes only Revise and Reissue plans specs and draw ings Extend Bid due date to 14 March 2024 at 2:00 P.M. EST The Government may but is not obligated to respond to RFIs sent by contractors after 15 February 2024, 11:59pm EST NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below .FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THELATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF

BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 53

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0002

X 9B. DATED (SEE ITEM 11)

22-Dec-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Feb-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE AMOUNT

0001 117 Cubic Yard

Concrete Pipe Collars FFP Includes concrete, stone and Graffiti Resistant Coating for pipe collars.

Quantity is

ESTIMATED.

FOB: Destination

PSC CD: C219

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE AMOUNT 0002 1,612 Cubic

Yard Concrete (Non-structural) FFP Includes un-reinforced concrete for forebays, scour holes, intake sumps and micropool.

Quantity is ESTIMATED.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 407 Linear

Foot

16" DIP FFP

Includes pipe material, excavation, and pipe bedding for surface pond inlets.

AMOUNT

16" Flap Gate FFP Includes flap gate, excavation, and bedding for surface pond inlets.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE

0004 9 Each

0005 233 Linear

Foot

18" DIP FFP

Includes pipe material, excavation, and pipe bedding for surface pond inlets.

18" Flap Gate FFP

0006 6 Each

0007 328 Linear

Foot Berm Box Sewer

FFP

All work necessary to install precast box sewer including excavation, and materials.

4' x 2' Flap Gate

FFP

0008 8 Each

0009 158 TON

Debris Removal and Disposal

Includes removal and disposal of debris, refuse, construction waste, demolition debris, abandoned equipment, and other non-soil materials.

0010 181,281 Square

Yard Clearing, Grubbing and Removals

FFP

Includes felling, trimming, and cutting of trees and satisfactory disposal of trees and other vegetation designated for removal.

Tree Removal

Includes tree removal from 6" to above 24" DBH and disposal.

0012 297,350 Cubic

Yard Excavation

FFP

Includes all labor, materials, equipment and work for excavation, dewatering and on-site transportation of excavated materials from Ponds. This item also includes over excavation for the ponds (~1ft) and areas for phragmites removal.

0011 239 Each

0013 359,359

Handling, Transportation, & Disposal

FFP

Handling, Transportation, & Disposal of Non-Hazardous Contaminated Soil.

Includes all labor, materials, equipment and work for handling, hauling and disposal of contaminated materials. All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.

Sampling & Testing

Sampling & Testing of Contaminated/Potentially Hazardous Soil for Disposal Parameters

Includes all labor, materials, equipment and work for the collection and testing of soil sample sets to determine disposal parameters and appropriate handling and disposal methods.

0014 750 Set

W912DS24B000

0015 42,278

Handling, Transportation, & Disposal

FFP

Handling, Transportation, & Disposal of Hazardous Contaminated Soils.

Includes all labor, materials, equipment and work for handling, hauling and disposal for soils determined to have hazardous concentrations of contaminants.

This item applies only for material excavated from ponds that is determined to be hazardous by testing results. For bidding purposes, assume 10% of all material excavated from ponds is hazardous.

As-Builts

AS-BUILT "Contractor shall complete the Record ("As-Builts") CAD submittal as required by Specification Section 01 78 00 CLOSEOUT SUBMITTALS for Record Drawings ("As-Builts") Requirements $100,000.00.

$100,000.00

0016 1 Job

0017 15,500 Cubic

Yard Fill

FFP

Includes all labor, materials, equipment and work for fill and grading at the Ponds.

Trees

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

0018 2,037 Each

0019 195,200 Each

Herbaceous Plants (Plugs)

FFP

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

Shrubs

Includes all excavation and preparation of planting pits and beds, adding soil amendments, furnishing plants, digging, inspecting, planting, pruning, staking, guying, anchoring, wrapping, mulching, fertilizing, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all plant material and seeded areas. The price bid shall also include the costs of all rough and fine grading, all specified soils necessary and required for the satisfactory completion of all landscaping work and all other work incidental thereto in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

0020 2,413 Each

0021 147,459 Square

Yard Seeding

FFP

Includes furnished seed, seeding areas, liming, discing, raking, tilling, harrowing, mowing, material, watering and maintaining all seeded areas.

0022 60,427 Cubic

Yard Top Soil

FFP

Include the cost of all labor, materials and equipment necessary to prepare topsoil areas, furnish, mix, place and incorporate topsoil and compost, and all other work incidental thereto, in accordance with the plans and specifications to the satisfaction of the Contracting Officer.

Vector and Pest Control

Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.

0024 147,459 Square

Yard Jute Mesh

FFP

Includes the cost for all labor, materials, equipment and incidental expenses necessary or required to complete the work in accordance with the plans and specifications to the satisfaction of the Engineer.

0023 1 Job

Invasive Plant Removal and Treatment

The quantity to be measured for payment shall be work days for invasive plant removal and herbicide treatment. Crew (2 people).

Tree and Root Pruning

Includes completion of general tree pruning and all mobilization and incidental costs, including the disposal of wood chips.

0025 1 Job

0026 600 Each

0027 49,184 Linear

Foot Goose Exclusion Fence

FFP

Includes the total number of linear feet of fence furnished, installed, maintained and accepted in accordance with the Plans and Specifications and the directions of the Engineer.

Deer Cage

Includes the cost to furnish all materials, labor, and equipment necessary to install the deer fence specified herein as required by the Engineer.

0028 2,832 Each

0029 11,406 Linear

Foot Construction Limit Fence

FFP

The quantity to be measured for payment shall be the total number of linear feet of construction limit fence furnished, installed and maintained in accordance with the Plans and Specifications and the directions of the Engineer.

0030 14,282 Square

Yard Slope Stabilization Mat

FFP

Includes per square foot of slope stabilization mat installed shall constitute full compensation for all labor, material, and equipment and incidental expenses necessary to complete the work as shown on the contract drawings and in accordance with the specifications to the satisfaction of the Engineer.

Tree Guard

Includes the cost for all labor, materials and equipment required for installation of temporary wooden tree guards.

SWPPP Permit Compliance

Includes material for, installation of, and maintenance of: sediment traps, stabilized construction entrances, silt fences, dirtbags, portable sediment tanks, and other temporary erosion and sediment controls; as required for SWPP permit compliance.

0031 277 Each

0032 1 Job

Not Available

FFP

This CLIN is not available.

N/A

0034 8,961 Linear

Foot Black Chain Link Fence

FFP

Includes linear feet furnished and installed in accordance with the plans, specifications and directions of the Engineer.

Permanent Signs on Steel Rail Posts

The quantity of 0.080" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed on steel posts or delivered in accordance with the plans, specifications and directions of the Engineer.

0.020" Temporary Signs

The quantity of 0.020" Gauge Aluminum Signs to be paid for under this item must be the total number of signs, fabricated and installed at the designated locations or delivered to DEP, in accordance with the plans, specifications and directions of the Engineer.

0035 60 Each

0036 72 Each

0037 10,779 Square

Foot Pavers

FFP

Permanent Maintenance Accessway (Pavers).

Includes installation and materials (concrete pavers, geotextile, gravel, sand and topsoil) for 12' wide accessways and weir chamber accessway.

0038 55,108 Square

Foot Gravel

FFP

Permanent Maintenance Accessway (Gravel)

Includes installation and materials (geotextile, gravel, sand and topsoil) for 6', 10' and 12' wide accessways.

Survey Monuments

Includes unit price per survey monument, and shall include the cost of all labor, materials, equipment, and all work incidental thereto, necessary to complete this item in accordance with the plans and specifications and to the satisfaction of the Engineer.

Fence Swing Gate

Includes fabricating and installing swing gate and posts, furnishing modified Lock, and fabricating and furnishing steel plate lock cover in accordance with the plans, specifications and directions of the Engineer, the Contractor shall receive the unit price bid.

0039 86 Each

0040 13 Each

0041 1,652 Square

Yard Reno Mattress

FFP

Includes all excavation, grading and geotextile fabric necessary to install the total square yards of reno mattress as directed by the Engineer.

0042 1 Job

Quintard Street Structures

FFP

All work necessary to construct Headwall #1, Box Sewer #1 & #2, Weir Chamber # 1 and Junction Chamber # 1 & 2 at Quintard Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Sand Lane North Structures

All work necessary to construct Headwall #2, Box Sewer #3, and Junction Chamber # 3 at Sand Lane and Quincy Ave, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Sand Lane South Structures

All work necessary to construct Weir Chamber #2, Box Sewer #4 & 6, and Junction Chamber # 4, 8 & 9 at Sand Lane and Father Capodanno Blvd., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

0043 1 Job

0044 1 Job

Pearsall Street Structures

All work necessary to construct Headwall #3, Box Sewer #5, 8" Water Main and Junction Chamber # 5 & 7 at Pearsall St., including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, sheeting and bracing, structural concrete, foundation construction, piles, pile testing, crushed stone, stone facing, pipe fittings, flap gate, sidewalk restoration, pavement demolition and replacement, and maintenance and protection of traffic (MPT) in accordance with the Contract Drawings and Specifications.

Mallory Avenue - Storm Network

All work necessary to install storm sewer network along Mallory Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” RCP and 24” RCP, piles, pile testing, flap gate, catch basin, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0045 1 Job

0046 1 Job

McLaughlin St North - Storm Network

All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, flap gate, manholes excavation, dewatering, pavement restoration and MPT in

McLaughlin St South - Storm Network

All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24" RCP, piles, pile testing, flap gate, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0047 1 Job

0048 1 Job

Wentworth Avenue - Storm Network

All work necessary to install storm sewer network along Wentworth Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, pile testing, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract

Orlando Avenue - Storm Network

All work necessary to install storm sewer network at the end of Orlando Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 4’-0” W X 2’-0” H RCP, piles, pile testing, flap gate and MPT in accordance with the Contract

0049 1 Job

0050 1 Job

Oceanside Avenue - Storm Network

All work necessary to install storm sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, flap gate, catch basins, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications

Agnes Place - Storm Network

All work necessary to install storm sewer network along Agnes Place, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24” RCP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

0051 1 Job

0052 1 Job

Andrew Street - Storm Network

All work necessary to install storm sewer network along Andrew Street, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, Junction Chamber #6, 38"W X 24"H Elliptical RCP, 15” RCP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in

Vulcan Street - Storm Network

All work necessary to install storm sewer network along Vulcan St, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18" ESVP, piles, pile testing, flap gate, catch basin, manhole, pavement restoration and MPT in accordance with the

0053 1 Job

0054 1 Job

Lansing Avenue - Sanitary Network

All work necessary to install sanitary sewer network along Lansing Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 18” ESVP, piles, pile testing, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.

Oceanside Avenue & Quintard Street Sanitary Network

FFP

All work necessary to install sanitary sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 30” RCP, 24” RCP, piles, pile testing, manhole, existing utility removal, pavement restoration and MPT in

0055 1 Job

0056 1 Job

Sand Lane North - Sanitary Network

All work necessary to install sanitary sewer network along Sand Lane North, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 8” ESVP, piles, pile testing, manhole, utility removal, pavement restoration and MPT in accordance with the

0058 11,431 Linear

Foot Television Inspection of Sewer

FFP

All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually inspected to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes. CCTV Inspection for pre and post sewer installation.

0057 1 Job

0059 11,431 Linear

Foot Sewer Cleaning

FFP

All labor, materials, equipment, and work necessary for the number of linear feet of existing sewers (regardless of the sizes) actually cleaned of loose debris, grease, oil, and silt to the satisfaction of the Contracting Office, measured along the centerline of the sewer through the manholes.

0060 600 Linear

Foot 8" Water Main

FFP

All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement restoration and MPT in accordance with the Contract

0061 450 Linear

Foot 20" Water Main

FFP

All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement

0062 34 Linear

Foot 12" Water Main

FFP

All work necessary to install water main including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, pipe material, valves, hydrants, 6” DIP Class 56 hydrant connections, fittings, utility removal, pipe bedding pavement

0063 1 Job

Supplies/Service

All other costs to complete the work in accordance with the contract drawings and specifications, which are not captured in a specific line item above, including but not limited to general conditions, mobilization/demobilization, bond, etc.

0064 21,139 TON

Handling, Transportation and Disposal of PCB Contaminated Soil

FFP

Includes all labor, materials, equipment and work for handling, hauling and disposal of PCB contaminated materials. All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.

0065 3,600 SY

Bank Stabilization

FFP

Includes all labor, materials, equipment and work for installation of bank stabilization.

Section 00 20 00 - Instructions for Procurement

TOTALS

TOTALS:

CLIN 0001

CLIN 0002 $

CLIN 0003 $

CLIN 0004 $

CLIN 0005 $

CLIN 0006 $

CLIN 0007 $

CLIN 0008 $

CLIN 0009 $

CLIN 0010 $

CLIN 0011 $

CLIN 0012 $

CLIN 0013 $

CLIN 0014 $

CLIN 0015 $

CLIN 0016 $ 100,000.00

CLIN 0017 $

CLIN 0018 $

CLIN 0019 $

CLIN 0020 $

CLIN 0021 $

CLIN 0022 $

CLIN 0023 $

CLIN 0024 $

CLIN 0025 $

CLIN 0026 $

CLIN 0027 $

CLIN 0028 $

CLIN 0029 $

CLIN 0030 $

CLIN 0031 $

CLIN 0032 $

CLIN 0033 $ Not Available

CLIN 0034 $

CLIN 0035 $

CLIN 0036 $

CLIN 0037 $

CLIN 0038 $

CLIN 0039 $

CLIN 0040 $

CLIN 0041 $

CLIN 0042 $

CLIN 0043 $

CLIN 0044 $

CLIN 0045 $

CLIN 0046 $

CLIN 0047 $

CLIN 0048 $

CLIN 0049 $

CLIN 0050 $

CLIN 0051 $

CLIN 0052 $

CLIN 0053 $

CLIN 0054 $

CLIN 0055 $

CLIN 0056 $

CLIN 0057 $

CLIN 0058 $

CLIN 0059 $

CLIN 0060 $

CLIN 0061 $

CLIN 0062 $

CLIN 0063 $

CLIN 0064 $

CLIN 0065 $

TOTAL CLINs 0001-0065

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

a. CG203, CT001, CP101, CU101, CU102, CU106, CU107, CU108, CU109, CU110, CU112, CU113, CU114, CU115, CU116, CU117, CU118, C502, C504, S-001, S-002, S-112, S-113, S-114, S-115, S-116, S-117, S-121, S-122, S-204, S-302, S-303, S-305, S-307, S-308, S-309, S-310, S-312, S-313, S-314, S-315, S-316, S-317, S-504

2. The following DRAWINGS have been REVISED but NOT REISSUED:

a. None.

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

a. None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

a. Sections 01 14 00; 01 30 00; 01 50 00; 02 61 13; 31 00 00; 32 05 33; 33 01 30.16

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

BIDDER’S QUESTIONS AND GOVERNMENT REPLY:

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).

Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)

Bidder Inquiry 01: There are no corresponding bid items for the following work:

b. the proposed Sanitary Sewer along Quincy Ave. as shown on plan sheet CU117.

Please clarify where this work item are to be paid. Additionally, Bid Item 57 is for Sand Lane North - Sanitary Network, however there are no plans labeled with and/or showing proposed Sanitary Sewer on Sand Lane. Please clarify.

Government Response: The Quincy Avenue sanitary sewer is covered under Bid Item 57. The names Quincy Avenue and Sand Lane North are used interchangeably in this contract to describe the structures at that location.

Bidder Inquiry 02: The Proposal description for Bid Item No. 56 Oceanside Avenue - Sanitary Network mentions 30” DIP, however, there is no 30” DIP on utility plan Sheet CU116 for this street. Please clarify.

Government Response: Bid Item 56 has been revised as of Amendment 2 to change the 30” pipe material to RCP.

Bidder Inquiry 03: Please confirm that the proposed Storm Sewer catch basins, manholes, 42” RCP and 18” VCP along Father Capodanno Blvd. as shown on plan sheet CU112 is to be paid for under Bid Item No. 44 Sand Lane South Structures.

Government Response: Correct, Bid Item 44 covers this work.

Bidder Inquiry 04: The Proposal description for Bid Item No. 45 Pearsall Street Structures says to include 8” Water Main, however, Bid Item 60 includes payment for the 8” Water Main. Please clarify where this work is to be paid.

Government Response: The 8” water main located near the Pearsall Street structures will be paid under Bid Item 60. The Bid Schedule has been updated to clarify that all 8” Water Mains are covered in Bid Item 60.

Bidder Inquiry 05: Detail J1 on plan Sheet CP101 references a Steel Guide Rail detail on plan Sheet C506, however there is no detail for guide rail on this page. Please provide.

Government Response: CP101 has been revised to reference the NYC Parks and Recreation Standard Details, Detail 38 Steel Guide Rail / Bollard Details.

Bidder Inquiry 06: The structural plans provide details for both construction and expansion joints. However, the plans do not show or provide locations for any vertical joints that may be required at the chamber and headwall structures. Horizontal joints are shown but not vertical. Please advise where vertical joints are required.

Government Response: Per Note C-10 on Drawing S-001, the locations of construction joints not shown on the structural plans must be submitted for approval by the Contracting Officer.

Bidder Inquiry 07: The foundation notes on the structural plans state that piles are to develop a minimum compressive load of 20 tons per pile. However, the “Production Pile Acceptance Criteria” section of the specifications for Steel H-Piles, Timber Piles and Auger CIP Piles, respectively, state “Safe design capacity for piles is 40 kips. Drive piles to minimum tip elevation indicated on the contract drawings, and to such additional depth as required to obtain a bearing capacity of not less than 40 kips.” Please clarify the required compressive capacities for the various piles and provide additional contract pay items for each pile type, in order to pay contractors for any additional vertical pile footage beyond those elevations established in the plans for bidding purposes.

Government Response: The required compressive capacity is not less than 40 kips allowable. 40 kips is equal to 20 tons-force.

Bidder Inquiry 08: The foundation notes on the structural plans state that piles are to be load tested in accordance with the specifications at each structure and that test piles are to be spread uniformly around the footprint of each structure. According to the specifications, dynamic, static and lateral load tests are required to be performed on 5% of the Steel H-Piles, Timber Piles and Auger CIP Piles, respectively. In reference to the above:

a. It is unclear whether the various pile tests are to be performed on production or sacrificial piles. Both static and lateral pile load tests are typically performed on sacrificial piles, while dynamic load tests can be performed on either sacrificial or production piles. Please clarify.

b. Considering only the headwall, weir and junction chamber structures require testing per the foundation notes, excluding the box sewers. If 5% of the piles for these structures are tested, this would require approximately (27) Dynamic Load Tests, (58) Static Load Tests and (58) Lateral Load Tests. If 5% of the piles for box sewers 1-6 require testing, this would add approximately (9) Dynamic Load Tests, (31) Static Load Tests and (31) Lateral Load Tests. Please clarify the intent of the contract documents for each individual test type and whether all these test types are in fact required for the various pile types. Also, please clarify and confirm required pile load testing locations and quantities.

c. In consideration of the above and to provide further clarity, we respectfully request that the USACE provide individual contract pay items with quantities for each test type, which will eliminate confusion and maintain balanced bids between contractors as well as provide a means of payment for additional testing that may be required by the contracting officer as indicated in the specs.

Government Response:

A) Test piles are to be located throughout the footprint of the structure and test piles that meet the requirements of the project may be incorporated into the work. See Specification Sections 31 62 19 and 31 62 16.16, paragraphs 1.1 and paragraph 1.4.1, and Section 31 63 16, paragraph 1.1.

B) There are no notes excluding box sewers from pile testing, so pile testing is required for those structures, as per Note F-3 on S-001. Per 2022 NYC BC Section 1810.4, static and lateral tests are required. Dynamic tests can be performed to reduce the number of sacrificial piles. 5% of the piles tested is the minimum per USACE Standards.

C) Quantities for each test type will be covered under the respective bid item for each structure, pipe, or sewer. The Bit Item descriptions have been updated to include the cost of pile testing.

Bidder Inquiry 09: The structural plan sections and details (A1 S-504) for the junction chamber structures do not provide the wall dowel bar size required at each structure. Please provide wall dowel bar sizing accordingly.

Government Response: Structural plans have been revised to provide wall dowel bar sizes.

Bidder Inquiry 10: Most of the box sewer lengths provided on plan page S-314 and S-315 differ from the lengths scaled and shown on the utility plans. Please advise which is correct.

Government Response: Box sewer lengths have been updated on the structural and utility plans.

Bidder Inquiry 11: The structural plans do not identify transverse expansion or contraction joint locations or requirements for the box sewer. Please provide information on the joint spacing or provide location on the plans accordingly.

Government Response: Notes have been added to the structural plans addressing the locations, spacing, and requirements of transverse expansion joints and contraction joints.

Bidder Inquiry 12: Detail A12 on plan page S-104 shows an access manhole for Box Sewer No. 3. However, the plan and profile for Box Sewer No. 3 on plan page CU110 does not call out or show an access manhole. Please provide locations and/or confirm if one is required.

Government Response: An access manhole on Box Sewer No. 3 has been added to the plans.

Bidder Inquiry 13: Detail B15 on plan page S-112 shows an access manhole for Box Sewer No. 6. However, the plan and profile for Box Sewer No. 6 on plan page CU112 does not call out or show an access manhole. Please provide locations and/or confirm if one is required.

Government Response: An access manhole on Box Sewer No. 6 has been added to the plans.

Bidder Inquiry 14: Record drawings of the existing tide gate chamber are referenced on plan page S-116 & S-309.

Please provide the appropriate record drawings so that bidders can make the necessary evaluations for the connection between the proposed junction chamber #4 and the existing tide gate chamber.

Government Response: It is the Contractor’s responsibility to obtain As-Builts. All tide gate chamber details shown in plans shall be utilize.

Bidder Inquiry 15: If contractors choose the precast alternate for Box Sewer No. 5, will the USACE allow the proposed manhole structure, as shown on plan pages CU102 & S-119, to be an integral part of the precast box sewer or will a separate structure be required? Please note that Box Sewers No. 3 & 6 have details for access manhole openings thru the roof of the box sewer. Please advise and or provide an alternate detail for clarification.

Government Response: If the precast alternative for Box Sewer No. 5 is used the proposed manhole can be integrated into the structure. Plan sheet S-313 has been revised to show the sections of the manhole structure with the precast alternative. For Box Sewers No. 3 & 6, access manholes have been added to the plan sheets.

Bidder Inquiry 16: Plan pages S-122 and S-317 provide details for a berm box sewer (4’ x 2’). The civil plans do not call out or describe berm box sewers on any of these plan pages other than those previously mentioned in the structural plans. Please provide location(s) for this berm box sewer as well as specific lengths and pile table(s).

Government Response: Berm Box Sewer (4’ x 2’) corresponds to the 4’-0” W x 2’-0” H Storm Sewers shown on CU114. S-122 and S-317 have been updated in Amendment 2 to show the box sewer lengths and pile information.

Bidder Inquiry 17: Please provide profiles for the proposed Catch Basins Type 1 & 2 as shown on plan sheet

CU107.

Government Response: The inverts in and out have been provided for the catch basins and pipes to convey the pipe construction without needing the profiles.

Bidder Inquiry 18: Plan Sheet CU107 shows 38” W x 24” H Elliptical RCP from Sta. 0+00 to Sta. 2+00 says on Timber Piles in plan view and CFA piles in profile view. Please clarify the type of piles required for this pipe run.

Government Response: Plan sheet CU107 has been updated to show the same pile type, CFA, on the plan and profile for the 38” x 24” Elliptical RCP from Sta. 0+00 to Sta. 2+00.

Bidder Inquiry 19: Please provide a profile for the proposed Catch Basin Type 1 on Wentworth Ave. as shown on plan sheet CU108.

Government Response: Inverts in and out have been provided for the catch basins and pipes to convey the pipe construction without needing the profiles.

Bidder Inquiry 20: Please provide profiles for the two proposed Catch Basins Type 1 on Oceanside Ave. as shown on plan sheet CU109.

Government Response: Inverts in and out have been provided for the catch basins and pipes to convey the

Bidder Inquiry 21: Please provide profiles for the proposed Catch Basin Type 1 and Manhole Type A-3 that connect to proposed Junction Chamber No.4 on Father Capodanno Blvd. as shown on plan sheet CU112.

Government Response: Inverts in and out have been provided for the catch basins and pipes to convey the

Bidder Inquiry 22: The description for Bid Item 13 Disposal of Non-Hazardous Contaminated Soil states that “All material excavated from ponds shall be considered contaminated, non-hazardous material until proven otherwise by testing and sampling results.” However, the description for Bid Item 15 Disposal of Hazardous Contaminated Soils says, “For bidding purposes, assume 10% of all material excavated from ponds is hazardous.” Therefore, is the approximate total estimated pond excavation/disposal the sum of bid items 13 & 15 totaling 422,776 TONS? In addition, if any portion of the estimated quantity of hazardous soil in item 14 is found not to be hazardous, please confirm payment will be made under bid item 13. Please clarify.

Government Response: The sum of Bid Items 13, 15, and 64 is 422,776 tons, corresponding to 281,850 CY at a unit weight of 1.5 Tons/CY. 281,850 CY is the total estimated excavation of 297,350 CY minus the estimated fill of 15,500 CY. Actual quantities will depend on test results, and any soil found to be non-hazardous will be paid for under Item 13 or 64 if PCB-contaminated.

Bidder Inquiry 23: In order to determine the extent of work for the demolition and construction of the new storm structures and box sewers at, but not limited to, the Quintard St (north & south) and Sand Lane (north & south) locations, we request that all as-built drawings be provided accordingly for the existing storm sewer structures and culvert systems which are to be demolished and removed.

Government Response: It is the Contractor’s responsibility to obtain As-Builts. All storm sewer structures and culvert systems shown in plans shall be utilize.

Bidder Inquiry 24: In order to determine the extent of work for bypassing and/or managing flows while connecting to the existing storm sewer system at, but not limited to, the Quintard St (north & south) and Sand Lane (north & south) locations, we request that all flow data including peak wet and dry weather flow information be provided accordingly for the existing box culverts to which the new structures will be connecting to.

Government Response: Please see below for Amendment 4 Bid Item 30 for existing sewer flows for fluming and bypassing.

Bidder Inquiry 25: Please provide a separate bid item for the proposed fire hydrant work or clarify which item(s) the fire hydrants are to be paid under.

Government Response: Fire hydrant work will be paid under Bid Items 60, 61, and 62 based on the size of the corresponding water main.

Bidder Inquiry 26: Please clarify under which bid item(s) the proposed bank stabilization and riprap forebays are to be paid under.

Government Response: Concrete for forebays is covered under Bid Item 2. Reno Mattress around forebays is covered under Bid Item 41. A new bid item, Bid Item 65, has been added to cover bank stabilization.

Bidder Inquiry 27: A 4’ x 2’ single, double, and triple barrel storm sewers are shown throughout the grading plans.

However, the plans do not provide any detail or reference for this sewer. Please provide all required storm and foundation details, as well as pile schedules, associated with the 4’ x 2’ storm sewer.

Government Response: See response to Bidder Inquiry 16.

Bidder Inquiry 28: The Scour Hole Detail on Plan Sheet C506 shows filter material beneath the concrete. Please provide the type and thickness of this material.

Government Response: The scour hole detail on C506 was revised in Amendment 4 to remove the filter material.

Bidder Inquiry 29: The NYCDEP Sewer Design Standards only provide pile spacing for the reinforced concrete sewer pipe, vitrified clay sewer pipe, A-1 manhole and C-1 manholes. Please provide the timber pile size and lengths for these pipes and structures that are required on this project. Additionally, please provide foundation details and pile schedules for the A-3, 4’ diameter, 5’ diameter, and 6’ diameter sewer manholes as there are no pile details for these structures in the NYCDEP Standard Sewer Drawings.

Government Response: Please see NYC DEP Sewer Design Standards Sheet SE31C for precast manhole pile cap details. A note has been added to the CU Plans showing timber piles that says “Timber piles shall be 13" butt diameter Douglas Fir or Southern Pine cleaned-peeled piles conforming to ASTM D25 Class B for Marine Structures. See Specification Section 31 62 19 ‘Timber Piles’.”

Bidder Inquiry 30: The scope and pay limits for Bid Item 30 Slope Stabilization Mat is unclear and not identified on the contract drawings. Please identify the locations and limits of Bid Item 30 Slope Stabilization Matting on the plans accordingly. Note that in accordance with specification section 31 35 20 - 1.2, matting installed under and adjacent to a maintenance access road shall be paid under that bid item. Please clarify.

Government Response: As shown on Sheet C504, Slope Stabilization Matting shall be placed in areas of 3’H to 1’V grading, such as the banks of gravel accessways and earth berms. The locations of stabilization matting are shown on the Civil Grading (CG) Plans.

Bidder Inquiry 31: Please verify the bottom limit of slope stabilization matting for Bid Item 38 Gravel Permanent Maintenance Accessway, as the detail on C504 does not specify this information.

Government Response: The bottom limit of slope stabilization matting is when slopes grading slopes become greater than 3’H to 1’V and at the limits of the forebays, scour holes, or intake sumps.

Bidder Inquiry 32: The scope and pay limits for Bid item 24 Jute Mesh is unclear and not identified on the contract drawings. Please identify the locations and limits of the Jute Mesh on the plans accordingly.

Government Response: Bid Item 24 Jute Mesh will cover all seeding areas, as referenced in the Landscape Plans (LP).

Bidder Inquiry 33: Bid item 9 includes payment for debris removal and disposal in cubic yards. Since the type and weight of debris removal is impossible to determine at the volume provided and is unknow by all bidders, payment for this bid item should be changed to tons in order to maintain balanced bids between bidders. Please update bid item accordingly.

Government Response: For Bid Item 9 Debris, Removal, and Disposal contractors shall assume a conversion factor of 4.44 CY per ton of debris, per Measuring Recycling: A Guide for State and Local Governments, by U.S. Environmental Protection Agency; Washington: 1997. The equivalent of 700 CY is 158 tons. The units and quantities of the bid schedule and bid sheet have been updated accordingly.

Bidder Inquiry 34: As per sheet LP601, there are 350 trees that need to have deer protection cages. Please clarify if the quantity stated 2832 EA is correct? Also, please specify the deer protection cage manufacturer.

Government Response: Deer protection cages should be installed around all trees and shrubs. Deer bark protectors may be substituted for trees greater than ¾” caliper. Quantities of trees and shrubs requiring protection are:

Shrubs #5 = 2,415 Trees #5 = 1,690 Trees 2.5” Cal = 386

Bidder Inquiry 35: The instructions to bidders indicate that bidders should utilize for SF24 for the bid bond, August 2016 revision. However, there is a 2023 revision of this form as well. Please confirm if bidders should use the 2016 or 2023 revision.

Government Response: Please utilize the most recent version.

Bidder Inquiry 36: Chamber #4, we are to construct the 55 foot wide chamber under the existing roadway in sections, no greater than 11’-0 wide per NYCDOT traffic stipulations. How is the chamber roof slab to be constructed, in parts, please provide further structural details of construction joints for the chamber floor and roof.

Bidder Inquiry 37: At Junction Chamber #4, we are to construct a new chamber over the existing culverts, (8’-0 x 4’-0) and (6’-0 x 4’-0). Please provide the as-builts of these culverts, and the expected flows in the Culverts to be diverted in order to construct the chamber. Similarly at Chamber #1, 2 and 3.

Government Response: It is the Contractor’s responsibility to obtain As-Builts. Please see Bidder Inquiry

100 response for existing sewer flows for fluming and bypassing.

Government Response: The chamber does not need to be built in 11-foot-wide sections. The NYC DOT

Traffic Stipulations require a minimum of 3 11-foot wide lanes to remain active during working hours. Refer to CT Plans CT105 and 108 for morning and afternoon lane closure. After working hours, the full width of the intersection shall be open to traffic. The method by which this is done is considered contractor’s means and methods. Please refer to NYC Title 34: Department of Transportation Chapter: Highway Rules Section 2-11 Street Openings and Excavations.

Bidder Inquiry 38: Bid Item No.7 calls for Berm Box Sewer, Install Precast Box. Where in the plans is this 328-foot-long culvert? Other bid items refer to box culverts carried in their respective bid items, Please clarify.

Government Response: Bid Item No. 7 refers to the 4’-0”W x 2’-0”H Storm Sewers on CU114. The total length of these storm sewers is 328 linear feet.

Bidder Inquiry 39: Bid item No. 48 describes a 24” D.I.P. pipe, whereas the drawings call for 18” ESVP, which governs?

Government Response: The material of the 24” pipe was changed from DIP to RCP in a previous amendment. Bid Item No. 47 covers the 18” ESVP at McLaughlin Street North. Bid Item No. 48 covers the 24” RCP at McLaughlin Street South.

Bidder Inquiry 40: Bid item No.53 calls for a 15” RCP, which is not shown on the drawings, an elliptical sewer is called for which governs.

Government Response: 15” RCP refers to the pipes from the catch basins to the 38"W X 24"H Elliptical

RCP Storm Sewer.

Bidder Inquiry 41: Bid Item No.56 calls for Oceanside Avenue Sanitary network-30” D.I.P. and on Drawings at Oceanside Ave in plan do not show any work or a 30”-D.I.P , However, On sheet CU-116, profiles labeled Oceanside Ave are no where near the actual Oceanside Ave. ,in plan, and are believed to be part of Bid item #42 Quintard street Structures. Please clarify this, OR that in fact the profile shown on CU115 and CU116 is Bid item #56 and the Bid item should be re labeled and the 30” DIP mentioned should be 30”RCP.

Government Response: Bid Item No. 56 is for the Oceanside Avenue and Quintard Street Sanitary

Network. The description of the bid item has been revised to include the 30” RCP and 24” RCP. The 30” DIP has been removed.

Bidder Inquiry 42: Reference Sheet C501 of Civil Drawings Set (Part B), Reno Mattress Detail: The cross section for the Reno Mattress shows a 9” depth and the Rip-Rap schedule shows stone sizes of D50 = 18”, 12”, and 6” for Quincy Ave, Quintard North, and Others, respectively. The spec section for the Reno Mattress (Section 32 05 03, page 2-3) says that rip rap stone should be between 4” and 6”. Please clarify the depth dimension of the Reno Mattress cross section and the rip-rap schedule sizing.

Government Response: The Reno Mattress detail on C501 has been revised to show stone sizes of D50 equal 6” for Qunicy Ave, Quintard North, and Others.

Bidder Inquiry 43: Reference Spec Section 31 23 00.00 20 Excavation and Fill, Section 3.3 Excavation, 2nd paragraph which states:

“In areas where excavation activities are taking place and Phragmites is present, the root mass shall be fully removed. If proposed contours indicate less than one foot (12 inches) of removal, then the root mass shall be over-excavated to a depth of one foot (12 inches) and backfilled with topsoil to proposed grade.”

Please identify the areas in which the Phragmites are present on a plan view of the site.

Government Response: It shall be assumed that the entire site contains Phragmites.

Bidder Inquiry 44: Reference the National Grid Standard Specifications. Within these specifications, under the II.

Technical Section, each description for each section (such as Section 6.01 – Trench Crossings) starts with the statement, “under this section, and no cost to facility operator”.

1. Is the contractor to anticipate the cost of gas interference work and apply that cost to the City Work?

2. Or will the provision of Section U (Version 2), provided within these specifications, apply?

3. Is there an estimated list of interference work provided by the gas company?

Government Response: National Grid has been DELETED, and Section U has been REVISED and

REISSUED under this amendment. Section U applies, the costs will be compensated by the utility companies, not the city. The contractor is required to immediately commence negotiations with each utility company for an Interference Agreement under which the company will compensate the contractor for any interference work which the company does not elect to perform with its own forces. Interferences are shown on the CU Plans.

Bidder Inquiry 45: Reference the Section U provided in these specifications.

Did the private utility companies listed in the Listing of Companies Named in the Contract (last page of Section U) provide their estimate of anticipated utility interference work, test pit information, locations of their facilities?

Government Response: Interferences for National Grid and Con Ed are indicated on the CU drawings.

Verizon’s facilities are all overhead. The other private utilities share facilities with one of these three companies.

Bidder Inquiry 46: Reference is made to the OCMC-Traffic Stipulations attached at the end of section 01 50 00 – Temporary Construction Facilities and Controls.

Ple…

This is the start of the file's text. The full file is on GovTribe.