I-602 - FINISH MATERIAL SCHEDULE.pdf
PDF 128 KB Posted
- Attached to
- LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
- Solicitation number
- W912DS23R0009
About this file
This document package includes interior finish specifications and schedules for the renovation of Lincoln Hall at the United States Military Academy in West Point, New York. The specifications cover flooring, wall, and ceiling finishes for multiple levels of the building. Materials include terrazzo, stone, carpet, luxury vinyl tile, porcelain tile, and painted gypsum. Restrooms and support spaces are also scheduled. Finishes are specified for corridors, offices, conference rooms, mechanical spaces, and other facility areas. The related solicitation seeks fixed-price proposals to complete the interior renovation work outlined in the specifications by a specified due date. The United States Army Corps of Engineers will evaluate submissions and award a contract for the project.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES & REMARKS
1. INSTALL CORNER GUARD, CG-2. SEE FINISH PLANS ON I-101 TO I-107 FOR
LOCATIONS.
2. PROVIDE STONE SEALER, STS-1 AT ALL BLUE STONE LOCATIONS.
3. PROVIDE ENTRANCE MAT, EM-1 AT ENTRY. SEE FINISH FLOOR PLANS ON
I-101 TO I-107 FOR LOCATION.
4. SEE ENLARGED FINISH PLANS ON I-400 TO I-406 FOR FLOORING PATTERNS.
5. SEE RESTROOM ELEVATIONS ON A-401 FOR FINISH LOCATIONS.
6. TOILET PARTITIONS TO BE FINISH TP-1. SEE COLOR MATERIAL LEGEND ON
I-600 AND I-601.
7. SEE INTERIOR DETAILS FOR INFORMATION ON WINDOW FILM INSTALLATION.
8. INSTALL CORNER GUARD, CG-1. SEE FINISH PLANS FOR LOCATIONS.
9. INSTALL WT-1/WT-2. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.
10. INSTALL WT-3/WT-4. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.
11. INSTALL WT-5/WT-6. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.
12. PROVIDE ENTRANCE MAT, EM-2 AT ENTRY. SEE FINISH PLANS ON I-101 TO
I-107 FOR LOCATION.
13. STAIRS TO BE TRZ-ST1
14. PROVIDE ACOUSTIC FLOOR UNDERLAYMENT, AFU-1
15. REPAINT EXISTING RAILINGS. MATCH EXISTING COLOR AND FINISH.
16. CREST MADE OUT OF RT-5 - RT-12. SEE B2/I-406 FOR DETAILS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
I-602
F
IN
IS
H
M A
T E
R
IA
L S
C H
E D
U L E
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
A S
C H
A F
E R
A S
C H
A F
E R
D M
A N
T Y
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
MATERIAL ABBREVIATIONS
ACT ACOUSTIC CEILING TILE & GRID
AFU ACOUSTIC FLOOR UNDERLAYMENT
APC ACOUSTICAL PANEL CLOUD
ASC ACOUSTICAL SUSPENDED CLOUD
AWP ACOUSTICAL WALL PANEL
BS BLUE SLATE
CG CORNER GUARD
CPT MODULAR CARPET TILE
CU CURTAIN FABRIC
EC ELEVATOR CEILING
EF ELEVATOR FLOOR
EM ENTRANCE MAT FLOORING
EWP ELEVATOR WALL PANEL
EX EXISTING TO REMAIN
EX-CS EXISTING CONCRETE STAIR - REFURBISHED
EX-QFT/
BS
EXISTING QUARRY FLOOR TILE AND BLUE SLATE - REFURBISHED
EXP EXPOSED
GRT GROUT
GWB GYPSUM WALL BOARD
LVT LUXURY VINYL TILE
MB MARKER BOARD
MCT METAL CEILING TILE
MES METAL EDGE STRIP
MWT MOSAIC WALL TILE
OTS OPEN TO STRUCTURE
PBN PORCELAIN BULLNOSE
PFT PORCELAIN FLOOR TILE
PL PLASTIC LAMINATE
PT PAINT
PTB PORCELAIN TILE - COVE BASE
PWT PORCELAIN WALL TILE
QFT QUARRY FLOOR TILE
QZ QUARTZ
RB RESILIANT BASE
RE RESIN EPOXY - POURED
RT RUBBER TILE
SC SEALED CONCRETE
SDT STATIC DISSIPATIVE TILE
SN STAIR NOSING
SS SOLID SURFACE
STS SEALED STONE FINISH
TB TACK BOARD
TP TOILET PARTITION
TRB TERRAZZO COVE BASE - POURED
TRZ TERRAZZO - POURED FLOORING
TRZ-ST TERRAZZO - PREFABRICATED STAIR TREAD AND RISER
TS TRANSITION STRIP
WB WOOD BASE
WC WALL COVERING
WD WOOD DOOR FINISH
WDT WOOD TRIM
WF WINDOW FILM
WP WALL PROTECTION - SHEET
WPC WOOD PANEL CEILING
WT WINDOW TREATMENT - ROLLE SHADE
WWP WOOD WALL PANEL
INTERIOR ROOM FINISH SCHEDULE - LEVEL B3
ROOM # ROOM NAME
FLOOR
BASE FINISH WAINSCOT
WALL FINISH CLG CABINETS/
MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH
348 UTILITY TUNNEL EX EX EX EX EX EX EX
590 MECHANICAL EX EX EX EX EX EX EX
B300A CORRIDOR RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B301 LOADING AREA RE-1 RB-1 PT-1 PT-1/ WP-1 PT-1 PT-1/ WP-1 PT-9b 1
B302 PRINTING/LAMINATING STORAGE RE-1 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B303 ELECTRICAL RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B304 AV/EVENT STORAGE RE-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B305 MECHANICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B306 RECYCLING ROOM RE-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP
B307 EGRESS CORRIDOR RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP/PT-9a 1
XB3-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15
XB300 UTILITY TUNNEL EX EX EX EX EX EX EX
XB301 MECHANICAL EX EX EX EX EX EX EX
INTERIOR ROOM FINISH SCHEDULE - LEVEL B2
ROOM # ROOM NAME
FLOOR
BASE FINISH WAINSCOT
WALL FINISH CLG CABINETS/
MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH
B201 CENTRAL STAIR / ENTRANCE EM-1/QFT-1/ BS-1 / TRZ-1, TRZ-2 &
TRZ-3
QTB-1 / TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 2, 3, 4
B210 EXISTING CLOSET QFT-1 QTB-1 PT-1 PT-1 PT-1 PT-1 OTS-1
B211 WOMEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-9b PL-1 QZ-1 4, 5, 6
B212 MEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-9b PL-1 QZ-1 4, 5, 6
B213 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-1, PWT-3 PT-4 PT-4, TB-1 PT-1 OTS-1 PL-1 SS-1 4
B214 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 4
B215 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B216 JAN CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP
B220 CLIENT SERVICES OPEN OFFICE CPT-3 RB-1 PT-3 PT-1 PT-3 PT-1 OTS-1/ APC-2 5, 7
B221 OFFICE CPT-2 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1
B222 OFFICE CPT-2 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1
B223 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1
B224 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1
B225 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1
B226 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1
B231 CUSTODIAL RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP 1
B232 MULTI-MEDIA ARCHIVE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B233 MECHANICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B235 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B236 STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B237 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B238 STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B2100A CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/APC-1 4
B2100B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4, 8
XB2-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15
XB-201 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15
INTERIOR ROOM FINISH SCHEDULE - LEVEL B1
ROOM # ROOM NAME
FLOOR
BASE FINISH WAINSCOT
WALL FINISH CLG CABINETS/
MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH
B100B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/APC-1 4, 8
B101 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12,
PT-14, &
WDT-1
PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4
B102 WAITING AREA QFT-1/ BS-1 QTB-1 PT-5, PT-12,
PT-14, &
WDT-1
PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4
B105 FIRE PROTECTION RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B106 FIRE PROTECTION RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B107 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B108 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 ACT-1
B110 AD LAW CORRIDOR CPT-1 RB-1 PT-1 PT-1 PT-1 N/A OTS-1
B111 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B112 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B113 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B114 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B115 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B116 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B120 COLLABORATIVE SPACE TRZ-1, TRZ-2 & TRZ-3 TRB-1 N/A PT-1 N/A PT-1 OTS-1/ APC-1 4, 8
B130 MIL JUSTICE OPEN OFFICE CPT-1 RB-1 PT-1 PT-1, AWP-3 PT-3 PT-3 OTS-1/ APC-2 5, 7
B131 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B132 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B133 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B134 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1
B135 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-4, TB-1 PT-1 PT-1 PT-4 ACT-1 PL-1 SS-1 8
B140 OPEN OFFICE CPT-1 RB-1 PT-3 PT-3 PT-1 PT-1 OTS-1/ APC-2 7
B141 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
B142 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B143 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B144 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B150 AD LAW CORRIDOR CPT-1 RB-1 PT-3 N/A PT-3 PT-1 OTS-1 7
B151 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
B152 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B153 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B154 OFFICE CPT-1 RB-1 PT-3 PT-2 PT-1 N/A ACT-1 7
B155 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B156 A/V STAFF & PHOTO EDITING SUITE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 7, 10
B157 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1
B158 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1/ PT-9a
B159 A/V STAFF & PHOTO EDITING SUITE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 7, 10
B164 RECEIVING RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B165 AV/EVENT STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1
B171 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B172 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP
B173 WOMEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-9b PL-1 QZ-1 4, 5, 6
B174 MEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-15, PBN-1, MWT-2,
PWT-1
PT-9b PL-1 QZ-1 4, 5, 6
B1100A CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 N/A PT-1 OTS-1/APC-1
XB1-101 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15
XB1-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15
M A
R K
D E
S C
R
IP
T I O
N D
A T
E
IS
S U
E D
V
IA
A M
E N
D M
E N
T /1
/2
1 1 1
1 1
1 1
| Sheets |
| A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS |
| A-562 - MILLWORK DETAILS - BRIEFING ROOM |
| I-103 - LEVEL B1 FLOOR PLAN - FINISH |
| I-602 - FINISH MATERIAL SCHEDULE |
| I-603 - FINISH MATERIAL SCHEDULE |
| I-604 - FINISH MATERIAL SCHEDULE |
File details come from the government source that posted it. Updated .