This document provides details for a federal construction contract opportunity with the U.S. Army Corps of Engineers Engineering District New York. The contract is for construction of the South Shore of Staten Island Area E Hurricane Sandy Coastal Storm Risk Management Project in Richmond County, New York. The work includes construction of large interior drainage ponds, open channel culverts, stormwater drainage structures, box culverts, sluice gates, weir chambers, flap gates, and relocation of existing sanitary sewers. The solicitation will be issued in December 2023 as a firm-fixed price construction contract using Invitation for Bids procedures with an anticipated award date in early 2024. The contract value is estimated between $100-175 million with a period of performance of 1,279 calendar days. Bids are due 30 days after solicitation and will be submitted to the U.S. Army Corps of Engineers District Office in New York City.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
Respond to bidder inquires for informational purposes only
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0002
X 9B. DATED (SEE ITEM 11)
22-Dec-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 2
South Shore of Staten Island - Area E, Hurricane Sandy Coastal Storm Risk Management Project, Richmond County, New York
W912DS-24B-0002
Amendment 0002
TO BIDDERS:
The following changes shall be made to the drawings and specifications.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
a. CT001, CT111, CT112, CT113, CT116, CU104, CU105, CU107, CU108, CU109, CU111, CU113, CU114, CU118, LP601, L501, S-104, S-112, S-119, S-120, S-122, S-314, S-315, S-317, & S-504
2. The following DRAWINGS have been REVISED but NOT REISSUED:
a. None.
3. The following DRAWINGS have been ADDED:
a. None.
4. The following DRAWINGS have been DELETED:
a. None.
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
a. Sections 01 11 00, & 01 14 00
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).
Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)
Bidder Inquiry 01: Please direct bidders to the contract plans, specifications, bid schedule, and other relevant bid documents.
Government Response: All documents including the Plans, Specs, and requirements and instructions for bidding, can be found at the System for Award Management (SAM) website at www.sam.gov using Solicitation W912DS24B0002 under “Attachments/Links”. The Plans are labeled “Part A, Part B, Part C and Part D”.
Bidder Inquiry 02: Can you please share any CAD files associated with the project plans, as well as any survey data?
Government Response: CAD Files are not available for public release. Project Survey Data can be found in “Part+A_Plans_SSSI_Area+E_General+Survey+Geotech_Dec+2023.pdf” as posted under the “Attachments/Links” section of this solicitation.
Bidder Inquiry 03: It is requested that the bid date be extended from it’s current bid opening date of February 1, 2024.
Government Response: Amendment 1 extended the bid date to 29 February 2024.
Bidder Inquiry 04: Is this an RFP/ Best Value contract?
Government Response: The solicitation is an Invitation for Bids (IFB), and the bid opening date is scheduled for 29 February 2024.
Bidder Inquiry 05: It’s assumed that the Pipe infrastructure in the streets is to be supported by piles such as CFA’s or Timber Piles. It’s not clear where the pile supports are to be installed and what pipe they are supporting. We are asking for a specific Bid item for the piles that show the total length and also clarity on what pipe they are to support.
Government Response: For pile supports information, refer to structural drawings: S-102, S-104, S-107, S-110, S-112, S-115, S-119, S-120, S-121 & S-122.
Bidder Inquiry 06: Will there be a Prebid and or a Site Visit for this contract?
Government Response: No pre-bid site visit will be hosted by the Government for this solicitation;
however, the entire project area is visible from public property. Contractors are encouraged to view the site at their own availability to aid in the development of their bids.
Bidder Inquiry 07: Sheet LP601 of the Landscape Plans requires some clarification. For example, it has two Wetland Emergent Zone plug charts with the same exact label but different plug mixes. Both are labeled with the same target elevations, yet they both have different quantities of the same species. Which is correct?
Government Response: There are three sets of landscape schedules on LP-601 that are specific to each BMP: BMP SBE-1A, BMP SBE-1B, and BMP SBE-1C. Each Wetland Emergent Zone plug schedule is specific to the BMP indicated (e.g. BMP SBE-1A requires 97,250 wetland emergent zone plugs, BMP SBE-1B requires 89,300 wetland emergent zone plugs, and BMP SBE-1C requires 8,650 wetland emergent zone plugs).
Bidder Inquiry 08: Sheet LP601, the chart for extended detention zone seed mixes appears to be duplicated, with the only difference being the elevation contour is 3.59 on one and 3.5 on the other. What is the intent with these two charts?
Government Response: There are two sets of extended detention zone seed mixes on LP-601 that are specific to BMP SBE-1A and BMP SBE-1B. Each extended detention zone seed mix schedule and elevation note is specific to the BMP indicated (e.g. BMP SBE-1A requires extended detention zone seed mix to be planted between el. -0.66 and 3.59, BMP SBE-1B requires extended detention zone seed mix to be planted between el. -0.66 and 3.5. BMP SBE-1C does not contain an extended detention zone so there is no extended detention zone seed mix specified. Please note, the correct upper elevation of the extended detention seed mix for BMP SBE-1B is 3.59. This has been adjusted on LP601.
Bidder Inquiry 09: Sheet LP601, Upland Zone Seed Mix. There are two identical charts with no distinction. What is the intent here?
Government Response: There are three sets of landscape schedules on LP-601 that are specific to each BMP: BMP SBE-1A, BMP SBE-1B, and BMP SBE-1C. While the Upland Zone Seed Mix schedules are identical, they are to be applied to each BMP as indicated.
Bidder Inquiry 10: Sheet LP601, Note 5, what is the purpose of providing the note saying "Shrub plants to be installed at 25% of acreage in upland zone"? Exact quantities of shrubs are provided, so how is the 25% to be used?
Government Response: The inquiry is correct; the quantity of shrubs was calculated based on 25% of the upland acreage for BMP SBE-1A and SBE-1B, respectively. Provide the quantity of shrubs per the landscape schedule for the upland zone as indicated for BMP SBE-1A and SBE-1B. Layout of the shrubs shall be as indicated in Note 7.
Bidder Inquiry 11: Sheet LP601, Note 5, there is a note on the right hand side of the page states "Shrub plants to be installed at 50% of acreage in upland zone". This is a conflict with the other Note 5 on the same page stating 25%.
Which is correct, and how is this information to be used when exact quantities are given?
Government Response: The inquiry is correct; the quantity of shrubs was calculated based on 50% of the upland acreage for BMP SBE-1C. Provide the quantity of shrubs per the landscape schedule for the upland zone as indicated for BMP SBE-1C. Layout of the shrubs shall be as indicated in Note 7.
Bidder Inquiry 12: Sheet LP601, please clarify Note 11 on the Plant Schedule Notes.
Government Response: The seed mixes are to be applied in their respective planting zones prior to the installation of plant material. Extended detention seed mix is to be applied to both the extended detention and the emergent zones. Upland seed mix is to be applied in the upland zones as well as in areas where the restitution trees are planted as noted on the LP drawings.
Bidder Inquiry 13: Bid Items #30, 15’’ DIP & Bid Item #50, 18’’ DIP. Are these two pipes to be installed on piles?
Government Response: Bid Item #3 15" DIP & Bid Item #5 18" DIP are the total linear footage of multiple pipes and will not be installed on piles.
Bidder Inquiry 14: 18’’ ESVP that is shown on Plan G108, with details on CU111. Where are we to include the costs of this work? Which item should include the cost of this work?
Government Response: The cost of the 18" ESVP shown on CG108 and CU111 should be included in Bid Item #54 Vulcan Street - Storm Sewer.
Bidder Inquiry 15: Can the Contractor reuse the Excavated Materials from this project to fill excavations/trenches to grade? Or must the contractor import clean material for fill?
Government Response: Excavated material is assumed to be contaminated non-hazardous material until acceptably proven otherwise. Onsite source material can be reused if acceptable through appropriate inspection and testing. Refer to Specifications Section 02 61 13 Excavation and Handling of Contaminated Material.
Bidder Inquiry 16: In the solicitation package, the workforce participation goals for the minorities and females are only listed. In terms of minority subcontractors, what is the percentage goal?
Government Response: It is incumbent upon the offeror to provide subcontracting percentages that they feel that are achievable and will maximize Small Business Participation through their subcontracting activities. Responses should be provided in accordance with 52.219-9 Alt I Small Business Subcontracting
Plan (SEP 2023) Alternate I NOV 2016. Any socioeconomic category that the offeror does not feel they can meet should be justified.”
Bidder Inquiry 17: Spec. Section 00 21 13 Instructions to Bidders under Additional Instructions lists five (5) documents to be submitted as the bid proposal submission. Please confirm that these are the only documents that need to be submitted, and also confirm that we do not need to submit the entire 101-page Solicitation.
Government Response: Yes, these are the only documents that are required, the bidders do not need to submit the entire 101 page solicitation.
Bidder Inquiry 18: Spec Section 00 21 13 Instructions to Bidders states: “NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT BONDS: The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised as of August 2016. When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer nonresponsive.” The bond forms currently found on the GSA website have been updated as of October 2023. Are these forms acceptable? If not, please provide the bond forms to be used, revised as of August 2016.
Government Response: Language is hereby revised to NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT BONDS: The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised as of October 2023. When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer nonresponsive.
Bidder Inquiry 19: N/A
Bidder Inquiry 20: Please clarify the MBE/WBE/DBE/SBE/SDVOSB (etc.) subcontracting goals for this project.
Please clarify the agency certifications that will be accepted for the classification of MBE/WBE/DBE/SBE/SDVOSB vendors and subcontractors (ie. NYCSBS, Empire State Development, NYSDOT, USDOT, PANY/NJ, etc.).
Government Response: MBE/WBE/DBE and SBE are state certifications that do not apply to this acquisition. The apparent low bidder will be required to proposal goals for SB, SDB, SDVOSB, WOSB, HUBZone in the subcontracting plan.
Bidder Inquiry 21: Please provide an Engineer’s Estimate for this project.
Government Response: This information is not available for public release.
Bidder Inquiry 22: Reference Bid Item 0056 Oceanside Avenue - Sanitary Network The bid item description states: “All work necessary to install sanitary sewer network along Oceanside Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 30” DIP, manhole, existing utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.” Contract Drawings CU-115 and CU-116 indicate this pipe to be 30” RCP Class III.
Please clarify the pipe material to be used.
Government Response: The bid item incorrectly identified the type of material for the Oceanside Ave sanitary network. The contract drawings indicating the pipe to be 30" RCP Class III is correct.
Bidder Inquiry 23: Reference Contract Drawing CU-116 The 30” RCP sanitary sewer shown is shown to be replacing the existing 27” sanitary sewer in the same lane. on dwg CU-116, G1 – Plan – Oceanside at station 0+00 to 0+99.23. The new 30” RCP is to receive timber piles. If the new sanitary sewer is in the same lane as the existing, this would require taking the entire existing sanitary sewer run out of service upstream and running a bypass system until the new run is constructed (pipe, manholes, foundations, piles, etc. Please confirm if this is the correct intent for this item of work.
Government Response: This is the correct intent for the item of work. The contractor shall provide temporary fluming and bypassing of existing sewer flows in accordance with the contract specifications. Refer to Specifications Section 01 50 00 for Protection of Existing Flow.
Bidder Inquiry 24: Reference Bid Item 0048 McLaughlin Ave South - Storm Network The bid item description states: “All work necessary to install storm sewer network along McLaughlin Avenue, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 24" DIP, flap gate, manholes, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.” Contract Drawing CU-106 indicates this pipe to be 24” RCP Class III. Please clarify the pipe material to be used.
Government Response: The bid item incorrectly identified the type of material for the McLaughlin Ave South storm network. The contract drawings indicating the pipe to be 24" RCP Class III is correct.
Bidder Inquiry 25: Reference Bid Item 0057 - Sand Lane North - Sanitary Network The bid item description states: “All work necessary to install sanitary sewer network along Sand Lane North, including but not limited to excavation, dewatering, backfilling, hauling and soil disposal, support of excavation, crushed stone, 10” DIP, manhole, utility removal, pavement restoration and MPT in accordance with the Contract Drawings and Specifications.” Contract Drawing CU-117 indicates this pipe to be 8” ESVP. Please clarify the pipe material to be used.
Government Response: The bid item incorrectly identified the type of material for the Sand Lane North sanitary network. The contract drawings indicating the pipe to be 8" ESVP is correct.
Bidder Inquiry 26: Spec. Section 00 21 13 Instructions to Bidders under Additional Instructions, item #5 says “Bidders must check off box (d) in 52.204-8 Annual Representations and Certifications”.
Paragraph (d) on page 42 of 101, does not have a check off box associated with it. Please advise.
Government Response: Spec. Section 00 21 13 Instructions to Bidders under Additional Instructions, item #5 revised to Bidders must ensure 52.204-8 Annual Representations and Certifications is filled out or the SAM reps and certs if up to date.
Bidder Inquiry 27: Please advise if a Maintenance Bond is required for this project. If so, please provide the form of bond and associated terms and conditions.
Government Response: A Bid Guarantee is required with the bid. Performance and Payment bonds are required once the contract is awarded.
Bidder Inquiry 28: The following locations on the drawings state “See S-504 for type of pile and spacing”. The drawing S-504 does not provide that information.
1. Mallory Ave. – Storm Sewer Network – CU-104 – A1-Profile – Mallory Ave. - 18” ESVP storm sewer encased in concrete on piles.
2. Agnes Pl. – Storm Sewer Network – CU-105 – A1 Profile – Agnes Pl. - 24” RCP storm sewer encased in concrete on piles.
3. Andrew St. – Storm Sewer Network – CU-107 – A1 Profile – Andrew St. - 38”W X 24”H Horizontal Elliptical RCP storm sewer on concrete cradle on piles.
4. Wentworth Ave. – Storm Sewer Network – CU-108 – A1 Profile – Wentworth Ave. - 24” RCP storm sewer encased in concrete cradle on piles.
5. Orlando St. – Storm Sewer Network – CU-109 – A1 Profile – Orlando St. - 4’-0”W X 2’-0”H FTRC storm sewer on piles.
6. 6. Vulcan St. – Storm Sewer Network – CU-111 – A1 Profile – Vulcan St. - 18” ESVP storm sewer encased in concrete on piles. What type of piles?
Please provide the type and spacing of the piles for the above locations.
Government Response: The referenced CU drawings have been revised to "…on piles (See S-504 for piles spacing and type) at existing structures." S-504 has been revised to provide more information on the details about the piles and reference that the pile spacing and type can be found on the plan drawings.
Bidder Inquiry 29: None of the manholes to be installed have any clear indication of what type of piles they are to be supported upon. Please clarify.
Government Response: Manhole details showing piles information for the types of manholes called out in the CU Sheets can be found in the NYC DEP Sewer Design Standards, dated September 2007, latest revision August 2018.
Bidder Inquiry 30: Regarding the various notes on the utility drawings regarding CCTV inspection of existing utilities. The following callouts have no quantity associated with the CCTV inspections:
1. Contract Drawing CU113 Wentworth Avenue – 18” sanitary sewer.
2. Contract Drawing CU113 Wentworth Avenue – 10” sanitary sewer.
3. Contract Drawing CU118 Quintard street North – 24” sanitary sewer.
Please provide lengths of these utilities to be CCTV inspected.
Government Response: The quantities for the CCTV inspections listed are now included on the revised CU drawings and are as follows:
1. CU113 Wentworth Avenue - 18" sanitary sewer -- 226 LF
2. CU113 Wentworth Avenue - 10" sanitary sewer -- 203 LF
3. CU118 Quintard Street North - 24" sanitary sewer -- 12 LF
Bidder Inquiry 31: Regarding the various callouts for CCTV inspection of existing utilities, are these utilities to be cleaned as well? The Contract Drawings only identify CCTV to be performed, but there are separate bid items for (0058) Television Inspection of Sewer and (0059) Sewer Cleaning. Please clarify.
Government Response: The CCTV inspection of existing utilities also requires the existing utilities to be cleaned. There are two different specification sections that described the CCTV inspections and the sewer cleaning, which is why there are two separate bid items. Refer to Specifications Section 33 01 30.16 TV Inspection of Sewer Lines and Section 33 29 00 Sewer Cleaning.
Bidder Inquiry 32: Reference Contract Drawings S-314 and S-315 for Box Sewers 1 thru 6. Please provide pile information including pile type, size, length and spacing.
Government Response: Pile information for Box Sewers 1 through 6 is shown on their respective plan sheets. The plan sheets are as follows:
Quintard St. North Bow Sewer 1, Quintard St South Box Sewer 2, & Sand Lane North / Quincy Ave. Box Sewer 3 - S-104.
Father Capodanno Box Sewer 4, Pearsall St Box Sewer 5, & Sand Ln South / Father Capodanno Box Sewer 6 - S-112.
Bidder Inquiry 33: Reference Contract Drawings S-317 for the Berm Box Sewers. Please provide pile information including pile type, size, length and spacing.
Government Response: Berm Box Sewer corresponds with the 4'-0" x 2'-0"H Storm Sewers on CU114.
Pile information for the Berm Box Sewers has been added to S-317 and S-122.
Bidder Inquiry 34: Regarding new utilities installed under this project scope; [1] Is television inspection required and [2] Is cleaning of these utilities required?
Government Response: CCTV is required post-installation for existing utilities and new utilities to verify if the slip lining of the sanitary and storm sewers have been completed in accordance with the contract documents and to Specification Section 33 01 30.16 – TV Inspection of Sewer Lines. There are no cleaning requirements for the sewers. They shall be kept free of dirt and debris and plastic pipe shall be protected from any environment that would result in damage or deterioration to the material according to Specifications Section 33 30 00 - Sanitary Sewer & Section 33 40 00 - Storm Drainage Utilities.
(End of Summary of Changes)