This document is a section from the specifications for the Construction of the South Shore of Staten Island (SSSI) Coastal Storm Risk Management Project in Richmond County, New York. It covers the requirements for Landscape Establishment, including irrigation equipment maintenance, groundcover/planter bed maintenance, and exterior plant establishment.
The key details are: The project is part of the SSSI Area E interior drainage improvements, which includes construction of large detention ponds, drainage structures, and relocation of sanitary sewers. The landscape maintenance period will be for two consecutive growing seasons after installation, with specific requirements for irrigation, groundcover, and exterior plants. The contractor must perform regular maintenance tasks such as mowing, weeding, pruning, and adjusting plant supports. Acceptance criteria are provided, including minimum survival rates for plants. The contractor must also submit maintenance inspection reports, plant quantities, and a certified letter for tree staking removal. This is a section of the overall technical specifications for the construction contract.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COASTAL STORM RISK MANAGEMENT - INTERIOR DRAINAGE AREA E POND SBE
SECTION 32 05 33 Page 1
PART 1 GENERAL
1.1 REFERENCES
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
08/17, CHG 3: 03/24
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D5851 (1995; R 2015) Planning and Implementing a Water Monitoring Program
TREE CARE INDUSTRY ASSOCIATION (TCIA)
TCIA Z133 (2017) American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining, and Removing Trees, and Cutting Brush - Safety Requirements
1.2 DEFINITIONS
1.2.1 Pesticide
Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides and rodenticides.
1.2.2 Planter Beds
A planter bed is defined as an area containing one or a combination of the following plant types: shrubs, vines, wildflowers, annuals, perennials, ground cover, excluding turf. Trees may also be found in planter beds.
1.3 RELATED REQUIREMENTS
Section 32 92 19 SEEDING applies to this section for installation of seed requirements, with additions and modifications herein.
Section 32 93 00 EXTERIOR PLANTS applies to this section for installation of trees, shrubs, ground cover, vines, and wildflower, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification
SECTION 32 05 33 Page 2 identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Herbicide Application Treatment Plan
SD-03 Product Data
Fertilizer; G
SD-07 Certificates
Maintenance Inspection Report
Plant Quantities; G, RO
Pesticide Applicator Certification
SD-10 Operation and Maintenance Data
Maintenance
SD-11 Closeout Submittals
Tree Staking Removal Certified Letter
1.5 MAINTENANCE
Submit Operation and Maintenance (O&M) Manuals for planting materials.
Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year. Provide instructions and procedures for watering; promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management. O&M Manuals must include pictures of planting materials cross referenced to botanical and common names, with a description of the normal appearance in each season.
Develop a water monitoring program for surface and ground water on the project site in accordance with ASTM D5851 and consistent with the water management program utilized during construction operations.
PART 2 PRODUCTS
2.1 RENO MATTRESS
Fertilizer for groundcover, wildflowers, and grasses is not permitted.
Provide and submit for approval fertilizer for trees, plants, and shrubs as recommended by plant supplier, except synthetic chemical fertilizers are not permitted. Fertilizers containing petrochemical additives or that have been treated with pesticides or herbicides are not permitted.
Contractor shall furnish all labor, materials, equipment necessary to install Reno Mattress as shown on the Contract drawings and in accordance with the specification and as directed by the Contracting Officer. The quantity to be measured for payment under this item shall be the total
SECTION 32 05 33 Page 3 number of square yards of reno mattress installed as directed by the Contracting Officer.
2.1.1 Materials and Construction
Reno Mattress is a wire mesh container uniformly partitioned into internal cells with relatively small height in relation to the other dimensions.
The internal cells are interconnected with other units and filled with stone at the project site to form flexible, permanent monolithic structures used for channel bottom protection. The reno mattress shall have the dimensions as shown on the contract drawings.
The wire mesh shall be non-raveling mesh made of twisting continuous pairs of wires to form hexagonal shaped openings which are interconnected to adjacent wires. The wire is made from zinc coated and overcoated with PVC.
PVC coatings shall not show cracks or breaks after the fabrication of the mesh. Fasteners used to assemble and interconnect the individual units shall be made of stainless steel.
The stones for the reno mattress shall be between 4" and 6" in diameter.
The stones shall meet the specifications of the Rip Rap, Section 7.107 of this contract.
The subgrade shall be excavated to allow for the placement of the reno mattress to form the grade shown of the contract drawings. The reno mattress shall be placed on geotextile fabric laid directly on the compacted subgrade.
2.2 WATER
Source of water must be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or graywater when available.
2.3 HERBICIDES
The Contractor must apply a NYS approved herbicide to persistent herbaceous and woody growth in accordance with the Contract Drawings and as directed by the Contracting Officer. The Contractor must secure all necessary state and local permits for the application of herbicide and adhere to any specific permit requirements or special conditions.
2.3.1 General Regulations for Herbicides
The Contractor must carefully protect all plant material and structures during and following the herbicide application. Any repair to damaged plants and structures resulting from herbicide application must be repaired by the Contractor at the Contractor’s own expense.
Invasive plants to be removed will be identified by the Contacting Officer.
2.3.2 Quality Assurance
The Contractor must submit an Herbicide Applicator that possesses a valid NYSDEC Type 5A - Aquatic Vegetation Pesticide Applicator Certification License and personnel training records.
The Contractor must develop an Herbicide Application Treatment Plan for the control of invasive species prior to performing any construction
SECTION 32 05 33 Page 4 activities. The plan must contain information on the products to be sprayed (including manufacturer’s recommended application procedures and rates and all applicable material safety data sheets, the proposed schedule of herbicide application(s), credentials and certifications for all of the personnel that will be applying the herbicide. All appropriate health and safety data records and procedures to be implemented. Prior to execution of the herbicide application treatment plan, the Contractor must submit the plan for approval by the Contracting Officer.
2.3.3 Materials and Methods
1. The work will eradicate invasive, non-native plants in upland and wetland areas using NYS approved herbicide for eradication of all plants except Oriental Bittersweet, which will be treated with Garlon
4. All chemicals to be applied using backpack and hand-held sprayers and individual stem wipe or injection applications. Herbicides application to open water/marshlands is prohibited.
2. In wetlands, the Contractor must spray NYS approved herbicide or approved equal onto specified weedy growth only, as directed and approved by the Contracting Officer, between May and September.
3. All vine and invasive plant material must be removed by hand. The removal of these plant and materials must be from existing trees, fence lines, utility poles and lines, adjacent structures, BMP sites, and other areas within the watershed. All vines and invasive plant material removed must be disposed of by the Contractor at the Contractor’s own expense.
4. Invasive tree climbing vines, including but not limited to Oriental bittersweet (Celastrus orbiculatus), porcelainberry (Ampelopsis brevipedunculata), greenbrier (Smilax spp.), honeysuckle vine (Lonicera spp.), must be cut flush to the ground. Herbicide must be applied to the cut stumps of the tree climbing vines where possible as determined by the Restoration Specialist and approved by the Contracting Officer. The herbicide applied to the cut stump must be pure product not having been mixed with water. Once tree climbing vines have been cut, they are to be left in place until leaf material and clinging tendrils dry out. Invasive vines must then be removed from the trees by hand and as directed by the Restoration Specialist taking care to avoid damaging the trees.
5. The applicator must spray to wet--not to the point of runoff. Care must be taken to properly calibrate the tank nozzle so as to direct herbicide spray only onto the undesirable plants and obtain complete coverage of leaves and stems. Avoid spray drift onto desirable plants and minimize spray contact with soil. It is recommended to spray when plants are not under water stress. Only flat pan nozzles must be used when using a spray applicator.
6. In areas where invasive plants are tightly intermixed with native plants, the applicator must use the individual wipe or injection method to prevent the accidental treatment of desirable plant material. Marking dyes must be added to the herbicide at the request of the Contracting Officer to prevent the accidental treatment of desirable plant material.
7. Apply on a warm sunny day (75 degrees to 90 degrees preferred). Do not spray if wind speed exceeds 5 mph or if weather conditions would decrease the effectiveness of the herbicide or increase the intended target area.
Do not apply or allow herbicide spray into surrounding waterbodies. Do not exceed the rates indicated on product labels.
SECTION 32 05 33 Page 5
8. A non-ionic surfactant that is labeled for use with herbicides must be added to the herbicide to help penetrate targeted plants for increased control. Surfactant must contain 50% or more active ingredient.
9. When using water from on-site hydrants, remove all suspended particles that may reduce the effectiveness of the herbicide prior to adding the water to the mixing tank.
10. All treated areas must be temporarily posted with signs indicating that the area has been treated with herbicide. Signs must be clearly posted in areas where the public may come into contact with the plant material.
11. The Contractor must return to the site after fifteen (15) calendar days and remove any dead vegetation that may interfere with planting of new material. If a second application is deemed necessary, a minimum of fifteen (15) calendar days is required before the Contractor can remove any remaining dead vegetation and begin installing any new plant material.
Planting may proceed when the site is deemed acceptable to the Contracting Officer.
12. Any sucker or new growth that emerges post removal operations must be removed or treated by the Contractor, either manually or by hand wiping with herbicide, throughout the duration of the two consecutive growing season plant guarantee.
13. The plant species to be eradicated must primarily include:
common reed (Phragmites australis)
Additionally, other species to be eradicated that may or may not be present at the site include additional species at the direction of the Contracting Officer:
Asiatic sand sedge (Carex kobomugi) black locust (Robinia psuedoacacia) burning bush (Euonymus alatus) common ragweed (Ambrosia artemisiifolia)
English ivy (Hedera helix) giant hogweed (Heracleum mantegazzianum) giant ragweed (Ambrosia trifida)
Japanese honeysuckle (Lonicera japonica)
Japanese knotweed (Polygonum cuspidatum)
Japanese stiltgrass (Microstegium vimineum) mile-a-minute vine (Polygonum perfoliatum) mugwort (Artemisia vulgaris) mutiflora rose (Rosa mutiflora)
SECTION 32 05 33 Page 6 oriental bittersweet (Celastrus orbiculatus) porcelain berry (Ampelopsis brevipedunculata) purple loosestrife (Lythrum salacaria)
Russian olive (Elaeagnus angustifolia) tree of heaven (Ailanthus altissima) white mulberry (Morus alba)
14. Herbicide application(s) to monoculture stands of common reed shall occur no sooner than August 1st. Herbicide application(s) to all other invasive and non-native plants shall occur no sooner than July 1st.
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include irrigation equipment cleaning and adjustments, mowing, edging, overseeding, aeration, fertilizing, watering, weeding, pruning, stake and guy adjusting, for all newly installed landscape areas and existing plant material, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.
3.1.1 Policing
Police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris. Policing must extend to both sides of fencing or walls. Collected debris must be promptly removed and disposed of at an approved disposal site.
3.1.2 Drainage System Maintenance
Remove all obstructions from surface and subsurface drain lines to allow water to flow unrestricted in swales, gutters, catch basins, storm drain curb inlets, and yard drains. Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of all debris and vegetation at all times. Edges of these channels must be clear of any encroachment by vegetation.
3.2 IRRIGATION ESTABLISHMENT PERIOD
The irrigation establishment period will commence on the date that inspection by the Contracting Officer shows that the new irrigation equipment furnished under this contract have been satisfactorily installed and is functional and must continue for a period of two consecutive growing season plant guarantee.
3.2.1 Maintenance During the Irrigation Establishment Period
Begin maintenance immediately after irrigation equipment has been installed and is functional. Inspect irrigation equipment at least once a week during the installation and establishment period and perform needed maintenance promptly. Automatic controllers not equipped with rain shut-off sensors must be turned off during periods of rain that exceed
SECTION 32 05 33 Page 7 twelve hours of continuous rainfall in one day or during rain storms of one day or more. Once the rain has subsided timers must be reactivated.
Irrigation controllers must be inspected and reprogrammed after power outages. Contractor must be responsible for winterization and startup.
Sprinkler heads must direct water away from buildings and hard surfaced areas.
3.2.2 Water Restrictions
abide by state, local or other water conservation regulations in force during the establishment period. Automatic controller must be adjusted to comply with the water conservation regulations schedule.
3.2.3 Fire Hydrants
To use a fire hydrant for irrigation, obtain prior clearance from the Contracting Officer and provide the tools and connections approved for use on fire hydrants. If a fire hydrant is used, Provide a reduced pressure backflow preventer for each connection between hose and fire hydrant.
Backflow preventer used must be tested once per month by a certified backflow preventer tester.
3.2.4 Final Acceptance
Upon completion of the irrigation establishment period and final acceptance of groundcover and exterior plants, irrigation equipment must be removed. Operation and coverage test is acceptable if system operates through at least one complete cycle for areas to be irrigated and all leaks or repairs have been completed.
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new planter beds furnished under this contract has been satisfactorily installed to a 90 percent stand of coverage. The establishment period must continue for a period of two consecutive growing season plant guarantee.
3.3.1 Frequency of Maintenance
Begin maintenance immediately after planter beds has been installed .
Inspect area once a week during the installation and establishment period and perform needed maintenance promptly.
3.3.2 Promotion of Growth
Maintain groundcover in a manner that promotes proper health, growth, natural color. planter beds must be free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, topdress and perform other operations necessary to promote growth, as approved by Contracting Officer.
Remove noxious weeds common to the area from planting areas by mechanical means.
SECTION 32 05 33 Page 8
3.3.3 Mowing
3.3.3.1 Native Grasses
Mow above height of native grass seedlings (approximately 3.5 to 4 inches ). Mow during spring or early summer. Do not mow after early summer during the second growing season.
3.3.3.2 Wildflowers
Mow three times per season above height of the wildflowers (approximately 12 to 15 inches).
3.3.4 Replanting
Replant in accordance with Section 32 93 00 EXTERIOR PLANTS and Section 32 92 19 SEEDING and within specified planting dates areas which do not have a satisfactory stand of turf.
3.3.5 Final Inspection and Acceptance
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.
Final turf acceptance will be based upon a satisfactory stand of turf.
3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD
The exterior plant establishment period will commence on the date that inspection by the Contracting Officer shows that the new plants furnished under this contract have been satisfactorily installed and must continue for a period of two consecutive growing season plant guarantee. A minimum 90% survival rate of all planted material must be met at the end of the exterior plant establishment period.
3.4.1 Frequency of Maintenance
Begin maintenance immediately after plants have been installed. Inspect exterior plants at least once a week during the installation and establishment period and perform needed maintenance promptly.
3.4.2 Promotion of Plant Growth and Vigor
Water, prune, fertilize, mulch, adjust stakes, guys and turnbuckles, eradicate weeds and perform other operations necessary to promote plant growth, and vigor.
3.4.3 Planter Bed Maintenance
Planter beds must be weeded, fertilized, irrigated, kept pest free, turf free, pruned, and mulch levels maintained. Planter beds will not be allowed to encroach into turf areas. A definite break must be maintained between turf areas and planter beds.
3.4.3.1 Shrub Selective Maintenance
In addition to the above requirements, shrubs must be selectively pruned, and shaped for health and safety when the following conditions exist:
Remove growth, over entrance ways or walks, and any growth which will obstruct vision at street intersections or of security personnel; Remove dead, damaged or diseased branches or limbs; where shrub growth obstructs
SECTION 32 05 33 Page 9 pedestrian walkways; where shrub growth is found growing against or over structures; where shrub growth permits concealment of unauthorized persons. Dispose of all pruning debris in a proper manner.
3.4.3.2 Tree Maintenance
Tree maintenance must include adjustment of stakes, , watering, fertilizing, pest control, mulching, pruning for health and safety and fall leaf cleanup. Inspect and adjust stakes, ties, guy supports and turnbuckles to avoid girdling and promote natural development. All trees within the project boundaries, regardless of caliper, must be selectively pruned for safety and health reasons. These include but are not limited to removal of dead and broken branches and correction of structural defects. Prune trees according to their natural growth characteristics leaving trees well shaped and balanced. Pruning of all trees including palm trees must be accomplished by or in the presence of a certified member of the International Society of Arboriculture and in accordance with TCIA Z133. All pruning debris generated must be disposed of in a proper manner.
3.4.4 Slope Erosion Control Maintenance
Provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped and natural growth areas. Maintenance tasks include immediate repairs to weak spots in sloped areas, and maintaining clean, clear culverts, and graded berms, and terraces to intercept and direct water flow to prevent development of large gullies and slope erosion and during periods of extended rainfall, irrigation systems must be secured. Eroded areas must be filled with amended topsoil and replanted with the same plant species. Erosion control netting damaged due to slope erosion must be reinstalled.
3.4.5 Removal of Dying or Dead Plants
Remove dead and dying plants and provide new plants immediately upon commencement of the specified planting season, and replace stakes, guys, mulch and eroded earth mound water basins. Provide an additional 90 day establishment period for replacement plants beyond the original warranty period. A tree must be considered dying or dead when the main leader has died back, or a minimum of 20 percent of the crown has died. A shrub or ground cover must be considered dying or dead when a minimum of 20 percent of the plant has died. This condition must be determined by scraping on a branch an area 1/16 inch square, maximum, to determine the cause for dying plant material and must provide recommendations for replacement. The Contractor must determine the cause for dying plant material and provide recommendations for replacement.
3.4.6 Tracking of Unhealthy Plants
Note plants not in healthy growing condition, as determined by the Contracting Officer, and as soon as seasonal conditions permit, remove and replace with plants of the same species and sizes as originally specified.
Install replacement plantings in accordance with Section 32 93 00 EXTERIOR
PLANTS.
3.4.7 Final Inspection
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the establishment period. Final
SECTION 32 05 33 Page 10 inspection will be based upon satisfactory health and growth of plants and on the following:
3.4.7.1 Total Plants on Site
Plants have been accepted and required number of replacements have been installed.
3.4.7.2 Mulching and Weeding
Planter beds and earth mound water basins are properly mulched and free of weeds.
3.4.7.3 Tree Supports
Stakes are in good condition.
3.4.7.4 Remedial Work
Remedial measures directed by the Contracting Officer to ensure plant material survival and promote healthy growth have been completed.
3.4.8 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
3.5 FIELD QUALITY CONTROL
3.5.1 Maintenance Inspection Report
Provide maintenance inspection report to assure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations must be documented at the start of the establishment period, then quarterly following the start, and at the end of establishment period. Submit results of site observation visits to the Contracting Officer within 7 calendar days of each site observation visit.
3.5.2 Plant Quantities
Provide Contracting Officer with the number of plant quantities. In addition, provide total exterior area of hardscape and landscaping such as turf and total number of shrubs.
3.5.3 Tree Staking Removal
Provide a Tree Staking Removal Certified Letter that all stakes are removed from all project trees at the end of the establishment period.
-- End of Section --
| ASTM INTERNATIONAL (ASTM) |
| TREE CARE INDUSTRY ASSOCIATION (TCIA) |
| 1.2 DEFINITIONS |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 MAINTENANCE |
| PART 2 PRODUCTS |
| 2.2 WATER |
| 2.3 HERBICIDES |
| PART 3 EXECUTION |
| 3.2 IRRIGATION ESTABLISHMENT PERIOD |
| 3.3 GROUNDCOVER ESTABLISHMENT PERIOD |
| 3.4 EXTERIOR PLANT ESTABLISHMENT PERIOD |
| 3.5 FIELD QUALITY CONTROL |