I-602 - FINISH MATERIAL SCHEDULE.pdf

PDF 128 KB Posted

Attached to
LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
Solicitation number
W912DS23R0009
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This document package includes interior finish specifications and schedules for the renovation of Lincoln Hall at the United States Military Academy in West Point, New York. The specifications cover flooring, wall, and ceiling finishes for multiple levels of the building. Materials include terrazzo, stone, carpet, luxury vinyl tile, porcelain tile, and painted gypsum. Restrooms and support spaces are also scheduled. Finishes are specified for corridors, offices, conference rooms, mechanical spaces, and other facility areas. The related solicitation seeks fixed-price proposals to complete the interior renovation work outlined in the specifications by a specified due date. The United States Army Corps of Engineers will evaluate submissions and award a contract for the project.

View the file

Other files for this federal contract opportunity

Other files attached to LINCOLN HALL RENOVATION, BLDG. 607, newest first.
File Type Posted
W912DS23R0009-0005.pdf PDF
Amendment 0004.pdf PDF
I-603 - FINISH MATERIAL SCHEDULE.pdf PDF
I-604 - FINISH MATERIAL SCHEDULE.pdf PDF
S-502.pdf PDF
A-202.pdf PDF
A-204.pdf PDF
A-401.pdf PDF
A-562 - MILLWORK DETAILS - BRIEFING ROOM.pdf PDF
Supplmental laydown area at Ordnance road.pptx PPTX presentation
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS.pdf PDF
I-103 - LEVEL B1 FLOOR PLAN - FINISH.pdf PDF
L-502.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
21 30 00-001.2_R3 Fire Pump House Submittal (Cullum).pdf PDF
Lincoln Hall Specification Changes 22 JUN 2023.pdf PDF
C-001.pdf PDF
W912DS23R0009 0001.pdf PDF
CD101.pdf PDF
CS103.pdf PDF
2023.06.20 Lincoln Hall site walk through sign in sheet.pdf PDF
Lincoln Hall Drawing Changes 22 JUN 2023.pdf PDF
AS BUILT DRAWING 1A - Approximate Location of Knox BatteryAmend 1.pdf PDF
LH- H-101.pdf PDF
W912DS23R0009.pdf PDF
JA 006-23 Belden Brick.pdf PDF
JA 008-23-Ruabon Quarry Tile.pdf PDF
JA 010-23 Best Hardware Lock Cylinders and Cores.pdf PDF
Vol 1 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 03_Revised_RTA_2023-03-01.pdf PDF
Vol 2 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
Vol 3 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf PDF
LH_VOLUME 01_Revised_RTA_2023-03-01.pdf PDF
LH_VOLUME 04_Revised_RTA_2023-03-01.pdf PDF
JA 007-23 Distributed Antenna System.pdf PDF
JA 013-23 Monaco.pdf PDF
LH_VOLUME 02_Revised_RTA_2023-03-01.pdf PDF
JA 009-23 Avaya Switch.pdf PDF
JA 011-23 Ventrol AHU.pdf PDF
JA 012-23 Identiv Card Access System.pdf PDF
JA 014-23 Shark Meter.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES & REMARKS

1. INSTALL CORNER GUARD, CG-2. SEE FINISH PLANS ON I-101 TO I-107 FOR

LOCATIONS.

2. PROVIDE STONE SEALER, STS-1 AT ALL BLUE STONE LOCATIONS.

3. PROVIDE ENTRANCE MAT, EM-1 AT ENTRY. SEE FINISH FLOOR PLANS ON

I-101 TO I-107 FOR LOCATION.

4. SEE ENLARGED FINISH PLANS ON I-400 TO I-406 FOR FLOORING PATTERNS.

5. SEE RESTROOM ELEVATIONS ON A-401 FOR FINISH LOCATIONS.

6. TOILET PARTITIONS TO BE FINISH TP-1. SEE COLOR MATERIAL LEGEND ON

I-600 AND I-601.

7. SEE INTERIOR DETAILS FOR INFORMATION ON WINDOW FILM INSTALLATION.

8. INSTALL CORNER GUARD, CG-1. SEE FINISH PLANS FOR LOCATIONS.

9. INSTALL WT-1/WT-2. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

10. INSTALL WT-3/WT-4. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

11. INSTALL WT-5/WT-6. SEE FINISH PLANS ON I-101 TO I-107 FOR LOCATIONS.

12. PROVIDE ENTRANCE MAT, EM-2 AT ENTRY. SEE FINISH PLANS ON I-101 TO

I-107 FOR LOCATION.

13. STAIRS TO BE TRZ-ST1

14. PROVIDE ACOUSTIC FLOOR UNDERLAYMENT, AFU-1

15. REPAINT EXISTING RAILINGS. MATCH EXISTING COLOR AND FINISH.

16. CREST MADE OUT OF RT-5 - RT-12. SEE B2/I-406 FOR DETAILS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

I-602

F

IN

IS

H

M A

T E

R

IA

L S

C H

E D

U L E

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A S

C H

A F

E R

A S

C H

A F

E R

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

MATERIAL ABBREVIATIONS

ACT ACOUSTIC CEILING TILE & GRID

AFU ACOUSTIC FLOOR UNDERLAYMENT

APC ACOUSTICAL PANEL CLOUD

ASC ACOUSTICAL SUSPENDED CLOUD

AWP ACOUSTICAL WALL PANEL

BS BLUE SLATE

CG CORNER GUARD

CPT MODULAR CARPET TILE

CU CURTAIN FABRIC

EC ELEVATOR CEILING

EF ELEVATOR FLOOR

EM ENTRANCE MAT FLOORING

EWP ELEVATOR WALL PANEL

EX EXISTING TO REMAIN

EX-CS EXISTING CONCRETE STAIR - REFURBISHED

EX-QFT/

BS

EXISTING QUARRY FLOOR TILE AND BLUE SLATE - REFURBISHED

EXP EXPOSED

GRT GROUT

GWB GYPSUM WALL BOARD

LVT LUXURY VINYL TILE

MB MARKER BOARD

MCT METAL CEILING TILE

MES METAL EDGE STRIP

MWT MOSAIC WALL TILE

OTS OPEN TO STRUCTURE

PBN PORCELAIN BULLNOSE

PFT PORCELAIN FLOOR TILE

PL PLASTIC LAMINATE

PT PAINT

PTB PORCELAIN TILE - COVE BASE

PWT PORCELAIN WALL TILE

QFT QUARRY FLOOR TILE

QZ QUARTZ

RB RESILIANT BASE

RE RESIN EPOXY - POURED

RT RUBBER TILE

SC SEALED CONCRETE

SDT STATIC DISSIPATIVE TILE

SN STAIR NOSING

SS SOLID SURFACE

STS SEALED STONE FINISH

TB TACK BOARD

TP TOILET PARTITION

TRB TERRAZZO COVE BASE - POURED

TRZ TERRAZZO - POURED FLOORING

TRZ-ST TERRAZZO - PREFABRICATED STAIR TREAD AND RISER

TS TRANSITION STRIP

WB WOOD BASE

WC WALL COVERING

WD WOOD DOOR FINISH

WDT WOOD TRIM

WF WINDOW FILM

WP WALL PROTECTION - SHEET

WPC WOOD PANEL CEILING

WT WINDOW TREATMENT - ROLLE SHADE

WWP WOOD WALL PANEL

INTERIOR ROOM FINISH SCHEDULE - LEVEL B3

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

348 UTILITY TUNNEL EX EX EX EX EX EX EX

590 MECHANICAL EX EX EX EX EX EX EX

B300A CORRIDOR RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B301 LOADING AREA RE-1 RB-1 PT-1 PT-1/ WP-1 PT-1 PT-1/ WP-1 PT-9b 1

B302 PRINTING/LAMINATING STORAGE RE-1 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B303 ELECTRICAL RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B304 AV/EVENT STORAGE RE-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B305 MECHANICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B306 RECYCLING ROOM RE-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 EXP

B307 EGRESS CORRIDOR RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP/PT-9a 1

XB3-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

XB300 UTILITY TUNNEL EX EX EX EX EX EX EX

XB301 MECHANICAL EX EX EX EX EX EX EX

INTERIOR ROOM FINISH SCHEDULE - LEVEL B2

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

B201 CENTRAL STAIR / ENTRANCE EM-1/QFT-1/ BS-1 / TRZ-1, TRZ-2 &

TRZ-3

QTB-1 / TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 2, 3, 4

B210 EXISTING CLOSET QFT-1 QTB-1 PT-1 PT-1 PT-1 PT-1 OTS-1

B211 WOMEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

B212 MEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

B213 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-1, PWT-3 PT-4 PT-4, TB-1 PT-1 OTS-1 PL-1 SS-1 4

B214 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 4

B215 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B216 JAN CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP

B220 CLIENT SERVICES OPEN OFFICE CPT-3 RB-1 PT-3 PT-1 PT-3 PT-1 OTS-1/ APC-2 5, 7

B221 OFFICE CPT-2 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1

B222 OFFICE CPT-2 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1

B223 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1

B224 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1

B225 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1

B226 OFFICE CPT-2 RB-1 PT-1 PT-1 PT-2 PT-1 ACT-1

B231 CUSTODIAL RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 EXP 1

B232 MULTI-MEDIA ARCHIVE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B233 MECHANICAL RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B235 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B236 STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B237 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B238 STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B2100A CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/APC-1 4

B2100B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 4, 8

XB2-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

XB-201 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

INTERIOR ROOM FINISH SCHEDULE - LEVEL B1

ROOM # ROOM NAME

FLOOR

BASE FINISH WAINSCOT

WALL FINISH CLG CABINETS/

MILLWORK COUNTER TOP NOTES & REMARKSFINISH NORTH EAST SOUTH WEST FINISH

B100B CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 PT-1 PT-1 OTS-1/APC-1 4, 8

B101 CENTRAL STAIR QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

B102 WAITING AREA QFT-1/ BS-1 QTB-1 PT-5, PT-12,

PT-14, &

WDT-1

PT-1 PT-1 PT-1 PT-1 PT-9a 2, 4

B105 FIRE PROTECTION RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B106 FIRE PROTECTION RE-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B107 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B108 JANITOR'S CLOSET RE-3 RB-1 WP-1 PT-15 PT-15 PT-15 PT-15 ACT-1

B110 AD LAW CORRIDOR CPT-1 RB-1 PT-1 PT-1 PT-1 N/A OTS-1

B111 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B112 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B113 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B114 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B115 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B116 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B120 COLLABORATIVE SPACE TRZ-1, TRZ-2 & TRZ-3 TRB-1 N/A PT-1 N/A PT-1 OTS-1/ APC-1 4, 8

B130 MIL JUSTICE OPEN OFFICE CPT-1 RB-1 PT-1 PT-1, AWP-3 PT-3 PT-3 OTS-1/ APC-2 5, 7

B131 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B132 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B133 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B134 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1

B135 BREAK ROOM LVT-1/ LVT-2 RB-1 PT-4, TB-1 PT-1 PT-1 PT-4 ACT-1 PL-1 SS-1 8

B140 OPEN OFFICE CPT-1 RB-1 PT-3 PT-3 PT-1 PT-1 OTS-1/ APC-2 7

B141 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

B142 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B143 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B144 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B150 AD LAW CORRIDOR CPT-1 RB-1 PT-3 N/A PT-3 PT-1 OTS-1 7

B151 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

B152 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B153 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B154 OFFICE CPT-1 RB-1 PT-3 PT-2 PT-1 N/A ACT-1 7

B155 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B156 A/V STAFF & PHOTO EDITING SUITE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 7, 10

B157 OFFICE CPT-2 RB-1 PT-1 PT-2 PT-1 N/A ACT-1

B158 OFFICE CPT-2 RB-1 PT-1 N/A PT-1 PT-2 ACT-1/ PT-9a

B159 A/V STAFF & PHOTO EDITING SUITE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 OTS-1 7, 10

B164 RECEIVING RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B165 AV/EVENT STORAGE RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP 1

B171 ELECTRICAL CLOSET RE-3 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B172 TELECOM SDT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EXP

B173 WOMEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

B174 MEN'S RESTROOM PFT-1, PFT-2 PBT-1 PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-15, PBN-1, MWT-2,

PWT-1

PT-9b PL-1 QZ-1 4, 5, 6

B1100A CORRIDOR TRZ-1, TRZ-2 & TRZ-3 TRB-1 PT-1 PT-1 N/A PT-1 OTS-1/APC-1

XB1-101 STAIR A EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

XB1-102 STAIR B EX-CS EX PT-1 PT-1 PT-1 PT-1 PT-9a 15

M A

R K

D E

S C

R

IP

T I O

N D

A T

E

IS

S U

E D

V

IA

A M

E N

D M

E N

T /1

/2

1 1 1

1 1

1 1

Sheets
A-429 - ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS
A-562 - MILLWORK DETAILS - BRIEFING ROOM
I-103 - LEVEL B1 FLOOR PLAN - FINISH
I-602 - FINISH MATERIAL SCHEDULE
I-603 - FINISH MATERIAL SCHEDULE
I-604 - FINISH MATERIAL SCHEDULE