W912DS23R0009 0001.pdf

PDF 401 KB Posted

Attached to
LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
Solicitation number
W912DS23R0009
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This amendment to a solicitation extends the bid opening date and inquiry submission deadline for a firm-fixed price renovation contract awarded by the U.S. Army Corps of Engineers, New York District. The solicitation seeks proposals to renovate Lincoln Hall at the U.S. Military Academy in West Point, New York, including supporting work. Drawings and specifications are revised to include additional details on hazardous material remediation, site plans, structural and architectural elements, plumbing, electrical, and mechanical systems. Offerors must acknowledge any amendments by the revised deadline of July 14, 2023 at 2:00 PM EST to be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to LINCOLN HALL RENOVATION, BLDG. 607, newest first.
File Type Posted
W912DS23R0009-0005.pdf PDF
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS.pdf PDF
I-103 - LEVEL B1 FLOOR PLAN - FINISH.pdf PDF
I-602 - FINISH MATERIAL SCHEDULE.pdf PDF
L-502.pdf PDF
Amendment 0004.pdf PDF
I-603 - FINISH MATERIAL SCHEDULE.pdf PDF
I-604 - FINISH MATERIAL SCHEDULE.pdf PDF
S-502.pdf PDF
A-202.pdf PDF
A-204.pdf PDF
A-401.pdf PDF
A-562 - MILLWORK DETAILS - BRIEFING ROOM.pdf PDF
Supplmental laydown area at Ordnance road.pptx PPTX presentation
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
21 30 00-001.2_R3 Fire Pump House Submittal (Cullum).pdf PDF
Lincoln Hall Drawing Changes 22 JUN 2023.pdf PDF
AS BUILT DRAWING 1A - Approximate Location of Knox BatteryAmend 1.pdf PDF
LH- H-101.pdf PDF
Lincoln Hall Specification Changes 22 JUN 2023.pdf PDF
C-001.pdf PDF
CD101.pdf PDF
CS103.pdf PDF
2023.06.20 Lincoln Hall site walk through sign in sheet.pdf PDF
JA 009-23 Avaya Switch.pdf PDF
JA 011-23 Ventrol AHU.pdf PDF
JA 012-23 Identiv Card Access System.pdf PDF
JA 014-23 Shark Meter.pdf PDF
W912DS23R0009.pdf PDF
JA 006-23 Belden Brick.pdf PDF
JA 008-23-Ruabon Quarry Tile.pdf PDF
JA 010-23 Best Hardware Lock Cylinders and Cores.pdf PDF
Vol 1 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 03_Revised_RTA_2023-03-01.pdf PDF
Vol 2 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
Vol 3 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 01_Revised_RTA_2023-03-01.pdf PDF
LH_VOLUME 04_Revised_RTA_2023-03-01.pdf PDF
JA 007-23 Distributed Antenna System.pdf PDF
JA 013-23 Monaco.pdf PDF
LH_VOLUME 02_Revised_RTA_2023-03-01.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS23R0009

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: 1) extend the bid opening date from 7 July 2023 to 14 July 2023 at 2:00PM EST; 2) extend inquiry submissions from 26 June 2023 to 5 July 2023 2 11:59AM EST; 3) post the site visit sign in roster; 4) provide revised and reissued draw ings; 5) provide revised and reissued specif ications, and 6) provide revised but not reissued specifications.

NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23R0009

X 9B. DATED (SEE ITEM 11)

07-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2023

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

HAZMAT:

Drawing No. H-101 Added horizontal hatching to XB301 and B305 mechanical rooms to indicate that mold may be present and must be remediated.

Site / Civil:

Drawing No. C-001 Added General Note #28

Drawing No. CD101 Added General Sheet Note #1 referencing the as built drawing showing Knox Battery. As built drawing has been added to project specification section 01 57 19 (see below).

Drawing No. CS103 Removed references to laydown area at Doubleday parking lot, and references to Cullum Hall completion. Lincoln Hall contractor is permitted to use the entire Lincoln lot except an access route to Cullum and WP Club.

Structural:

Drawing No. S-102 Corrected a reference to the incorrect CLIN on Detail A1

Architecture:

Drawing No. A-001 Added baby changing station to mounting height legend.

Drawing No. A-401 Revised Detail D1 and Enlarged Floor Plan C5

Drawing No. AG202 Revised entire sheet

Drawing No. AG203 Revised entire sheet

Drawing No. AG501

Revised entire sheet

Drawing No. AG502 Revised entire sheet

Drawing No. AD101, AD102, AD103, AD104, AD105, AD106, AD107, AD108 Revised General Note #2.

Plumbing:

Drawing P-101:

Added note regarding water service as DIP, referencing specifications in Volume 3, Appendix A.

Added piping from XB301 to B305

Drawing P-403:

Added make up water backflow preventer.

Drawing P-604:

Added BFP-2 to plumbing schedule.

Drawing P-701:

Added piping Added BFP-2

Electrical:

Drawing EL105 and EL106 Removed symbol of a “P” within a circle, as it is not needed.

Mechanical:

Drawing MP101 Added Chilled water supply and return between XB301 and B305, Revised Piping configuration in

XB301

Added Expansion Tank (ET-2) Added Air Separator 2 (AS-2) Added Keynote #18

Drawing M-601 Added Expansion Tank ET-2 to Expansion Tank Schedule and added note 7.

Added Air Separator 2 (AS-2) to Air Separator Schedule

Drawing M-702 Changed Campus Chilled Water Flow Diagram to reflect temporary chiller hydronic equipment (AS-2, ET-2), size of temporary chiller quick connect, valve configuration

2. The following DRAWINGS have been REVISED but NOT REISSUED:

None

3. The following DRAWINGS have been ADDED:

As Built of the Knox Battery

4. The following DRAWINGS have been DELETED:

None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

a. None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

a. None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

10 28 13 – TOILET ACCESSORIES

Paragraph 1.2 – SD-03 Product Data Added - Item A4995 Table, Diaper Changing, Wall Mounted; G

Paragraph 1.2 – SD-07 Certificates Added - Baby Changing Stations

Paragraph 1.2 – SD-10 Operation and Maintenance Data Added - Item A4995 Table, Diaper Changing, Wall Mounted; G

Paragraph 1.3 Certifications Added Paragraph 1.3.1 Baby Changing Stations

Paragraph 2.1.3 New paragraph added to describe Accessory Type H Item A4995 Table, Diaper Changing, Wall

Mounted.

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

01 50 00 – TEMPORARY CONSTRUCTION FACILITIES

Paragraph 3.6.1 - Administrative Field Offices

Remove the third paragraph (beginning with “Location of Contractor laydown area…”) in its entirety. Contractor is not authorized to use Doubleday parking lot.

Paragraph 3.6.3 - Supplemental Storage Area Add the following sentences to the end of the paragraph.

“Contractor may install temporary fencing, to be coordinated with DPW. Contractor will not store nor dispose of hazardous materials / waste on the supplemental site. Contractor will keep their staging area clean, neat, and orderly. Contractor will remove their materials and fencing at the completion of their construction project. Contractor may need to clear and level area for use and will restore site to same condition at when they took possession”

(End of Summary of Changes)